Statement of Work and compartment list

View the file

Other files

File Type Posted
FAX quote request.doc DOC document
Ombudsman.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT of WORK For

Pipe Covering Services

Procurement Request: 2112402Y61A0444005 CGC Escanaba Yard POC: LT. Matthew Keller 410-320-9200 Tentative Start Date: 28 February 2012 or sooner LT. Keller will contact the Contractor when services are actually required.

The Coast Guard Yard is required surge pipe insulators to cover chill water piping onboard the 270’ CGC Escanaba. The Insulation contractor will be provided a list of compartment spaces which require piping to be covered. There will be approx 1,045 ft of chill water piping to be insulated. All piping insulation materials will be provided by the CG Yard. All insulation will be rubber armaflex type, ranging from ¼” diameter to 2-1/2” in diameter. All rubber shall be then covered with braddish cloth.

COMPT #
COMPT NAME
COMPONENTS TO BE RE-InSULATED
Known Linear ft req replacement
02-45-0-Q
Fan Space
Piping Components
20’
02-106-0-Q
Electronics Equipment Space & Storeroom
Piping Components
30’
01-103-0-Q
Avionics Work Shop
Piping Components
34’
1-12-0-Q
Anchor Windlass and Bos’n Workshop
Piping Components
30’
1-262-L
26-Passageway
Piping Components
76’
1-47-0-L
47-Passageway
Piping Components
15’
1-51-2-L
Sanitary Space/FWD Deck Head
Piping Components
20’
1-73-1-Q
Log Office
Piping Components
20’
1-82-1-L
82-Passageway
Piping Components
80’
1-96-1-L
96-Passageway (Vestibule)
Piping Components
16’
1-103-1-L
103-Passageway
Piping Components
130’
1-117-1-Q
Mess Deck Fan Space
Piping Components
62’
1-186-01-L
Aft Chief Passageway
Piping Components
28’
1-207-1-L
Passageway (Vestibule)
Piping Components
10’
2-82-0-E
Auxiliary Machinery Space (AMS) #1
Piping and Both Chiller Plants
325’
3-47-0-C
Communications Center
Piping Components
48’
3-82-0-E
Engineering Control Center
Piping Components
100’