SOW_alarm_system_on_YBI.docx
DOCX document 22 KB Posted
- Attached to
- INSTALATION OF ALARM SYSTEM
- Solicitation number
- HSCG31-16-P-PAB013
About this file
Statement of Work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_PAB013_02.doc | DOC document | |
| SF-30_Amendment_PAB013.doc | DOC document | |
| RFQ_1449_PAB013.pdf | ||
| FAR_52_212_and_HSAM_Clauses_for_SERVICES_FAC_2005-87.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Security alarms for Representational Facility
COAST GUARD HOUSING
Quarters “A”, “C” 1 Hillcrest RD Yerba Buena Island, CA
Background:
The intruder alarm systems currently in use at the senior officer quarters located on Yerba Buena Island is a 2G operating system which has been deemed antiquated and will no longer be supported by AT&T. As a result a new system is required that possesses current 3G technology.
1. Scope:
The contractor shall provide all labor, materials, equipment and supervision necessary to remove existing 2G system and replace it with an in kind system that has 3G technology at the following homes:
REP FAC quarters “A” and “C” located at 1 Hillcrest RD, Yerba Buena Island (YBI), San Francisco, CA 94130
2. Contractor Personnel Security Requirements
All contractor personnel must possess valid identification, all contractor vehicles must have valid registration and insurance, and all drivers must possess a valid driver’s license.
3. Technical Point Of Contact Designation
The POC’s for this task are DCC Andrew Turko, who can be reached at 415-382-4240 or Andrew.m.turko@uscg.mil or Mr. Randy Saville whom can be reached at 415-382-4251 or randy.J.saville@uscg.mil .
4. Description of Work
4.1. Contractor shall provide all labor and material for the removal of existing 2G alarm system and install a new in kind system that has 3G capabilities and the minimum following items for each home and monitoring for the two Representational Facilities. All items listed are approximate numbers per home.
4.2. Security System Requirements:
The following list is an approximation of what will be required and intended to provide a base the estimated equipment required for each home.
1. A Main central controller with a 4 alarm panel.
2. LCD keypads.
3. 15W siren indoor.
4. Transformer 16.5 VAC, back up battery 8 amp.
5. A new CDMA alarm module with 3G or better connection to a 24hr monitoring center.
6. Install new wireless contacts to include approx. 45 wireless sensors for doors and windows.
7. Installing new PIR motion detectors approx (8).
8. Installing glass break detectors approx (8).
9. Installing heat/smoke detectors approx. (9).
10. Replace all panic buttons approx. (3).
11. Replace all remote key fobs approx. (2).
12. Homeowners/users guide. (2)
13. Smartphone activation and monitoring software
Labor includes removal of existing contacts, re-programming sensors to the panel and testing all sensors with the central station after installation is complete. All damages incurred to government and personal property by the contractor shall be at corrected at the contractor’s expense.
5. Site Visit
Site Visits are HIGHLY ENCOURAGED prior to submitting a quote and visits can be arranged by contacting: CWO Kevin Merideth
(510) 437-3961 x4351 to schedule a site visit.
6. Coast Guard Furnished Information
Quarters “A”, “C” 1 Hillcrest RD Yerba Buena Island, CA
7. Working Hours
Contractor shall perform work between the hours of 0800 to 1600 M-F. Any exceptions must be approved by the Contracting Officer.
Contractor shall commence work within SEVEN (7) calendar days after contract award and all work must be completed within FOURTEEN (14) calendar days after contract award .
8. Coast Guard Furnished Material
Electrical and water will be provided.
9. Coast Guard Furnished Equipment
None
10. Travel Requirements
All costs associated with travel to complete this task are included within the contractor’s proposal.
11. Transportation of Equipment/Material
All costs associated are included within the contractor’s proposal.
12. Data Deliverables
N/A
13. Acceptance Plan
Completion of work under this contract will be monitored and accepted by Coast Guard Technical POC’s, DCC Andrew Turko or Mr. Randy Saville.