SOW_Material_Handling_Equipment.doc

DOC document 128 KB Posted

Attached to
PREVENTATIVE MAINTENANCE ON MATERIAL HANDLING EQUIPMENT Federal contract opportunity
Solicitation number
HSCG40-15-Q-POE999
Issued by
Department of Homeland Security US Coast Guard

About this file

Statement of Work for Material Handling Equipment

View the file

Other files for this federal contract opportunity

Other files attached to PREVENTATIVE MAINTENANCE ON MATERIAL HANDLING EQUIPMENT, newest first.
File Type Posted
SFLC_PM_Checklists.pdf PDF
SOW_Material_Handling_Equipment.doc DOC document
Ombudsman.doc DOC document
Required_Information.doc DOC document
SFLC_PM_Checklists.pdf PDF
Ombudsman.doc DOC document
Required_Information.doc DOC document
SOW_Material_Handling_Equipment.doc DOC document
SFLC_PM_Checklists.pdf PDF
Ombudsman.doc DOC document
Required_Information.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

USCG Surface Forces Logistics Center (SFLC)

Preventative Maintenance & Repair on Material Handling Equipment

1. PREVENTATIVE MAINTENANCE: Provide preventative maintenance (PM) on SFLC’s warehouse material handling equipment. Material handling equipment includes all equipment listed in below located in SFLC Buildings 85, 88, 24, N, and M.

a. PM shall take place on-site quarterly during the months of November and February.

b. Vendor shall follow the SFLC PM checklist for each respective equipment. All SFLC PM Checklists are provided as enclosure 1 (one).

c. Work shall be performed during 8am-3pm, Monday-Friday, excluding holidays. Any work outside of this time frame shall be authorized by primary SFLC POC.

d. Vendor shall obtain the Contracting Officer’s Representative’s approval signature at the time of inspection on all PM checklists.

e. PM Inspection report shall include contractor’s recommended repairs and any other pertinent information.

f. Submit PM inspection reports to primary SFLC POC by e-mail no later than five (5) business days after inspection.

a. PM inspection shall include, but is not limited to the following:

EQUIPMENT LIST:

Nomenclature
Make
Model
Serial Number
Location

Electric - Other

FORKLIFT, CLARK
CLARK
CST15-150SS
CST15-0250-6936FP
BLDG 24
FORKLIFT, CLARK 09
CLARK
NP22
NP220017PM8105
BLDG 85
FORKLIFT, CLARK 12
CLARK
TM25
TM24704019058FB
BLDG 88
FORKLIFT, CLARK 13
CLARK
TM25
TM247-0402-9058FB
BLDG 88
FORKLIFT, CLARK 14
CLARK
TM25
TM24710079091FB
BLDG 88
FORKLIFT, CLARK 15
CLARK
CMP757D
CMP570D-0015-9686KF
BLDG 88
FORKLIFT, CLARK 16
CLARK
NPR20
NPR345-0060-9417FB
BLDG 88
FORKLIFT, CLARK 30
CLARK
CGP40
P460D03019507FB
BLDG 85
FORKLIFT, CLARK 31
CLARK
CGP40
CGP460D03009507FB
BLDG 85
FORKLIFT, CLARK 410
CLARK
TMX25
TMX250-1410-9597KF
BLDG 88
FORKLIFT, CLARK 429 / 55
CLARK
CMP757D
CMP570D-0429-9590KF
BLDG 88
FORKLIFT, CLARK 487
CLARK
ECX32
ECX360-0487-9653KF
BLDG 88
FORKLIFT, CLARK 648
CLARK
ECX32
ECX360-0648-9653KF
BLDG 88
FORKLIFT, CLARK 730
CLARK
TMX25
TMX250-0730-9597KF
BLDG 88
FORKLIFT, CLARK 899
CLARK
ECX32
ECX360-0899-9653KF
BLDG 88
FORKLIFT, CLARK 900
CLARK
ECX32
ECX360-0900-9653KF
BLDG 88
FORKLIFT, DREXEL 19
DREXEL
SL-443
17751256
BLDG 85
FORKLIFT, DREXEL 20
DREXEL
SL-443
17751257
BLDG 85
FORKLIFT, DREXEL 66
DREXEL
SL-66
50702B0603
BLDG 88
FORKLIFT, OMEGA
OMEGA LIFT
4DH12-12Q-62P
OM31OML12
BLDG 88
FORKLIFT, CRAB
RAYMOND
4D-RY5TT
EF-A-06-35138
BLDG 85
FORKLIFT, YALE 9
YALE
RC060FCN36SE0
N394810
BLDG 85
FORKLIFT, YALE 200
YALE
ERC070VX
A968N02200G
BLDG 88
FORKLIFT, YALE 201
YALE
ERC070VX
A968N02201G
BLDG 88
PAC MULE
WESLY INT’L
CC- 625-6SA
CC3523
BLDG N
LIFT TRUCK, HOIST
HOIST
P360
29846
BLDG 85
FORKLIFT, BENDI
LANDOLL
B55/56E 180D
B55/56AC-1212A-07494
BLDG N

Electric - Raymond

FORKLIFT, RAYMOND 368
RAYMOND
SB-CSR30T
SB-08-01368
BLDG 88
FORKLIFT, RAYMOND 405
RAYMOND
SB-CSR30T
SB-08-01405
BLDG 88
FORKLIFT, RAYMOND 490
RAYMOND
SB-CSA30T
SB-09-01490
BLDG 88
FORKLIFT, RAYMOND 757
RAYMOND
SB-CSR30T
SB-0300757
BLDG 88
FORKLIFT, RAYMOND 958
RAYMOND
SB-CSR30T
SB-05-00958
BLDG 88
FORKLIFT, RAYMOND 959
RAYMOND
SB-CSR30T
SB-05-00959
BLDG 88
FORKLIFT, RAYMOND 960
RAYMOND
SB-CSA30T
SB-05-00960
BLDG 88
FORKLIFT, RAYMOND 841
RAYMOND
970-CSR30T
970-1302841
BLDG 88
FORKLIFT, RAYMOND 842
RAYMOND
970-CSR30T
970-1302842
BLDG 88
FORKLIFT, RAYMOND 843
RAYMOND
970-CSR30T
970-1302843
BLDG 88
FORKLIFT, RAYMOND 845
RAYMOND
970-CSR30T
970-1302845
BLDG 88

Sweeper

SWEEPER, TENNANT 530E
TENNANT
530E
530-8120
BLDG 88
SWEEPER, TENNANT 5700
TENNANT
5700XP
5700-7785
BLDG 88
SWEEPER, TENNANT 8300
TENNANT
8300
8300-4758
BLDG 88
SWEEPER, OUTDOOR
TENNANT
S20
S20-2594
BLDG 85

Cart

CART, CUSHMAN
CUSHMAN
COMMANDER
2666669
BLDG 88
CART, E-Z-GO #1
TEXTRON
MINUTE MISER E
2279915
BLDG 88
CART, E-Z-GO #2
TEXTRON
MINUTE MISER E
LM933
BLDG 88
CART, E-Z-GO #3
TEXTRON
MINUTE MISER E
LM3982
BLDG 88
CART, E-Z-GO #4
TEXTRON
MINUTE MISER E
2647738
BLDG 88

Propane

FORKLIFT, ALC419
TUSK
500PG-16
204424A
BLDG N
FORKLIFT, ALC420
TUSK
500PG-16
204423A
BLDG N

2. REPAIR: Provide repair on all machines, as per the established contract.

a. Repairs must take place on-site within twenty-four (24) hours of notification.

b. A written cost estimate must be submitted to, and approved by, primary SFLC POC for all repairs before start of work.

3. PARTS: Install necessary parts for equipment repair.

a. Only Original Equipment Manufacturer (OEM) parts are authorized. If OEM parts are not available, contractor is to notify primary SFLC POC for pre-authorization.

b. A written cost estimate must be submitted to, and approved by, primary SFLC POC for all parts before start of work.

c. Vendor is to purchase necessary parts to install based on approved written cost estimate.

4. INVOICES: Submit all invoices to primary SFLC POC by e-mail within 30 calendar days after performance of work.

a. Submit separate invoices for PM work and parts/repairs.

b. SFLC POC will approve invoices and send to the Coast Guard Finance Center for payment.

5. CONTRACT PERSONNEL: Vendor shall give an eighteen (18) hour notice to SFLC primary POC, and gain approval, of intended day and time of arrival of contractor personnel. Failure to gain approval may result in contractor personnel being restricted from entering the CG Yard base.

6. GOVERNMENT PROPERTY: All equipment listed in paragraph two (2) are CG-owned assets and are classified as Government General Purpose Property (GPP) or Government Capitalized Property (CAP). Government property shall not be removed from the premises unless approved by SFLC Accountable Property Officer, SKCS Terence McNally.

7. USCG SURFACE FORCE LOGISTICS CENTER (SFLC) POINTS OF CONTACT:

a. Primary:

· Sarah Morin

(410) 762-6969 E-mail: Sarah.E.Morin2@uscg.mil

b. Secondary’s:

· Lara Cooper

(410) 762-6689 E-mail: Lara.A.Cooper@uscg.mil

· Charlene Schiele

(410) 762-6448 E-mail: Charlene.M.Schiele@uscg.mil

c. Warehouse:

· Russell Serpas

W: (410) 762-6378 C: (443) 540-0484 E-mail: Russell.W.Serpas@uscg.mil

File details come from the government source that posted it. Updated .