RESPONSES TO QUESTIONS.docx

DOCX document 26 KB Posted

Attached to
MARINE STURCTURAL (SHIPFITTER) SERVICES
Solicitation number
HSCG40-12-R-61421
Issued by

View the file

Other files

File Type Posted
A0001 CONTINUATION HSCG40-12-R-61421.docx DOCX document
Amendment A0001 HSCG40-12-R-61421.pdf PDF
RESPONSES TO QUESTIONS.docx DOCX document
PWS Surge Marine Structural--Final Revision —
ATTACHMENT 4-SITE VISIT INFORMATION.doc DOC document
SF1449-Structural.pdf PDF
Attachment 2-Wage Determination.pdf PDF
Structural Solicitation Package-FINAL.doc DOC document
ATTACHMENT 1-PAST PERFORMANCE.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO QUESTIONS:

Question 1: Must the Supervisor be a skilled tradesman of the specific disciple (e.g., pipefitter, insulator, etc.) or may the Supervisor be a shipboard manager well-versed and experienced in numerous ship repair disciplines? Since none of the individual Solicitations project full-time equivalency (FTE) for any of the Supervisors, one experienced manager could oversee simultaneous shipboard projects.

Answer 1: Supervisors must be experienced in accordance with the Performance Work Statement, Section 1.5.12.1.

Question 2: The estimated manning requirements are very small. Is this a realistic level of effort or does the Government anticipate an increased quantity?

Answer 2: As stated in the solicitation (The Schedule), the number of hours listed are estimations only not a guarantee or commitment of orders.

Question 3: Is the Government considering issuing multiple Contracts for each Solicitation? Has the Government thought about the economies of scale inherent in awarding a single Contract for each procurement to the same bidder?

Answer 3: A single award will be made for each solicitation.

The Government could award a contract for each solicitation to the same bidder.

Question 4: Marine Painter Solicitation HSCG40-12-R-61421:

(1) Does all work projected to be issued require QP 1 certification?

Yes

(2) If a bidder does not possess QP 1 certification, will the use of a subcontractor who is QP 1 certified be allowed?

Subcontractors are allowed that are QP1 certified; however, the prime contractor holds the responsibility for the contract.

As stated on page 26 of the solicitation, Instructions to Offerors – Commercial Items, Proposal Submission Requirements, Certifications: The offeror must submit evidence of SSPC membership and QP1 Certification at the time the proposal is submitted. Failure to provide submission requirement may result in the contactor offer being omitted and not being considered for award.