FBO_Combined_Synopsis-Solicitation_FAC_2005-77_PCV030.docx
DOCX document 29 KB Posted
- Attached to
- REPAIR DELTA SCIENTIFIC HYDRAULIC BARRIERS
- Solicitation number
- HSCG27-15-Q-PCV030
About this file
RFQ PACKAGE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Commercial_Supplies__Services_Clauses__Provisions_2005-72.doc | DOC document | |
| WAGE_RATES_PHILADELPHIA_05-2449.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAC 2005-77
Eff: 10/1/2014
COMBINED SYNOPSIS/SOLICITATION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and FAR 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
Instructions to offerors (Tailored for quotes under FAR part 13), evaluation criteria, and all applicable FAR Provisions and Clauses are attached.
The solicitation number is HSCG27-15-Q-PCV030 and is issued as a Request for Quotation (RFQ).
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-77.
This acquisition is issued set-aside 100% for SMALL BUSINESS.
Where Federal Acquisition Regulation clause language is inconsistent with FAR 13.004, Legal Effect of Quotations, that language is hereby tailored in accordance with FAR 12.302 to be consistent with a request for quotations. This tailoring includes, but is not limited to the following: In accordance with FAR 13.004, a quotation is not an offer, and any clause provision to the contrary is hereby modified to be consistent with FAR 13.004. Where the word "offer/offeror” or a derivative of that word appears, it is changed to "quote/quoter” or a derivative of that word.
The associated NAICS code is 561621 and the small business size standard is $30 million.
USCG Base Portsmouth has a requirement to purchase:
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment as required to repair Delta Scientific 1100 hydraulic operated barriers located at front gate of Coast Guard Sector Delaware Bay 1 Washington Ave. Philadelphia, PA 19147.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 10 working days after contract award.
3. SCOPE OF WORK:
1 Remove and replace 4 plate bearing kits (10490-00) for Delta Scientific hydraulic system.
2 Recharge two accumulators with nitrogen and adjust pressures to factory specifications.
3 Troubleshoot barriers electrical power panel and test for proper operation.
4 Ensure barriers can be controlled by card reader located adjacent to entrance.
5 Run all necessary cabling and conduit inside building from quarter deck to rear of building to allow barriers to be controlled from remote location located inside main building. Cable run is approximately 315 ft. from main entrance.
6 Supply and install control panel inside building at designated location.
7 Test barrier system for proper operation and ensue full functionality from all locations.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with DCC Allan Kniffin @ (215) 271-4838
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is DCC Allan Kniffin @ (215) 271-4838. Inquiries concerning any phase of the specification before or after award shall be made to CWO2 Louis Bevilacqua @ (609) 677-2173
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Sector Delaware Bay Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on CG Sector Delaware Bay shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29 CFR 1925 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
b. Written notification must be provided to the Sector Delaware Bay Base Safety Officer, DCC Allan Kniffin @ (215) 271-4838 in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.
c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit.
d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Sector Delaware Bay. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on Sector Delaware Bay has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on Sector Delaware Bay shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist DCC Allan Kniffin @ (215) 271-4838, prior to starting work and must be in accordance with the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Sector Delaware Bay. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
FAR 52.237-1 -- Site Visit (Apr 1984).
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Date and place of delivery and acceptance is on or before December 05, 2014
FOB Destination Delivery is to:
USCG Sector Delaware Bay 1 Washington Ave Philadelphia, PA 19147 Attn:
All quotes are due at USCG Sector Delaware Bay, PA by the Close of Business 20 November 2014.
Submit quotes to the following e-mail address or fax number by the offer due date and time:
E-Mail Address: robert.s.brusich@uscg.mil
Fax Number: (215) 271-4811 (Attn: SKC Robert Brusich)
Any and all questions regarding this solicitation shall be submitted in writing to the Contract Specialist at robert.s.brusich@uscg.mil no later than 04 December 2014, 4:00PM Eastern Time or the question may not be answered.
File details come from the government source that posted it. Updated .