65_T-Boat_Drydock_Specs_AUGUST_2014.docx

DOCX document 645 KB Posted

Attached to
T-Boat Preservations/Repairs
Solicitation number
HSCG39-14-Q-PCW498
Issued by

About this file

Specs

View the file

Other files

File Type Posted
Scope_of_work_AUGUST_2014_drydocking_(2).docx DOCX document
WDOL.PDF PDF
SF-1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

65 FT T-BOAT DRYDOCK REPAIR

USCG ACADEMY 65 FOOT CLASS TRAINING BOAT

DRYDOCK REPAIR SPECIFICATIONS

AUGUST 2014

USCG Academy Waterfront 15 Mohegan Avenue New London, CT 06320

TABLE OF CONTENTS

Work

ItemTitlePage
List of Sketchesiii
Not applicable.iii
Revisions Recordiv
List of Applicable Referencesv
List of Government / industrial-furnished Propertyvii
List of Critical Inspection Itemsviii
Specification Feedbackix
Principal Characteristicsx
General Requirementsxi
WORK ITEM 1: Routine Drydocking, Provide1
WORK ITEM 2: Inside Classroom, Perserve "100%" ( 1 Boat RESPECT)3
WORK ITEM 3: Bilges, Preserve5
WORK ITEM 4: Bilge, Compartment(s) Interior, Lead Dust, Clean8
WORK ITEM 5: Fixed Ballast (Lead Ingots), Reinstall in Containment Boxes13
WORK ITEM 6: Underwater Body, Preserve20
WORK ITEM 7: Marine Chemist Services, Provide (If Necessary)25
WORK ITEM 8: Temporary Logistics, Provide26

List of Sketches

ItemSketch NumberPage
Not applicable.

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

List of Applicable References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:

http://www.uscg.mil/SFLC/mlclant/vdiv/standard_specifications.asp Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.

Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with SFLC Standard Specification 0000, paragraph 3.2.1.1 (Order of Precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.

FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS

MIL-PRF-16173E, Jan 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-24647D, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting

OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS

DOCUMENTS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Logistics

DRAWINGS

Drawings will be provided by USCG Academy personnel on request

PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual, June 2006 Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series) Naval Engineering Manual, March 2011 NAVSEA Technical Manual (NSTM), (Jan 2008) Chapter 505-Piping Systems

INDUSTRY STANDARDS

ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2004, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning

List of Government / industrial-furnished Property The following is a list of property, which the Government / industrial will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period in accordance with SFLC Std Spec 0000:

Item Title

Specification Feedback

The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.

If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:

http://apps.mlca.uscg.mil/vdiv/surveys/Post_availability/ If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:

http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.

Principal Characteristics

65 FT T BOAT

HULL MANUFACTURED
Steel
LENGTH OVERALL
65 feet
BEAM, MAXIMUM
17 feet 7.5 inches
FULL LOAD DRAFT
7 feet
DISPLACEMENT AT MEAN DRAFT
95 Long Tons
HEIGHT OF HIGHEST PROJECTION
20’
MAX SUSTAINED SPEED
N/A
RANGE
75 Nautical Miles
MISSION LIMITS
10 Nautical Miles
SURVIVABILITY LIMITS
N/A

PROPULSION

TYPE
Scania DI12
NUMBER OF UNITS
1

PROPELLER SHAFT

TYPE
1
PROPELLERS
1 – 3 blade 32” pitch 46” dia.

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. APPLICABLE DOCUMENTS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual, Jun 2006 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.

NOTICE!

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Authorized coating systems. The Contractor shall be aware that all coatings and coating systems authorized for use on Coast Guard cutters and boats are listed in COMDTINST M10360.3, Appendix C; however, the “International Interfine 979” Polysiloxane System is no longer an authorized system.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: www.uscg.mil/directives/default.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.

WORK ITEM 1:

Page iv (Draft 0)

13_ 0813_USCG Academy T-boat WORK ITEM 1: Routine Drydocking, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to drydock and undock the boat and perform various drydocking-related tasks.

1.2 Government-furnished property.

None

2. REFERENCES

Coast Guard Drawings Provided by U.S. Coast Guard Academy personnel if necessary Coast Guard Publications Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2012, Drydocking Other References None

3. REQUIREMENTS

3.1 General.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

None.

3.2 Docking requirements. The Contractor shall drydock and undock the boat, in accordance with SFLC Std Spec 8634 using vessel drawings Provided by Coast Guard Academy personnel as guidance.

3.2.1 Cutter Conditions. The Contractor shall use the Full Load Condition, listed below for purposes of performing Pre-Award calculations as described in Appendix A (Requirements for Calculations) of SFLC Std Spec 8634.

Displacement (LT): 95.00

3.2.1.1 Cable, sling, or strap tension calculation. If the Contractor plans to use a vertical lift, crane, or travel/mobile lift to haul out the vessel, the Contractor shall submit the cable, sling, or strap tension calculation specified in Table A1 and paragraph A2.7.2.7 of SFLC Std Spec 8634 with the Pre-Award calculations, using the loading condition specified in paragraph 3.2.1.

3.2.2 Blocking position. Ensure that the minimum keel block height is 36 inches above the docking facility deck.

3.3 Immediate work and routine inspections The Contractor shall perform designated routine drydocking work, in accordance with SFLC Std Spec 8634, paragraph 3.4.4 (Within twenty four hours after docking).

NOTE

Fuel offloading is not mandatory to drydock the vessel.

4. NOTES

This section is not applicable to this work item.

13_ 0813_USCG Academy T-boat WORK ITEM 2: Classroom, Preserve

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the interior of the boats classrooms (ONLY 1 BOAT – RESPECT).

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Provided by U.S. Coast Guard Academy personnel if necessary.

Coast Guard Publications Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 Condition found Report (CFR). The Contractor shall submit a CFR for any wasted steel that needs to be replaced and for any other repairs.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

Known interferences include, but are not limited to the below-listed:

· Electrical wiring

· Electrical boxes

· Electrical outlets

3.1.5 Substrate visual inspection. Upon completion of surface preparation and prior to application of primer coat (see 3.2 (Surface preservation)), the Contractor shall perform a visual inspection of the prepared surfaces; submit a CFR.

3.1.6 Lead abatement requirements. The Contractor shall review the USCG Academy supplied lead paint survey. If lead paint is present the Contractor shall be aware of lead content at or in excess of 0.06 percent by weight (0.12 mg/cm2, or 600 ppm) in the existing coating system. If lead paint is present ensure that no visible coatings remain on any part of the substrate, including pitted areas, after completion of surface preparation.

3.2 Surface preservation. The Contractor shall prepare and coat the interior surfaces including all adjacent structural members, using the system specified for Bulkheads (Bulkheads and Overheads, Un-insulated Steel), Option I or II in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). Apply finish/top coat color to match existing adjacent surfaces.

3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

WORK ITEM 3: Preserve Bilges - Foc’sle, Cargo-hold, Machinery Space and Lazarette, Preserve

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the bilge surfaces of the following:

· Foc’sle (aft of the chain locker back to the bulkhead separating the foc’sle and cargo-hold)

· Cargohold (bilge pump compartment)

· Machinery Space (bilge pump compartment and compartments containing lead)

· Lazarette (bilge pump compartment)

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Publications Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Other References None.

3. REQUIREMENTS

3.1 General.

3.1.1 Condition found Report (CFR). The Contractor shall submit a CFR for any wasted steel that needs to be replaced and for any other repairs.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

Known interferences include, but are not limited to the below-listed:

· Bilge pumps

· Deck plates

· Electrical wiring

· Piping

3.1.5 Substrate visual inspection. Upon completion of surface preparation and prior to application of primer coat (see 3.2 (Surface preservation)), the Contractor shall perform a visual inspection of the prepared surfaces; submit a CFR.

3.2 Surface preservation. The Contractor shall prepare and coat the designated bilge surfaces, including all adjacent structural members, using the system specified in SFLC Std Spec 6310 for “Bilges, Cofferdams, and Forepeaks, Option II” in Appendix B (Cutter and Boat Interior Painting Systems).

3.2.1 Ensure that surface preparation method for “Machinery Spaces” is used.

3.2.2 Red (20152) will be used as the finish/top color coat.

3.3 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.

WORK ITEM 4: Compartment(s) Interior, Lead Dust, Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean lead dust the location(s) identified in Table 1:

Table 1 - Compartments for Cleaning

Name
Description
Foc’sle
All bilge compartments containing lead ballast ingots.
Engine Room
All bilge compartments containing lead ballast ingots.

1.2 Government-furnished property.

2. REFERENCES

Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures.

3.1.3.1 General. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.2 Specific. The Contractor shall abide by all lead and asbestos abatement compliance requirements, as specified in SFLC Std Spec 0000. Abide by the following additional safety precautions during the lead dust clean-up operation:

Separate contaminated areas from other areas.

Do not permit non-essential personnel in the work area.

Work in one compartment at a time.

Prevent dust from migrating to other areas, as follows:

· Seal doors, hatches, and all other openings between the work area other areas with an airtight barrier, such as fire-rated polyethylene; seal both sides (inside the construction area, and inside the adjacent area) to provide a secondary dust barrier and prevent the doors and windows from being used (post alternative emergency exits, if applicable).

· Ensure that the work area remain under negative pressure in relation to adjacent areas.

NOTE

Negative pressure means that more air is exhausted from the area than is supplied so that lead dust and asbestos particles are contained within the work area, and do not contaminate adjacent non-affected compartments. Exhaust air must be filtered with a suitable HEPA filter.

· Take, at a minimum, the following measures, to protect de-contamination workers:

· Use a HEPA (high-efficiency particulate air) vacuum - never use a conventional vacuum. A HEPA vacuum removes 99.97% of particles that are less than 0.3 microns in size.

· Never use compressed air; never dry sweep.

· Workers must wear a respirator which is approved by NIOSH and has N100, P100 or R100 filters (the cartridges are usually purple); respirators must be fit-tested to insure proper seal, and employees must be medically screened and trained prior to wearing a respirator (see the OSHA Respirator Standard, 29 CFR 1910.134).

· Workers must wear full-body protective clothing, head covering and shoes (or shoe covers).

· Workers must not leave the work area without having gone through a proper decontamination process, to prevent spread of lead dust to un-affected areas.

· Eating, drinking and smoking are prohibited in work areas.

· Workers must wash hands and face before eating, drinking or smoking.

· Workers must remove work clothes and shoes before leaving the work area, and seal work clothes in plastic.

· Workers must shower and wash hair as soon as possible after leaving the work area.

· Non-disposable work clothes must be washed separately from other clothes.

3.1.3.3 Remove protective covers, to allow for performance of lead dust cleaning and wipe sampling tasks, as specified in 3.2 (Clean-up particulars) and 3.3 (Clearance examination – post cleaning), respectively. Reinstall protective covers, after said tasks have been completed.

3.1.3.4 Remove and dispose of all protective covers, upon completion of work.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Deck plates, including associated hardware.

Bilge pumps Electrical wiring Piping

3.1.5 Certification requirements. The Contractor shall ensure that all contractors and subcontractors performing cleanup or sampling must possess all applicable Federal and state certification licenses for lead work and lead sampling. Submit documentation of these certifications to the KO within 48 hours prior to commencing work.

3.1.6 Applicable drawing(s). None

3.2 Clean-up particulars. The Contractor shall, upon completion of existing lead ballast ingot removal and following installation of lead ballast containment boxes, accomplish the steps provided below in the compartment(s) designated for clean up, in addition to any other location used as a temporary stowage location for the lead ballast ingots:

NOTES

Ballast ingot removal and reinstallation is specified in a separate work item titled “Fixed Ballast (Lead Ingot), Remove and Reinstall”.

Step 1 - Debris Removal: Remove all gross debris, paint chips, etc. using either a vacuum with a HEPA filter or by spraying the materials with water in a spray bottle and picking up chips or large pieces of lead contaminated debris by hand.

Step 2 – Vacuum Cleaning: Using a suitable HEPA vacuum, clean all affected surfaces, following the following guidelines:

Begin that cleaning begins with high areas first – with overhead surfaces and bulkheads working downward.

Vacuum all surfaces in the compartment.

Work in the direction furthest from the entry door toward it.

Step 3 – Wet Cleaning: Following thorough HEPA vacuuming, wash all surfaces with any suitable cleaning detergent following the same cleaning pattern (high to low/ furthest from and toward entrance). Change the cleaning solution as it becomes dirty. Rinse all areas with a fresh cloth/mop. Do not reuse contaminated mops and cloths. Use a three-bucket system for cleaning. (Detergent solution in first bucket/ rinse water for mop in second/ surface rinse on deck and/or bilge surfaces.

Step 4 – Vacuum Cleaning: Perform a HEPA vacuum again as specified in “Step 2”.

Step 5 – Waste Disposal: Properly dispose of lead contaminated materials, in accordance with all applicable Federal, state, and local regulations.

WARNING

1. Work Wet, Work Smart, and Work Clean. DO NOT GENERATE DUSTS. It is easier to effectively clean an area when dusts are not being generated to resettle on previously cleaned areas! Worker exposures may be high during wet sweeping.

2 A wet/dry HEPA unit is ideal for working with leaded dust clean up.

3. Lead-contaminated objects that are porous or materials that may suffer damage from water may not be able to be sufficiently decontaminated by these methods and should be discarded.

3.3 Clearance examination – post cleaning. The Contractor shall accomplish the following tasks after completion of all cleaning operations,:

3.3.1 Visual inspection. In the presence of the COR, conduct a visual inspection to ensure that no chips, dust, or cleaning material haze are present. Submit a CFR.

3.3.2 Wipe sampling. In accordance with ASTM 6966 and as designated by the Coast Guard Inspector conduct wipe sample clearance testing in ten locations for each designated compartment, to ensure there are no lead dust residues in excess of the below-listed concentrations. As designated by the COR, conduct clearance testing in two locations in any other location used as a temporary stowage location for the lead ballast ingots. Submit a CFR with sample results.

200 micrograms/square foot (mcg/ft 2) –for all other areas.

3.3.2.1 Ensure dust lead samples are analyzed by a laboratory certified by the National Lead Laboratory Accreditation Program (NLLAP) or the American Industrial Hygiene Association.

3.3.2.2 If laboratory analysis shows lead concentrations in excess of the thresholds specified above, then perform lead dust cleaning, and take subsequent wipe samples until the concentration of lead falls below the above standards.

NOTE

For a listing of certified laboratories, go to www.aiha.org.

3.3.2.3 The Contractor shall be aware that the Coast Guard reserves the right to coordinate additional wipe clearance testing, at no cost to the contractor, to verify the sample results.

3.2.3.4 The Contractor shall witness all additional wipe clearance testing conducted by the Coast Guard to verify where and how samples were collected – and thus, prevent contract disputes.

WORK ITEM 5: Fixed Ballast (Lead Ingots), Reinstall in Containment Boxes

1.1 Intent. This work item describes the requirements for the Contractor to reinstall existing fixed ballast (lead ingot, pig) in containment boxes, in the location(s) listed in Table 1.

Table 1 - Ballast Location

Location
Space
TOTAL INGOT WEIGHT

(lbs)

Engine Room
Bilge compartments forward of engines and areas along port side of vessel
Unknown
Foc’sle
Bilge compartments aft of chain locker and areas along port side of vessel
Unknown

1.2 Government-furnished property.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures Other References ASTM International (ASTM) A36, 2008, Standard Specification for Carbon Structural Steel ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards Federal Specification (Fed Spec) QQ-L-171, Mar 1988, Lead Pig MIL-A-24456, Jun 1979, Adhesive for Plastic Vibration-Damping Tile MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Deck plates Bilge pumps Electrical wiring Bilge framing Piping

3.1.5 Certification documentation. At the Arrival Conference, the Contractor shall submit documentation to the COR demonstrating that all primary and sub contractors possess all Local, State, and Federal certification licenses for dealing with lead hazards.

NOTES

1. Extensive health, safety, and environmental requirements for work involving lead-based paint abatement are addressed in Appendix A of SFLC Std Spec 0000. Additional requirements are specified in paragraph 3.6.4 of the “General Requirements” item – and include, but are not limited to the following:

+ Additional protective measures.

+ Lead dust clean-up.

+ Clearance sampling + Wipe sampling.

+ Laboratory analysis.

2. It is essential that the prime and subcontractor are aware of and adhere to these requirements and all other requirements specified herein in this work item.

3.2 Removals. The Contractor shall remove and retain the existing lead ballast ingots in the designated ballast location, shown in Figure 1 (Location of Ballast Installations). Remove and dispose of existing rubber lining between longitudinal and transverse structural members in accordance with federal, state, and local regulations.

Figure 1. Location of ballast installations

NOTE

It is not required that the retained ballast ingots be removed completely from the cutter. The Contractor shall adhere to the requirements in 29 CFR 1910.1025 where any retained or new ingots are staged.

WARNING

Lead is a toxic and hazardous substance. All ingots must be wet prior to handling, to minimize generation of airborne lead oxide dust when ingots are handled.

3.3 Ingot inspection and weighing. The Contractor shall accomplish the following tasks, upon ingot removal, and submit a CFR:

3.3.1 Perform a visual inspection of each ingot, to determine any existing damages; in addition, document any ingot found to be not in conformance to Fed Spec QQ-L-171 Grade B or Grade C.

3.3.2 Weigh and document the exact total weight of the removed ingots.

3.3.3 Dispose of all ingots, as designated by the COR, found to be damaged and non-compliant for reinstallation. Adhere to 29 CFR 1910.1025 for staging and temporarily stowing retained ingots.

NOTE

Lead ingots may be retained and staged in existing installation location(s) if staging is compliant with 29 CFR 1910.1025.

3.4 Ballast box fabrication. Prior to lead ingot reinstallation, the Contractor shall fabricate ballast box(s) necessary to contain the existing amount of ballast ingots, in the same location as original, and as follows:

Ballast box(s) shall not be installed in the way of any limber/drain holes or any place that would create interference or impairment to the inspection and maintenance of shipboard systems.

Ballast box(s) shall be entirely independent from the hull structure.

Ballast box(s) shall be fabricated from 10 Gauge ASTM A36 plate or A1011-SS36, type 2 sheet steel.

All box side and bottom seams in shall be welded in accordance with SFLC Std Spec 0740.

The top edge of the each box side shall end with a right angle, inward flange, forming at least one inch of material to support box lid and gasket material.

WARNING

Do not weld on shell plating or adjacent hull structure. Failure to adhere to this warning risks hull breach.

3.4.1 Dimensions. The Contractor shall ensure all new ballast box(s) are fabricated to fit within the confines of the bilge compartments where the lead ingots are currently located and as follows:

Allow for the inclusion of the rubber lining.

3.4.2 Preservation. The Contractor shall prepare and coat all internal and external surfaces of each new ballast box using the system specified in paragraph 3.3 (Substrate preservation).

3.4.3 Rubber lining. After ballast box preservation, the Contractor shall install rubber lining in each new ballast box(s) as follows:

Secure one layer of 1/8" thick rubber lining, conforming to MIL-PRF-1149, to sides and bottom of ballast box using adhesive conforming to MIL-A-24456, as shown in Figure 1.

After Coast Guard Inspection verifying satisfactory lead ingot placement within their ballast box(s), cover the top of the lead ingots with one layer of 1/8-inch thick rubber conforming to MIL-PRF-1149 .

3.4.4 Cover plate gasket. After placing the rubber lining over the lead ingots, the Contractor shall install new gasket material conforming to ASTM D1330 (Grade II) in accordance with Figure 1.

3.4.5 Closure. After covering the lead ingots with rubber lining, the Contractor shall ensure the ballast box(s) lid seals completely and tightly to the ballast box as follows:

Six compression cam latches (similar to McMasters-Carr Part# 1619A11, or equivalent) are installed: One latch on each short end of the lid, and two each on the forward side and aft side.

A chalk test is performed and latches adjusted as necessary to ensure a tight seal between the cover plate and ballast box.

Figure 1. Sketch of ballast box installation

3.5 Cleaning.

3.5.1 Clean all lead ingots free of adhering foreign matter before placing them in the ballast box(s).

3.5.2 Clean all limber/drain holes in the transverse and longitudinal structure in the way of the ballast box installation to ensure water does not collect around the ballast box(s).

CAUTION

Do not change tank(s) liquid levels during ballast removal or installation.

3.6 Lead ingot installation. The Contractor shall ensure lead ingots are installed in the ballast box(s) as follows:

Cut as needed to enable placement.

Evenly distributed.

Tightly placed with the long axis of the ingots laid fore and aft to obtain maximum density and impair shifting while the ship rolls and pitches.

Final stack height does not impede ballast box closure.

3.7 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems).

3.8 Documentation. Upon completion of work, the Contractor shall submit a CFR documenting the following:

Drawing of constructed ballast box(s), including dimensions Exact locations where the ballast box(s) and ingots were installed, specifying the frames and longitudinals bounding the spaces Number of ingots and estimated, total ingot weight installed in each ballast box.

4.2 Hazard Communication. Coast Guard personnel will apply appropriate Hazardous Material caution decals onto all newly installed lead containment boxes as shown below.

Figure 6. Hazardous Material Decal

WORK ITEM 6: U/W Body, Preserve

1.1 Intent. This work item describes the requirements for the Contractor to preserve the U/W body surfaces.

NOTE

U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Provided by U.S. Coast Guard Academy personnel if necessary

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual, June 2006 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting

3. REQUIREMENTS

3.1 General.

3.1.1 Coating system visual inspection The Contractor shall perform a visual inspection of the existing U/W body coating system. Document the condition found as “Condition A” or “Condition B”, as applicable (see 3.2 “Partial – Condition A” preservation particulars and 3.5 “Partial - Condition B” preservation particulars (see 5.1 (Definitions)).

3.1.2 Reporting The Contractor shall submit a C.I.R.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). Specific areas/equipment/components to be protected include, but are not limited to:

· All scuppers and overboard discharges.

· Waterline area where U/W body coating system interfaces with freeboard coating system (unless u/w body surfaces are also being preserved).

· Fathometer transducer surfaces.

· Sea valve openings.

· Propeller shaft bearings and seals.

· Rudder bearings.

· Propellers

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

· Sea chest grating.

3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether or not all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.

3.1.6 Surface preparation optional methods. The Contractor has the option of using either high/ultrahigh pressure water Jetting or abrasive blasting to achieve the required surface preparation, prior to application of the coating system specified in 3.2 (Preservation requirements). The Contractor may add abrasives to the waterjet stream, for one or both of the following reasons:

· Achieving greater productivity.

· Achieving the required surface profile.

NOTE

Waterjetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.

3.2 “Partial – Condition A” preservation particulars. If “Partial - Condition A” exists the Contractor shall accomplish the following tasks:

3.2.1 Surface preparation.

3.2.1.1 Clean all areas where the U/W hull substrate is exposed to “SSPC-SP 10/NACE No. 2, Near-White Blast Cleaning”, with a 1.5 to 2.5 mil anchor profile; or to "SSPC-SP 12/NACE No. 5, WJ-2/L”.

3.2.1.2 Lightly clean the remaining surfaces of the u/w body to “SSPC-SP 7/NACE No.4, Brush-off-Blast Cleaning”, or to “SSPC-SP 12/NACE No. 5, WJ-4”.

3.2.1.3 Where new coating is to be merged into existing coating, provide an approximately 3-inch wide, smoothly tapered boundary from the existing coating into to the prepared surfaces.

3.2.2 Coating application.

3.2.2.1 Apply anticorrosive (AC) coating conforming to MIL-PRF-24647, to match existing color scheme, and achieve a total DFT (existing and new coats) of 10-12 mils DFT over the U/W hull surfaces.

3.2.2.2 Apply ablative copper antifouling (AF) paint conforming to MIL-PRF-24647 (Type II, Class 1, Grade A), to match existing AF color scheme, and achieve a total DFT (new and existing AF coats) of 10-12 mils over the u/w body surfaces. Where AF paint is being applied over AC undercoating, ensure that the AC coating is still tacky, before applying AF paint.

3.3 Draft mark painting. The Contractor shall paint all draft marks with one white (17925) coat of a “Polysiloxane” coating, at 2.0-3.0 mils DFT.

NOTES

1. Existing coating system on the U/W body surfaces may have a nominal thickness in excess of that which was originally installed, as a result of “patch-coats” applied during past drydock availabilities.

2. Surfaces being preserved are considered “critical-coated surfaces”.

3. A “Tooke Paint Inspection Gage” may be used for inspection and thickness measurement (in accordance with ASTM D4138) of single or multiple coats on any substrate.

3. All authorized coating materials and suppliers, and coating colors are listed in COMDTINST M10360.3 Appendix C (Authorized Coatings for Use on Cutters and Boats) and Chapter 11 (Cutters and Boats Colors – Exterior and Interior), respectively.

3.4 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

3.5 “Partial - Condition B” preservation particulars. If “Partial - Condition B” exists the Contractor shall accomplish the following tasks:

3.5.1 Surface preparation. Remove all remnants of AF coating (if existing), all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose anti-corrosive (AC) coating by water-jetting (SSPC-SP 12/NACE No.5) or abrasive-off-blasting (SSPC-SP 7/NACE No.4).

3.5.2 Coating application.

3.5.2.1 Apply one coat of anticorrosive (AC) coating conforming to MIL-PRF-24647, at 5-6 mils DFT, to match existing color scheme.

3.5.2.2 While the new AC coat is still tacky, apply two coats of copper ablative antifouling (AF) paint, conforming to MIL-PRF-24647; apply one additional coat of AF paint over the boot-top area surfaces, at 5.0-6.0 mils DFT.

NOTE

Existing coating system on the U/W body surfaces may have a nominal thickness in excess of that which was originally installed, as a result of “patch-coats” applied during past drydock availabilities.

3.5 Draft mark painting. The Contractor shall paint all draft marks with one white (17925) coat of a “Polysiloxane” coating, at 2.0-3.0 mils DFT.

NOTES

1. Surfaces being preserved are considered “critical-coated surfaces”.

2. A “Tooke Paint Inspection Gage” may be used for inspection and thickness measurement (in accordance with ASTM D4138) of single or multiple coats on any substrate.

3. All authorized coating materials and suppliers, and coating colors are listed in COMDTINST M10360.3 Appendix C (Authorized Coatings for Use on Cutters and Boats) and Chapter 11 (Cutters and Boats Colors – Exterior and Interior), respectively.

3.5 In-process quality control measures. The Contractor shall abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces).

4.1 Definitions.

4.1.1 U/W body. The underwater body is defined as the areas from the bottom of the keel to the upper edge of the boot-topping, as shown on Coast Guard Drawing 64 ANB 0103-001, including transducer hull rings, sea chests, bilge keels, struts, rudders, skegs, gratings, and rope guards.

4.1.2 "Partial - Condition A”. The condition that exists where up to 33% of the U/W body hull substrate is exposed.

4.1.2 "Partial - Condition B". The condition that exists where the anticorrosive (AC) coating system is damaged, but the hull is not exposed.

WORK ITEM 7: Marine Chemist Services, Provide

1.1 Intent This work item describes the requirements for the Contractor to provide a marine chemist if services are necessary.

1.2 Government-furnished property

None

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 Provide Marine Chemist The Contractor shall provide marine chemist services in accordance with SFLC Standard Specification 0000 General Requirements paragraph 3.3.1.2.

WORK ITEM 8: Temporary Logistics, Provide

1.1 Intent This work item describes the requirements for the Contractor to provide temporary logistics.

1.2 Government-furnished property

None

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 8638 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Logistics

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 Temporary Services The Contractor shall provide temporary services for the vessel, for the duration of the Contract performance period at the Contractor's facility or the vessel's home pier as applicable.

3.2 Electrical power Electrical power. Provide flexible cable, necessary terminal connection, and 50 amp (30 amp T/V DUTY) electrical service to the vessel's shore power connection box in accordance with NFPA 70. Except for those cutters with an onboard shore power isolation transformer, only a single ungrounded shore power source shall be used for supplying electrical power, i.e. the generator or the transformer secondary supplying the shore tie must have all phases and any neutral insulated from earth with the frame of such equipment bonded to ground. Parallel transformers or generators shall not be used.

3.2.1 Any time the vessel is waterborne, the Contractor shall provide power.

4. NOTES

This section is not applicable to this work item.

Page 1 (Draft-0) image3.emf image4.emf image5.emf image6.emf image7.emf

CAUTIONCAUTION

LEAD DUST HAZARD

BOX CONTAINS LEAD INGOTS

If access is required, refer to the

LEAD SAFE WORK PRACTICES.