Biscayne_Channel_Light_Specs.pdf

PDF 3 MB Posted

Attached to
Demolition/Removal of Biscayne Channel Light
Solicitation number
HSCG28-14-Q-PMW077
Issued by

About this file

Specs/SOW for Biscayne Channel Light

View the file

Other files

File Type Posted
SF_30_Biscayne.pdf PDF
DOL_2007-0134.pdf PDF
SF1449_Biscayne_Channel_Light.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

DEMOLISH BISCAYNE CHANNEL LIGHT

BISCAYNE BAY (MIAMI), FL

PROJECT NO. 5845386

APRIL 2014

USCG SECTOR MIAMI: PROJECT # 5845386

DEMOLISH BISCAYNE CHANNEL LT

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 57 20 ENVIRONMENTAL PROTECTION

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND REMOVAL

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 10 35 DIVING

APPENDICES

A SITE MAP AND CHARTS

B SUBMITTAL REGISTER

C STANDARD CONDITIONS

D DIVE SURVEY AND LEAD REPORT

-- End of Project Table of Contents --

SECTION 01 11 00

SUMMARY OF WORK

PART 1 - GENERAL

1.1 PROJECT DESCRIPTION

The contractor shall provide all labor, materials, supervision, and insurance to demolish above the mudline, provide selected components, and dispose/recycle the remaining material from the former Biscayne Channel Light Aid-to-Navigation structure (LLNR 10805) located in the water position 25-38-20.373N, 080-07-52.645W, Biscayne Bay, Florida.

1.2 DRAWINGS ACCOMPANYING SPECIFICATIONS

No drawings accompany these specifications. Photographs are provided in the appendices and any bidder is strongly encouraged to inspect the vicinity of the structure.

1.3 SUBMITTALS

Government approval is required for all submittals identified in the specifications, as listed on the submittal register. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Submittals

Progress and completion pictures, (daily)

Endorsed record of meeting with USCG Sector Miami

SD-02 Shop Drawings

Post-Demolition underwater survey documentation

1.4 PROJECT PERFORMANCE TIME

The total contract performance period shall be 45 calendar days, which includes the time needed to approve all submittals.

1.5 INSPECTION PRIOR TO BID

Information provided in the specification and drawings are approximations only. The offeror is encouraged to visit the site, field verify all dimensions and existing conditions, and take such steps as may be reasonably necessary to ascertain the nature and exact location of the work. Prior to visiting the site the Contractor shall notify Sector Miami Aids to Navigation Officer, CWO4 Mark Sheaffer at (305) 535-8720 or via e-mail at Mark.G.Sheaffer@uscg.mil. Alternate contact is BMC Jennifer Zercher at (305) 535-4311 or via e-mail at Jennifer.N.Zercher@uscg.mil.:

The site is located in the water in Biscayne National Park, east of Miami, FL. See Appendix A for chart. The location is not accessible by land, and all prospective bidders are required to provide their own transportation to the site.

SECTION 01 11 00 – Page 1 of 5

1.6 DEMOLITION

LOCATION/BACKGROUND – The Biscayne Channel Light is an offshore automated minor aid to navigation constructed in 1929. It is located inside the boundaries of Biscayne National Park, approximately 2.4 miles southeast of Key Biscayne in Dade County, Florida. This property is a metal pyramidal tripod skeleton tower approximately 55 feet tall that supports a beacon.

Known locally by the nickname “Bug Light,” it stands alone surrounded by water approximately 18 feet deep. The Biscayne Channel Light is owned by the U.S. Coast Guard and is identified as number 10805 on the regional Light List. This property includes an original iron pipe straight pile foundation that supports three original structural series consisting of iron columns, horizontal struts, coupling sockets, and tension rods with turnbuckles. It is topped with a non-original welded steel light series.

The tower’s foundation and first series are oriented vertically. The three series above this are inclined inward at a 70 degree angle from horizontal.

The light series supports a non-original signal light and dayboard markers.

Non-original steel ladders attached to the structure’s southern side lead to the top of the tower. The Biscayne Channel Light is deteriorated, non-operating, and leans westward approximately 15 to 20 degrees from vertical.

It is not safely climbable and is no longer needed for safe navigation.

The Coast Guard has identified this property for demolition.

REQUIREMENTS – The work consists of, but is not limited to, the following:

a) Meet, in person, with USCG Sector Miami ATON POC (see 1.5), or designee to identify the correct structure to remove. A report from this meeting must be endorsed by the POC (or designee) and received by the project manager before demolition commences.

b) Contact the below POC from the NPS. Coordinate with Biscayne

National Park POC to identify three (03) different series of turnbuckles on the structure and one specimen from each series to be removed and delivered. Cut the tension rods outside the turnbuckles or otherwise remove the turnbuckles as directed.

Provide the turnbuckle specimens to the NPS POC:

Charles Lawson

Biscayne National Park 786-335-3676 charles_lawson@nps.gov

c) Just prior to demolition, retrieve the battery, lighting hardware, and all electronic equipment from the aid and deliver to USCG Sector Miami 100 MacArthur Causeway, Miami Beach, FL, 33139. Ensure that any hazards to navigation remain lighted during demolition.

d) Demolish the tower and dispose/recycle remaining material above one foot of the mudline.

e) Cut the structure’s three support piles approximately, but no more than, one foot above the mud line. Remove all material above that point. DO NOT DEMOLISH OR REMOVE THE PORTIONS OF THE STRUCTURE THAT ARE WITHIN 1 FOOT OF OR BELOW THE MUD LINE. These sections and foundations will be left in place to mark the

SECTION 01 11 00 – Page 2 of 5 mailto:charles_lawson@nps.gov position of the structure for historical purposes. Provide underwater photographs of final site conditions.

f) Survey the area within a 20’ radius of all three structure legs and remove any debris caused by demolition. Provide a post-dive survey report.

1.7 PROGRESS AND COMPLETION PICTURES

Photographically document construction operations daily. Provide photographs to the government. Final submittal shall be underwater photographs showing the remaining foundation legs after demolition and post-dive survey report.

1.8 COORDINATION

The Contractor shall closely coordinate all work with the USCG and Biscayne National Park, to a minimum, reduce disturbances to operations and commercial navigation.

1.9 TRANSPORTATION OF GOVERNMENT INSPECTORS

Not required.

1.10 AVAILABILITY OF UTILITY SERVICES

No utilities are available at the site. The Contractor shall be responsible for providing any and all required utilities (electricity, potable water, etc.). The Contractor shall provide temporary toilet facilities for his personnel.

1.11 CONTRACTOR PERSONNEL REQUIREMENTS

1.11.1 Identification

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or other government issued identification. The identification must be laminated, and show a facial picture of the individual.

1.12 SUPERVISION

Have at least one full time superintendent with authority to make changes to the contract, and capable of reading, writing, and conversing fluently in the English language on the job site during working hours.

1.13 STORM PRECAUTIONS

The area in which the work is being performed is exposed to heavy weather action at times. As such, the area can be subject to wave action, strong currents, and wind. Should warnings of winds of gale force or stronger, or applicable watercraft advisories, be issued, the Contractor shall take every practicable precaution to minimize danger to personnel and government property.

1.14 SIGNAGE LIGHTS

SECTION 01 11 00 – Page 3 of 5

The Contractor’s marine equipment shall display such lights and day signals as may be required under the COMDTINST M16672.2(series) Navigation Rules, International and Inland. The Contractor may inquire at the nearest U.S. Coast Guard Sector Prevention Office for specific information on these rules. The Contractor must provide obstruction lighting on any obstruction, including the tower while under construction that is created by the Contractor.

1.15 MISPLACED MATERIAL

Should the Contractor, during the progress of the work, lose, dump, throw over-board, sink, or misplace any material, plant, machinery, or appliance which in the opinion of the COR may be dangerous to the environment or obstruct navigation, the Contractor shall recover and remove the same with the utmost dispatch. The Contractor shall give immediate notice, with description and location of such obstructions, to the COR, and when required shall mark or buoy such obstructions until the same are removed.

Should he refuse, neglect, or delay compliance with the above requirements, such obstruction may be removed by the Government, and the cost of such removal may be deducted from any money due or to become due the Contractor or may be recovered under his bond. The liability of the Contractor for the removal of a vessel wrecked or sunk without fault or negligence shall be limited to that provided in Section 15, 19 and 20 of the River and Harbor Act of 3 March 1899 (33 U.S.C. 410 et seq.).

1.16 CLEANUP

The Contractor shall keep the work area free from accumulations of waste materials on a daily basis and comply with all Federal, State and local regulations pertaining to the storage, transport and disposal of wastes.

The work is located on jetties and the Contractor shall provide adequate waste disposal facilities including garbage cans, trash piles or dumpsters. Waste disposal containers shall be secured and covered to prevent debris from blowing out, and debris shall not be allowed to enter the water surrounding the site.

1.17 RECORD DRAWINGS

No drawings are required for this contract.

1.18 FINAL INSPECTION AND ACCEPTANCE

Acceptance will be based upon acceptance of the submittals upon demolition completion.

1.19 WARRANTIES

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

1.20 ENVIRONMENTAL PRECAUTIONS

Contractor shall abide by all applicable Best Management Practices, Section 01 57 20.00 10, and conditions listed in Appendix C.

SECTION 01 11 00 – Page 4 of 5

SECTION 01 11 00 – Page 5 of 5

- - End of Section - -

SECTION 01 32 01

PROJECT SCHEDULE

1.1 GENERAL DESCRIPTION

Prepare a horizontal bar graph progress schedule using a time scale. The project should be divided and subdivided into a sufficient number of work activities that can accurately graphically display the work sequence, activity duration, interplay of activities, and dollar value of each activity.

1.2 RESPONSIBILITY

The Contractor is responsible for executing the work within the time stated in the contract.

Government approval is required for the following. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Submittals

Final Progress Schedule, Updated Project Schedule.

PART 2 - PRODUCTS

2.1 PROGRESS SCHEDULE

Progress schedule shall have project name, location, contract number, and company name. The final progress schedule, with the NPT and completion dates filled in, shall be signed.

2.1.1 At the left side of the form, list in columns.

a. Activity Number and Description - At a minimum, break down the project into 10 activities. If enough detail is given on the progress schedule, then the activity breakdown may be done at the COR's discretion. Activities can be of various origins (i.e. by specification section, by logical sequence of work, by breakdown used for bid estimates, etc.)

b. Specification Section Reference - This is optional. Use only if the breakdown of activities directly correlates with the specification sections.

c. The Activities Percentage (i.e. 50%) or Weight (i.e. .5) of the entire contract based on Dollar Value - The cumulative percentage should add up to 100 percent.

d. Estimated Value of the Activity - Profit and overhead should be distributed throughout activities or listed as a separate line item

SECTION 01 32 01 – Page 1 of 3 and distributed over the entire length of the project. The total values should add to the contract amount.

2.1.2 Establish the time schedule across the top of the sheet for the entire project duration. Divide the project into months, weeks, or days depending on the length of the project and an appropriate time scale.

2.1.3 Lay out a bar graph opposite each activity, corresponding to the schedule start date and extended for the scheduled duration of the activity. Indicate the percentage of the activity, which you intend to complete each week above or below each bar.

PART 3 - EXECUTION

3.1 UPDATING SCHEDULE

Update and submit progress schedule every month with progress payment showing actual progress. Updated progress schedules shall include the original information and an updated actual progress curve using a broken line.

3.2 DELAYS

If the Contractor knows or has reason to believe that the delivery of any material or equipment, the shortages of qualified labor, delays caused by others, or the occurrence of any other difficulty may cause delay in executing the work as scheduled, he shall notify the COR, in writing, within 3 calendar days.

3.3 SAMPLE

A sample progress chart is shown on the following page. This should only be used as a guide. It displays the "type" of information, which should be included in the submitted progress schedules.

SECTION 01 32 01 – Page 2 of 3

SECTION 01 32 01 – Page 3 of 3

SECTION 01 33 00

PART 1 GENERAL

1.1 SUBMITTALS REQUIRED

Items to be submitted shall be done electronically as specified in each applicable section of this specification. Submittals shall be approved before procurement, fabrication, or delivery of items to the job site.

Partial submittals will not be accepted and will be returned without review.

Submittals shall include the manufacturer's name, trade name, catalog model or number, nameplate data, size, layout dimensions, capacity, project specification and paragraph reference, applicable Federal, Military, industry and technical society publication references, and other information necessary to establish contract compliance of each item the Contractor proposes to furnish. The contractor shall indicate in the submittal which item(s) they are submitting.

1.2 TIMING OF SUBMITTALS

1.2.1 Timing and Sequence

Submit submittals in sufficient time and in such sequence to avoid delays in the work. Except for voluminous submittals, numerous submittals submitted on or about the same time, and submittals for very complex items, submittals will be reviewed by the Contracting Officer’s Representative (COR) and returned to the Contractor electronically within 10 working days after receipt. Large submittals shall be submitted electronically via CD to prevent overloading government servers. Contractor shall begin shop drawing submittal process after project is awarded.

1.2.2 Long Lead Time Items

Submit a list of long lead items within 5 calendar days of Award. This list shall identify items such as, but not limited to materials, fabrication and delivery of items to the job site. The Contractor shall prepare submittals and submit those items in sufficient time to avoid delays. Special attention shall be given to the long lead items to avoid delays in the work.

1.2.3 Shop Drawing Submittal Process

Contractor shall begin shop drawing submittal process after project is awarded. Special attention shall be given to long lead items to avoid delays in the work.

1.3 SCHEDULE OF SUBMITTAL DESCRIPTIONS (SD)

Contractor shall review individual sections for special submittal requirements and applicable publications relating to submittals. All submittals shall in electronic form with one with submittal coversheet. The submittal type and numbers of each required, are as follows:

SD-01 Preconstruction Submittals (1 electronic copy)

SECTION 01 33 00 Page 1

Submit information required before the physical start of work. These may include progress schedule, personnel list for security access, demolition and other required work plans.

SD-02 Shop Drawings (1 electronic copy)

Shop drawings shall show types, sizes, accessories, elevations, floor plans, sectional views, installation details, elementary diagrams, wiring diagrams, details of equipment and equipment spaces identifying and indicating proposed location, layout and arrangement of items of equipment, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and shall indicate the internal wiring for each item of equipment and the interconnection between the items. Drawings shall also indicate adequate clearance for operation, maintenance and replacement of operating equipment devices. If any equipment is disapproved, the drawings shall be revised to show acceptable equipment and be resubmitted. Shop Drawings shall be a minimum of 8.5 inches by 11 inches in size, except as specified otherwise, using a 1/4" = 1'-0" scale size for ductwork and piping layout outside mechanical rooms, and a 1/2" = 1'-0" scale size for cross section views of each mechanical room.

SD-03 Product Data (1 electronic copy)

Submittals for each manufactured item shall be manufacturer's descriptive literature of cataloged products, equipment drawings, diagrams, performance and characteristic curves and catalog cuts. Submit complete descriptive data for each type of material. Clearly mark data to indicate the type the Contractor intends to provide. If not marked to indicate what contractor intends to provide the submittal will be returned disapproved.

SD-04 Samples (2 each, 1 hardcopy to COR/CM and the other should be on site for the CG inspector and unit to choose from if applicable)

Submit color (not black and white) printed data or actual pieces of the items. The contract prices will not be adjusted due to the Contracting Officer's Representatives selection of any color, texture, or pattern submitted.

SD-05 Design Data (1 electronic copy)

Submit calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports (1 electronic copy)

Submit reports of inspection and laboratory test, including analysis and interpretation of test results. Each report shall be properly identified.

Test methods used and compliance with recognized test standards shall be described.

Test Reports: A report signed by an authorized official of an independent testing laboratory that a material, product, or system identical to the material, product or system to be provided has been tested in accordance with requirements specified by naming the test method and material. The

SECTION 01 33 00 Page 2 test report must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test. Testing must have been within three years of the date of award of this Contract.

Factory Test Reports: A written report which includes the findings of a test required to be performed by the manufacturer on a prototype or on an actual portion of the work prepared for this project, before it is shipped to the job site. The report must be signed by an authorized official of the manufacturer's test facility or testing laboratory and must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test.

Field Test Reports: A written report which includes the findings of a test made at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation.

The report must be signed by an authorized official of a testing laboratory or agency and must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test.

SD-07 Certificates (1 electronic copy)

Submit certification from the manufacturer attesting that materials and equipment to be furnished for this project conform with the requirements of this specification and of the referenced publications. Pre-printed certifications will not be acceptable; certifications shall be in the original. The certification shall not contain statements that could be interpreted to imply that the product does not meet all requirements specified, such as "as good as"; "achieve the same end use and results as materials formulated in accordance with the referenced publications"; "equal or exceed the service and performance of the specified materials". The certification shall simply state that the product conforms to the requirements specified.

When materials or equipment must conform to the standards of organizations such as the American National Standards Institute (ANSI), American Society for Testing and Materials (ASTM), National Electrical Manufacturers Association (NEMA), and Underwriters Laboratories (UL), proof of such conformance shall be submitted to the Contracting Officer’ Representative for approval. If an organization uses a label or listing to indicate compliance with a particular standard, the label or listing, the Contractor shall submit a certificate from an independent testing organization, which is competent to perform acceptable tests and is approved by the Contracting Officer’s Representative. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item conforms to the specified organization's standard. For materials and equipment whose compliance with organizational standards or specifications is not regulated by an organization using its own listing or label as proof of compliance, a certificate of compliance from the manufacturer shall be submitted for approval. The certificate shall identify the manufacturer, the product, and the referenced standard and shall simply state that the manufacturer certifies that the product conforms to all requirements of the project specification and of the referenced standards listed.

SECTION 01 33 00 Page 3

SD-08 Manufacturer’s Instructions

Submit reprinted material describing installation of a product, system, or material, including special notices and Material Safety Data Sheets, if any, concerning impedances, hazards, and safety precautions.

Where installation procedures, or any part hereof, are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Contracting Officer‘s Representative prior to installation.

Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for reject of the material.

SD-10 Operation and Maintenance Manuals (Submit 1 hardcopy for review by the government to ensure completeness and then when approved by the COR submit 3 each)

Furnish an operation and maintenance manual section for each item of equipment. Furnish three copies of the complete manual bound in hardback binders. Furnish one complete manual prior to the time that equipment tests are performed, and furnish the remaining manuals before the contract is completed. Inscribe the following identification on the cover: the words "OPERATION AND MAINTENANCE MANUAL", the name and location of the equipment, the name of the contractor, and the contract number. The manual shall include the names, addresses, and telephone numbers of each subcontractor installing equipment, and of the local representatives for each item of equipment. The manual shall have a table of contents and be assembled to conform to the table of contents with the tab sheets placed before instructions covering the subject. The instructions shall be legible and easily read, with large sheets of drawings folded in. the manual shall include: a complete description of the system, wiring and control diagrams with data to explain detailed operation and shut-down instructions;

installation instructions; maintenance instructions; lubrication schedule including type, grade, temperature range, and frequency; safety precautions, diagrams, and illustrations; test procedures; performance data; and parts list. The parts lists for equipment shall indicate the sources of supply, recommended spare parts, and the service organization which is reasonably convenient to the project site. The manual shall be complete in all respects for equipment, controls, accessories, and associated appurtenances provided. Submit an electronic copy of Operation and Maintenance Manuals with all documents scanned to PDF format on a CD-ROM disk.

Furnish manufacturer's operating instructions for the principal item of mechanical and electrical components, for use by operating personnel. A copy shall be provided in each of the three operations manuals. The fourth copy shall be laminated between thermoplastic sheets and affixed where directed by COR adjacent to each item of equipment. Operating instructions shall not fade when exposed to sunlight and shall be secured to prevent easy removal or peeling. The operating instructions shall include wiring diagrams, control diagrams, and control sequences for each principal item of equipment. The instructions shall describe the functions of the equipment, its most economical operation, start-up and shut-down procedures, procedures to follow in the event of failure, normal maintenance practices, and caution and warning notices.

SECTION 01 33 00 Page 4

SECTION 01 33 00 Page 5

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section 01 33 00 --

SECTION 01 57 20.00 10

ENVIRONMENTAL PROTECTION

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety and Health Requirements

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous

Waste

40 CFR 279 Standards for the Management of Used Oil

40 CFR 302 Designation, Reportable Quantities, and

Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 68 Chemical Accident Prevention Provisions

49 CFR 171 - 178 Hazardous Materials Regulations

1.2 GENERAL REQUIREMENTS

The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract.

The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.

1.3 SUBCONTRACTORS

The Contractor shall ensure compliance with this section by Sub-contractors.

1.4 PAYMENT

The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and

1.5 SUBMITTALS

SECTION 01 57 20.00 10 - Page 1 of 3

Government approval is required for the following submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Environmental Protection Plan.

1.6 ENVIRONMENTAL PROTECTION PLAN

Prior to commencing construction activities or delivery of materials to the site, the Contractor shall submit an Environmental Protection Plan for review and approval by the COR. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction.

1.6.1 Contents

The Environmental Protection Plan shall include, but shall not be limited to, the following:

a. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.

b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.

c. The Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. This plan shall include as a minimum:

d. A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal. The Contractor shall identify any Sub-contractors responsible for the transportation and disposal of solid waste. Licenses or permits shall be submitted for solid waste disposal sites that are not a commercial operating facility. Evidence of the disposal facility's acceptance of the solid waste shall be attached to this plan during the construction.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION

3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS

This paragraph supplements the Contractor's responsibility under the contract clause "PERMITS AND RESPONSIBILITIES" to the extent that the Government has obtained the required permits. The Contractor shall comply with the terms and conditions of all required permits.

3.2 WATER RESOURCES

The Contractor shall take necessary precautions to prevent waste, debris and construction materials from entering the water.

SECTION 01 57 20.00 10 – Page 2 of 3

SECTION 01 57 20.00 10 – Page 3 of 3

3.3 AIR RESOURCES

Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.

3.3.1 Burning

Burning shall be prohibited.

3.4 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL

Disposal of wastes shall be as directed below, unless otherwise specified in other sections and/or shown on the drawings.

3.4.1 Solid Wastes

Solid wastes (excluding clearing debris) shall be placed in containers which are emptied on a regular schedule. Handling, storage, and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal.

3.4.2 Chemicals and Chemical Wastes

Chemicals shall be dispensed ensuring no spillage to the ground or water.

3.4.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials

Hazardous wastes are defined in 40 CFR 261, or as defined by applicable State and local regulations. Hazardous materials are defined in 49 CFR 171 - 178.

The Contractor shall, at a minimum, manage and store hazardous waste in compliance with 40 CFR 262. The Contractor shall take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing.

3.4.4 Fuel and Lubricants

Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation. Fuel, lubricants and oil shall be managed and stored in accordance with all Federal, State, Regional, and local laws and regulations.

Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. Storage of fuel on the project site shall be accordance with all Federal, State, and local laws and

SECTION 02 41 00

DEMOLITION AND REMOVAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008) Safety and Health Requirements

1.2 GENERAL

All materials shall be removed and recycled or disposed of by the Contractor in accordance with the good practice of the several trades involved.

Notify the COR for authorization to commence demolition. Contain all rubbish and demolition debris and prevent waste from entering the water.

Transport to selected disposal facility as soon as possible. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

Government approval is required for submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:.

SD-07 Certificates

Demolition plan

1.4 REGULATORY AND SAFETY REQUIREMENTS

Comply with Federal, State, and local hauling and disposal regulations.

1.5 DUST AND DEBRIS CONTROL

Prevent the spread of debris and avoid the creation of a nuisance or hazard in the surrounding area. Control shall meet the requirements of Division 1 specifications.

1.6 PROTECTION

Before, during and after the demolition work the Contractor shall continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the demolition site.

1.7 BURNING

SECTION 02 41 00 Page 1 of 3

SECTION 02 41 00 Page 2 of 3

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.8 DEMOLITION PLAN

The Demolition plan shall include procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, disposal facility, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.

Provide procedures for safe conduct of the work in accordance with EM 385-1- 1.

1.9 ENVIRONMENTAL PROTECTION

Comply with the Environmental Protection Agency requirements specified.

1.10 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.11 DISPOSAL OF MATERIALS

Materials unless stated otherwise shall be disposed of off of government property. The Government will not be responsible for the condition or loss of, or damage to such property after notice is given. Materials and equipment shall not be reviewed by prospective purchasers or sold on site.

1.12 LOCATION

See Spec Section 01 11 00.

1.13 RESPONSIBILITIES

1.13.1 The Contractor is responsible for the work from the time removal begins to final completion and acceptance by the COR.

1.13.2 The Contractor shall supply equipment suitable for the transportation of the structure to be demolished.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 EXISTING FACILITES TO BE REMOVED

3.1.1 Structure

See Spec Section 01 11 00.

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Except for salvaged items specified in related sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property.

3.1.3 Structural Steel

Recycle structural steel, angles, plates, and shapes. Transport structural steel shapes to a designated recycling facility.

3.1.4 Miscellaneous Metal

Scrap metal shall become the Contractor's property. Recycle scrap metal as part of demolition operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility.

3.1.5 Items with Unique/Regulated Disposal Requirements

Remove and dispose of items with unique or regulated disposal requirements in the manner dictated by law or in the most environmentally responsible manner.

3.3 DISPOSAL OF REMOVED MATERIALS

3.3.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other non-salvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified off site. Removed materials shall not be stored on the project site.

SECTION 02 41 00 - Page 3 of 3

SECTION 35 10 35 - Page 1

SECTION 35 10 35

DIVING

1.1 GENERAL DESCRIPTION: All diving is to be conducted in accordance with CFR 29 Sub Part T-9 and CFR 46 Part 197.

1.2 REQUIREMENTS: The Contractor shall submit to the COR for review the documentation showing that all personnel associated with and/or performing the diving activities required for this project have sufficient experience in performing the following tasks on similar platforms or structures.

1.2.1 Qualifications: Contractor shall submit the following documentation as a minimum:

a. Certification and resumes of key personnel and divers.

1.3 SCOPE OF WORK: The contractor shall demolished the structure as described in section 01 11 00. Portions of the structure to be demolished are underwater. The contractor may be required to use divers in the execution of this contract for installation, demolition, or salvage activities. Additionally, the contractor shall survey within a 20ft radius of structure and remove debris from demolition. All dive operations shall be in accordance with this section, CFR 29 Sub Part T-9 and CFR 46 Part 197.

1.4 SUBMITTALS:

Diving Qualifications

Dive Plan

Post Dive Report

1.4.1 Qualifications, Diving Plan & Report: The diving plan showing the diving equipment to be used, the sequence of dives, personnel required and proposed activities shall be submitted with the Installation Plan. A dive report shall be submitted on completion of the salvage documenting the debris removed and that the area surrounding the site to a radius of 20 ft is clean and debris free.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

-- End of Section --

APPENDIX A – SITE INFORMATION

▲ Biscayne Channel Light North

Figure 1. Location Map. This is a portion of Nautical Chart Number 11465, Florida, Intracoastal Waterway, Miami to Elliott Key, 34th Edition (U.S.

National Oceanic and Atmospheric Administration 1999). NOTE: This property’s offshore location is beyond the limits of the U.S. Geological Survey Key Biscayne, Fla. 7.5’ topographic quadrangle, as well as other USGS maps of the icinity. v

Figure 2. Biscayne Channel Light, looking southeast. The tower’s leaning is apparent from the lowest horizontal strut’s relationship to the horizon and the different lengths of the foundation column segments above the water line Photo credit: Daniel Koski-Karell). (

Figure 3. Biscayne Channel Light, looking southeast

Figure 4. Biscayne Channel Light, looking north. The tower’s leaning is apparent from the lowest horizontal strut’s relationship to the horizon and the different lengths of the foundation column segments above the water line (Photo credit: National Park Service).

Figure 5. Biscayne Channel Light, elevation sketch (not to scale) (Credit:

Charles Lawson, Biscayne National Park).

Figure 6. First series tension rod turnbuckle near the base of the tower’s second series (1 ea. to be removed and provided). This turnbuckle is round at both ends. The first series tension rods and turnbuckles are the largest ones of the structure (Photo credit: National Park Service).

Figure 7. Second series of turnbuckle, 1 ea. to be removed and provided.

The second series tension rod turnbuckles have square heads (Photo credit:

National Park Service).

Figure 8. The third series tension rod turnbuckles (1 ea. to be provided) have hexagonal heads (Photo credit: Daniel Koski-Karell).

SUB- SPECIFICATION APPROVAL MATERIALS SUBMIT

MITTAL PARAGRAPH DESCRIPTION OF NEEDED NEEDED TO

No. No. ITEM SUBMITTED SUBMIT BY BY CODE DATE ENGINE DATE REMARKS

01 11 00 General

1 1.7 Progress and Completion Photos

2 1.6 Endorsed record of meeting with USCG Sector Miami

3 1.6 Provide light, battery and electronic equipment to USCG (MATERIALS)

4 1.6 Provide turnbuckles to Biscayne National Park POC (MATERIALS)

5 1.6 Post-Demolition Underwater Survey Documentation

01 32 01 Project Schedule

6 1.3.1 Progress Schedule

7 1.3.1 Updated Progress Schedule (if necessary)

01 57 20.00 Environmental Protection

8 1.5 Environmental Protection Plan

02 41 00 Demolition and Removal

9 1.3 Demolition Plan

35 10 35 Diving

10 1.4.1 Diving Qualifications

11 1.4.1 Dive Plan

12 1.4.1 Post Dive Survey

OWNER: US DEPT OF HOMELAND SECURITY / US COAST GUARD

ENGINEER: US COAST GUARD SECTOR MIAMI

CONTRACTOR:

SUBMITTAL REGISTER

CONTRACTOR CONTRACTOR ENGINEER

ADDRESS: JOB NUMBER:

Demolish Biscayne Channel Light

PNUM 5845836

CONTRACT NUMBER:

SCHEDULE DATES ACTION ACTION

CODE

Notes:

RS - Resubmittal FC - Furnish as Corrected NR - Not Required

C - Contractor A - Approved

TBS - To be Selected

A/C - Approved with Comments S - Supplier

D - Disapproved CS - Color Selected

UNITED STATES DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

NATIONAL MARINE FISHERIES SERVICE

Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701

SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS

The permittee shall comply with the following protected species construction conditions:

a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species.

b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973.

c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service’s Protected Resources Division, St. Petersburg, Florida.

d. All vessels associated with the construction project shall operate at “no wake/idle” speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes (e.g., marked channels) whenever possible.

e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment.

Activities may not resume until the protected species has departed the project area of its own volition.

f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service’s Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization.

Revised: February 21, 2006 O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc

Appendix C

STANDARD MANATEE CONDITIONS FOR IN-WATER WORK

The permittee shall comply with the following conditions intended to protect manatees from direct project effects:

a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.

b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.

c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.

d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.

e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and

Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida, and to FWC at ImperiledSpecies@myFWC.com

f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8 ½” by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at MyFWC.com/manatee. Questions concerning these signs can be sent to the email address listed above.

mailto:ImperiledSpecies@myFWC.com�

5848386_Cover
5845386_TOC
5848386_01_11_00
5845386_01_32_01
5845386_01_33_00
SECTION 01 33 00
PART 1 GENERAL
1.1 SUBMITTALS REQUIRED
1.2 TIMING OF SUBMITTALS
1.2.1 Timing and Sequence
1.2.2 Long Lead Time Items
1.3 SCHEDULE OF SUBMITTAL DESCRIPTIONS (SD)
SD-02 Shop Drawings (1 electronic copy)
SD-03 Product Data (1 electronic copy)
SD-04 Samples (2 each, 1 hardcopy to COR/CM and the other should be on site for the CG inspector and unit to choose from if applicable)
Field Test Reports: A written report which includes the findings of a test made at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation. The report must be signed by an authorized official of a testing laboratory or agency and must state the test was performed in accordance with the test requirements; state the test results; and indicate whether the material, product, or system has passed or failed the test.
SD-07 Certificates (1 electronic copy)
SD-10 Operation and Maintenance Manuals (Submit 1 hardcopy for review by the government to ensure completeness and then when approved by the COR submit 3 each)
PART 2 PRODUCTS
PART 3 EXECUTION
5845386_01_57_20.00_10
1.4 PAYMENT
1.5 SUBMITTALS
1.6 ENVIRONMENTAL PROTECTION PLAN
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS
3.2 WATER RESOURCES
3.3 AIR RESOURCES
3.3.1 Burning
3.4 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL
3.4.1 Solid Wastes
5845386_02_41_00
DEMOLITION AND REMOVAL
PART 1 - GENERAL
5845386_35_10_35
5845386_Appendix_A_Site_Info
4807448_Appendix_B_SubmittalRegister
Sheet1
5845386_Appendix_C_Sawfish,Sea_Turtle_Manatee_Conditions
Appendix A Sea Turtle and Smalltooth Sawfish Construction Conditions 2-21-06
national marine fisheries service

Appendix B 2011_StandardConditionsForIn-waterWork

File details come from the government source that posted it. Updated .