Attch_2_-_Schedule.xls
XLS spreadsheet 58 KB Posted
- Attached to
- Industrial Battery and Watering System Assembly
- Solicitation number
- HSCG38-15-Q-500038
About this file
Attachment 2 - Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch_4_-_Terms_and_Conditions.pdf | ||
| Attch_5_-_Pictures_and_drawing.pdf | ||
| Attch_1_-_Anticipated_Delivery_Schedule_.pdf | ||
| Attch_3_-_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Base Year: Date of Award + 12 Months | |||||
| CLIN | Description | Delivery Location | Unit Cost | Unit | |
| 0001 | Industrial Battery Assembly | ||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | ||
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | ||||
| 0002 | 40 Cell Battery Watering System - installed on battery assembly | ||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 0001** | Delivery Location | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | Unit |
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | ||||
| Option Year 1: Date of Exercise + 12 Months | |||||
| CLIN | Description | Delivery Location | Unit Cost | Unit | |
| 1001 | Industrial Battery Assembly | ||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | ||
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | ||||
| 1002 | |||||
| 1002 | 40 Cell Battery Watering System - installed on battery assembly | ||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 1001** | Delivery Location | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | Unit |
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | ||||
| Option Year 2: Date of Exercise + 12 Months | |||||
| CLIN | Description | Delivery Location | Unit Cost | Unit | |
| 2001 | Industrial Battery Assembly | ||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | ||
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | ||||
| 2002 | 40 Cell Battery Watering System - installed on battery assembly | ||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 2001** | Delivery Location | (QTY 1-5) | (QTY 6-10) | (QTY 10-21) | Unit |
| San Diego, CA |
Mckinleyville, CA Los Angeles, CA San Franciso, CA
| MCCellan AFB, CA | EA | |
| Houston, TX | EA | |
| Port Angeles, WA | EA | |
| North Bend, OR | EA | |
| Elizabeth City, NC | EA | |
| Atlantic City, NJ | EA | |
| Jacksonville, FL |
Savannah, GA
| Clearwater, FL | EA | |
| IAW HSAR 3052.247-72 Offers are invited on the basis of f.o.b. destination only. Offers submitted on any other basis will be rejected as nonresponsive. |
&C&"-,Bold"&14SCHEDULE HSCG38-15-Q-500038&R&14Attachment 2
Sheet2
| Estimated Quantities | |||||
| Item | Part Number | Base Year | Option Year 1 | Option Year 2 | Unit |
| DEKA Battery - IST 9059, 80 V 500AH | 40-D125-9 | 21 | 20 | 20 | EA |
| Flowrite Watering System for 40 Cell Battery | BK-1C0-201-540 | 21 | 20 | 20 | EA |
Sheet3
| Base Year: Date of Award + 12 Months | |||||||||||
| CLIN | Description | Deilvered to San Diego, CA | Deilvered to Mckinleyville, CA | Deilvered to Los Angeles, CA | Deilvered to San Franciso, CA | Deilvered to MCCellan AFB, CA | Deilvered to Houston, TX | Deilvered to Port Angeles, WA | Unit | ||
| EST QTY 3 | EST QTY 3 | EST QTY 3 | EST QTY 3 | EST QTY 3 | EST QTY 3 | EST QTY 3 | |||||
| 0001 | Industrial Battery Assembly | ||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | ||||||||||
| 0002 | 40 Cell Battery Watering System - installed on battery assembly | ||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 0001** | EA | ||||||||||
| Option Year 1: Date of Exercise + 12 Months | |||||||||||
| CLIN | Item | Deilvered to Elizabeth City, NC | Deilvered to Atlantic City, NJ | Deilvered to Jacksonville, FL | Deilvered to Savannah, GA | Qty Discount | |||||
| 6 - 10 | Qty Discount | ||||||||||
| 11 -16 | Unit | ||||||||||
| EST QTY 6 | EST QTY 7 | EST QTY 4 | EST QTY 3 | ||||||||
| 1001 | Industrial Battery Assembly | ||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | ||||||||||
| 1002 | 40 Cell Battery Watering System - installed on battery assembly | ||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 1001** | EA | ||||||||||
| Option Year 2: Date of Exercise + 12 Months | |||||||||||
| CLIN | Item | Deilvered to Clearwater, FL | Deilvered to North Bend, OR | Deilvered to Elizabeth City, NC | Qty Discount | ||||||
| 6 - 10 | Qty Discount | ||||||||||
| 11 -16 | Unit | ||||||||||
| EST QTY 2 | EST QTY 3 | EST QTY 15 | |||||||||
| 2001 | Industrial Battery Assembly | ||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | ||||||||||
| 2002 | 40 Cell Battery Watering System - installed on battery assembly | ||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 2001** | EA | ||||||||||
| If quoting F.O.B. Destination, offeror's may quote a different price for each of the 14 different locations. If quoting F.O.B. Origin, the offeror should include estimated shipping costs for each location. |
Sheet4
| Base Year: Date of Award + 12 Months | ||||||
| CLIN | Description | Delivery Location: | Unit | Qty Discount | ||
| 6 - 10 | Qty Discount |
11 -16
| Unit Cost: (QTY 1-5) | Unit Cost: (QTY 6-10) | Unit Cost: (QTY 10-21) | San Franciso, CA | MCCellan AFB, CA | Houston, TX | Port Angeles, WA | Elizabeth City, NC | Atlantic City, NJ | Jacksonville, FL | Savannah, GA | Clearwater, FL | North Bend, OR | ||||||
| 0001 | Industrial Battery Assembly | |||||||||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | |||||||||||||||||
| San Diego, CA | ||||||||||||||||||
| Mckinleyville, CA | ||||||||||||||||||
| Los Angeles, CA | ||||||||||||||||||
| San Franciso, CA | ||||||||||||||||||
| MCCellan AFB, CA | ||||||||||||||||||
| Houston, TX | ||||||||||||||||||
| Port Angeles, WA | ||||||||||||||||||
| Elizabeth City, NC | ||||||||||||||||||
| Atlantic City, NJ | ||||||||||||||||||
| Jacksonville, FL | ||||||||||||||||||
| Savannah, GA | ||||||||||||||||||
| Clearwater, FL | ||||||||||||||||||
| North Bend, OR | ||||||||||||||||||
| 0002 | 40 Cell Battery Watering System - installed on battery assembly | |||||||||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 0001** | EA | |||||||||||||||||
| Option Year 1: Date of Exercise + 12 Months | ||||||||||||||||||
| CLIN | Description | Delivery Location: | Unit | Qty Discount | ||||||||||||||
| 6 - 10 | Qty Discount |
11 -16
| San Diego, CA | Mckinleyville, CA | Los Angeles, CA | San Franciso, CA | MCCellan AFB, CA | Houston, TX | Port Angeles, WA | Elizabeth City, NC | Atlantic City, NJ | Jacksonville, FL | Savannah, GA | Clearwater, FL | North Bend, OR | ||||||
| 1001 | Industrial Battery Assembly | |||||||||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | |||||||||||||||||
| 1002 | 40 Cell Battery Watering System - installed on battery assembly | |||||||||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 1001** | EA | |||||||||||||||||
| Option Year 2: Date of Exercise + 12 Months | ||||||||||||||||||
| CLIN | Description | Delivery Location: | Unit | Qty Discount | ||||||||||||||
| 6 - 10 | Qty Discount |
11 -16
| San Diego, CA | Mckinleyville, CA | Los Angeles, CA | San Franciso, CA | MCCellan AFB, CA | Houston, TX | Port Angeles, WA | Elizabeth City, NC | Atlantic City, NJ | Jacksonville, FL | Savannah, GA | Clearwater, FL | North Bend, OR | |||
| 2001 | Industrial Battery Assembly | ||||||||||||||
| ** Note: Unit cost includes all shipping, spent battery disposal and trade allowance for spent battery** | EA | ||||||||||||||
| 2002 | 40 Cell Battery Watering System - installed on battery assembly | ||||||||||||||
| **Note: Must be compatible with the proposed Industrial Battery Assembly in CLIN 2001** | EA | ||||||||||||||
| If quoting F.O.B. Destination, offeror's may quote a different price for each of the 14 different locations. If quoting F.O.B. Origin, the offeror should include estimated shipping costs for each location. |
File details come from the government source that posted it. Updated .