Signed_J&A_Redacted.pdf
PDF 2 MB Posted
- Attached to
- H60 SPARE PARTS
- Solicitation number
- HSCG38-17-Q-J00140
About this file
Justification and Approval
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1-Terms_and_Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
SIMPLIFIED ACQUISITION PROCEDURES (SAP)
SOLICITATIONS MAY BE LIMITED TO ONE SOURCE ONLY IF THE CONTRACTING OFFICER DETERMINES THAT ONLY ONE SOURCE IS REASONABLY AVAILABLE, THIS DETERMINATION MUST BE SUPPORTED WITH FULL JUSTIFICATION FOR SOLE SOURCE FROM THE CUSTOMER, WHEN THE CUSTOMER DESCRIBES AN ITEM WITH A PURCHASE DESCRIPTION WHICH LIMITS THE AVAILABILITY TO ONE SOURCE, THE JUSTIFICATION MUST EXPLAIN WHY THE ITEIU IS THE ONLY ONE THATWILL MEET THE GOVERNMENT'S REQUIREI/lENT.
STATEMENTS SUCH AS 'ONLY KNOWN SOURCE" OR "ONLY SOURCE WHICH CAN MEET THE REQUIRED DELIVERY DATE'ARE
INADEQUATE TO SUPPORT A SOLE SOURCE PURCHASE,
PURCHASE REOUEST OR REOUISITION NUMBER PROJECT/TASK NUMBER ESTIMATED AMOUNT (Over Micro-Purchase Threshold, but up to the SAI
IDENTIFICATION OF THE AGENCY AND THE CONTRACTING OFFICE, AND SPECIFIC IDENTIFICATION OF THE DOCUMENT AS A ,JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION.' PLEASE CITE THE AUTHORITY ANO TYPE OF JUSTIFICATION
Commanding Ofllcer, United States Coast Guard (USCG), Aviation Logistics Center (ALC), Medium Range Recovery (MRR) Procurement Branch, Elizabeth City, NC. Authority 6.302-1, Citations 10 U.S.C 230a(cX1); Only two responsible source and no other supplies or services will satisfy aqency requirements.
BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED, AND THE INTENDED USE.
This requirement is for the following items used on the MH-60T aircraft. These pars are required for replacement during routine maintenance because of failures/corrosion/damage.
Seven (7) each TAIL CONE FlTlNG, NSN 1560-01-HS1-0024, P/N 70209-25001-099
UNIQUE CHARACTERISTICS THAT LIMIT AVAILABILITY TO ONLY LIMITED SOURCES, WITH THE REASON NO OTHER
SUPPLIES OR SERVICES CAN BE USED-
Air lndustries l\4achine lnc (AlM) and Sikorsky Aircraft Corporation (SAC) are the Original Equipment Manufacturer (OEM) for these parts. They ensure product integrity for our aircraft specific application, and are the only known sources that hold all the proprietary data. During my market research using WEBFLIS, GSA Advantage, and/or open markel sources, there were no other approved sources identitied. All lechnical data available has been thoroughly researched to ascertain the existence of altemate part numbers;
none were discovered. The items specified by this requirement remain the only suitable parts known to ensure safe system operation and functionality of the aircrafi.
A DESCRIPTION OF EFFORTS MADE TO ENSURE THAT QUOTATIONS OR OFFERS ARE SOLICITED FROM AS MANY POTENTIAL SOURCES
AS PRACTICABLE (INCLUDE YOUR MARKET RESEARCH EFFORTS HERE).
During the l\,larket Research phase utilizing AMIIIS, FEDLOG, and GSA Advantage there were no additional sources identilled. A Solicitation will be posted on FEDBIZOPPS but acquisition method code (3) indicates acquire directly from the OEM.
REASON THAT SUGGESTED SOURCES ARE THE ONLY SOURCE WHICH CAN PROVIDE THE SUPPLIES OR SERVICES.
lvlarket research has not identified any alternative part number or supply sources. AIM and SAC are the OEMS for the item(s) listed, owns the proprietary rights, and the only known supply sources.
EXPLAIN WHY AN ADEOUATE PURCHASE OESCRIPTION OR OTHER INFORMATION SUITABLE TO SOLICIT BY FULL AND OPEN
COMPETITION HAS NOT BEEN DEVELOPED OR ARE NOT AVAILABLE.
Technical data packages, specificalions, and documentation necessary to enable full and open competilion were not procured by the
USCG,
PROVIDE A STATEii|ENT OF ACTIONS, lF ANY, THE GOVERNMENT MAY TAKE TO REMOVE OR OVERCOME ANY BARRIERS TO
COMPETITION BEFORE FUTURE ACQUISITIONS ARE REQUIRED,
The USCG does not have the required dala or drawings to overcome the limited sourc€ barrier to foster competition. lt would not be cost effective to acquire the data for open competition since AIM and SAC are the only approved sources and own all the proprietary rights.
CODE
ODE
December 20
File details come from the government source that posted it. Updated .