Attachment_II_Pricing_Schedule.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- Shipyard Availability and COMMNAV Federal contract opportunity
- Solicitation number
- HSCG23-17-Q-PMF003
About this file
Attachment II Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_II_Pricing_Schedule_A00001.xlsx | XLSX spreadsheet | |
| 3107_555_B.pdf | ||
| 3220_311_K.PDF | ||
| Attachment_I_1342_and_1346_Specification_A00001.pdf | ||
| Attachment_IV_solicitation_provisions_A00001.pdf | ||
| Questions_and_Answers.pdf | ||
| 110B-WPB_555_1_2_-_C.pdf | ||
| R-310-0005.pdf | ||
| 110B-WPB_555_1_1_-_C.pdf | ||
| SF30-HSCG23-17-Q-PMF003_A00001.pdf | ||
| 3107_555_A.pdf | ||
| Attachment_I_1342_and_1346_Specification.pdf | ||
| Attachment_IV_solicitation_provisions.pdf | ||
| Attachment_III_Clauses.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 1342-Shipyard Availability Specification Development | ||||||||
| LOA/Funding Source | Work Item Number | Work Item Title | Labor Hours | Labor Rate | FFP Labor | FFP Material | FFP Total | |
| C4-P-GAA (INL) | GR | D | General Requirements, starting on pg xiii of Attachment I | |||||
| C4-P-GAA (INL) | 1 | D | Hull Plating, Ultrasonic Testing, starting on pg 24 of Attachment I | |||||
| C4-P-GAA (INL) | 2 | D | Hull Plating, U/W Body, Inspect, starting on pg 27 of Attachment I | |||||
| C4-P-GAA (INL) | 3 | O | Aluminum Hull and Structural ¼” Plate, Renew, starting on pg 30 of Attachment I | |||||
| C4-P-GAA (INL) | 4 | O | Steel Hull and Structural Plating (10.0-Pound), Renew, starting on pg 32 of Attachment I | |||||
| C4-P-GAA (INL) | 5 | O | Aluminum Hull and Structural 3/16" Plate, Renew, starting on pg 35 of Attachment I | |||||
| C4-P-GAA (INL) | 6 | O | Aluminum Hull and Structural 5/16" Plate, Renew, starting on pg 37 of Attachment I | |||||
| C4-P-GAA (INL) | 7 | O | Steel Hull and Structural Plating Repairs - Crack, starting on pg 39 of Attachment I | |||||
| C4-P-GAA (INL) | 8 | O | Steel Hull and Structural Plating (5-Pound) Renew, starting on pg 41 of Attachment I | |||||
| C4-P-GAA (INL) | 9 | O | Steel Hull and Structural Plating (7.0 Pound, 7.5-Pound or 7.65-Pound) Renew, starting on pg 44 of Attachment I | |||||
| C4-P-GAA (INL) | 10 | O | Steel Hull and Structural Plating, Corrugated (4.0 Pound), Renew, starting on pg 47 of Attachment I | |||||
| C4-P-GAA (INL) | 11 | O | Steel Hull and Structural Plating (6.0 pound or 5.63 Pound), Renew, starting on pg 50 of Attachment I | |||||
| C4-P-GAA (INL) | 12 | D | Tanks (MP Fuel Service, Stowage, and Overflow), Clean and Inspect, starting on pg 53 of Attachment I | |||||
| C4-P-GAA (INL) | 13 | D | Tanks (Potable Water), Clean and Inspect, starting on pg 57 of Attachment I | |||||
| C4-P-GAA (INL) | 14 | D | Doors & Hatches, Inspect, starting on pg 60 of Attachment I | |||||
| C4-P-GAA (INL) | 15 | D | Propulsion Shafting, Remove, Inspect, and Reinstall, starting on pg 67 of Attachment I | |||||
| C4-P-GAA (INL) | 16 | D | Mechanical Shaft Seal Assemblies, Overhaul, starting on pg 73 of Attachment I | |||||
| C4-P-GAA (INL) | 17 | D | Propulsion Shaft Bearings (External), Renew, starting on pg 76 of Attachment I | |||||
| C4-P-GAA (INL) | 18 | D | Propulsion Shaft, Stern Tube Forward Bearing, Renew, starting on pg 79 of Attachment I | |||||
| C4-P-GAA (INL) | 19 | D | FLOCS 15, Service, Inspect and Test, starting on pg 82 of Attachment I | |||||
| C4-P-GAA (INL) | 20 | D | Halon System, Inspect and Hydrostatic Test, starting on pg 84 of Attachment I | |||||
| C4-P-GAA (INL) | 21 | D | Fin Stabilizers, General Maintenance, starting on pg 87 of Attachment I | |||||
| C4-P-GAA (INL) | 22 | D | Eight-Person Life Rafts, Procure and Install, starting on pg 98 of Attachment I | |||||
| C4-P-GAA (INL) | 23 | D | Windows, Renew, starting on pg 100 of Attachment I | |||||
| C4-P-GAA (INL) | 24 | D | Superstructure, Preserve (100%), starting on pg 104 of Attachment I | |||||
| C4-P-GAA (INL) | 25 | D | Main Mast, Preserve, starting on pg 107 of Attachment I | |||||
| C4-P-GAA (INL) | 26 | D | U/W Body, Preserve (100%), starting on pg 111 of Attachment I | |||||
| C4-P-GAA (INL) | 27 | D | Hull Plating Freeboard, Preserve – “100%”, starting on pg 116 of Attachment I | |||||
| C4-P-GAA (INL) | 28 | D | Decks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) Partial 33%, starting on pg 119 of Attachment I | |||||
| C4-P-GAA (INL) | 29 | D | Critical Gauges and Thermometers, Test and Calibrate, starting on pg 122 of Attachment I | |||||
| C4-P-GAA (INL) | 30 | D | Main Diesel Engine; Perform Maintenance, starting on pg 125 of Attachment I | |||||
| C4-P-GAA (INL) | 31 | D | Propellers, Remove, Inspect & Polish, starting on pg 128 of Attachment I | |||||
| C4-P-GAA (INL) | 32 | D | Rudders, Remove & Inspect, starting on pg 131 of Attachment I | |||||
| C4-P-GAA (INL) | 33 | D | Tanks, (Grey Water) Clean and Inspect, starting on pg 142 of Attachment I | |||||
| C4-P-GAA (INL) | 34 | D | Tanks, (Sewage Holding) Clean and Inspect, starting on pg 145 of Attachment I | |||||
| C4-P-GAA (INL) | 35 | D | Ship Service Diesel Generators; 10,000 Hour Overhaul, starting on pg 148 of Attachment I | |||||
| C4-P-GAA (INL) | 36 | O | Engine Room Soft Patch, Remove & Reinstall (O), starting on pg 151 of Attachment I | |||||
| CS-P-LBB (FMF) | 37 | D | NAVCOM Suite, Acquire and Make Operational (Equipment), starting on pg 153 of Attachment I | |||||
| CS-P-LBB (FMF) | 37a | D | NAVCOM Suite, Acquire and Make Operational (Labor for Testing & Installation), starting on pg 153 of Attachment I | |||||
| CS-P-LBB (FMF) | 37b | O | NAVCOM Suite, Spare Parts, starting on pg 153 of Attachment I | |||||
| C4-P-GAA (INL) | 38 | D | Seawater Heat Exchangers; Inspect, Clean & Test, starting on pg 159 of Attachment I | |||||
| C4-P-GAA (INL) | 39 | D | Main Propulsion System, Reactivate, starting on pg 163 of Attachment I | |||||
| C4-P-GAA (INL) | 40 | D | Sea Water Systems, Reactivate, starting on pg 169 of Attachment I | |||||
| C4-P-GAA (INL) | 41 | D | Sea Strainers – Duplex (All Sizes), Overhaul, starting on pg 173 of Attachment I | |||||
| C4-P-GAA (INL) | 42 | D | Main Battery Chargers Inspect & Calibrate, starting on pg 176 of Attachment I | |||||
| C4-P-GAA (INL) | 43 | D | Electric Distribution System, Reactivate, starting on pg 179 of Attachment I | |||||
| C4-P-GAA (INL) | 44 | D | Gyrocompass & Auto-Pilot System, Reactivate, starting on pg 182 of Attachment I | |||||
| C4-P-GAA (INL) | 45 | D | Murphy Alarm Panel & Bilge Flooding Alarm Systems, Inspect & Calibrate, starting on pg 184 of Attachment I | |||||
| C4-P-GAA (INL) | 46 | D | HVAC System, Reactivate, starting on pg 187 of Attachment I | |||||
| C4-P-GAA (INL) | 47 | D | Bilge Drainage System, Reactivate, starting on pg 195 of Attachment I | |||||
| C4-P-GAA (INL) | 48 | O | Reverse Osmosis Watermaker, Reactivate (O), starting on pg 198 of Attachment I | |||||
| C4-P-GAA (INL) | 49 | D | Potable Water System, Reactivate & Repair, starting on pg 201 of Attachment I | |||||
| C4-P-GAA (INL) | 50 | D | Fuel Oil Fill, Service and Transfer System, Reactivate, starting on pg 205 of Attachment I | |||||
| C4-P-GAA (INL) | 51 | D | Steering Gear, Reactivate, starting on pg 211 of Attachment I | |||||
| C4-P-GAA (INL) | 52 | D | Electro-Hydraulic Crane, Reactivate, starting on pg 215 of Attachment I | |||||
| C4-P-GAA (INL) | 53 | D | Small Boat, Reactivate, starting on pg 221 of Attachment I | |||||
| C4-P-GAA (INL) | 54 | D | Sewage System Reactivate, starting on pg 224 of Attachment I | |||||
| C4-P-GAA (INL) | 55 | D | Grey Water System, Reactivate, starting on pg 229 of Attachment I | |||||
| C4-P-GAA (INL) | 56 | O | Oily Water Separator, Reactivate (O), starting on pg 235 of Attachment I | |||||
| C4-P-GAA (INL) | 57 | D | Cathodic Protection System, Reactivate, starting on pg 241 of Attachment I | |||||
| C4-P-GAA (INL) | 58 | D | Galley Equipment, Reactivate, starting on pg 248 of Attachment I | |||||
| C4-P-GAA (INL) | 59 | D | Fire Main System, Reactivate, starting on pg 251 of Attachment I | |||||
| C4-P-GAA (INL) | 60 | D | Ship’s Whistle, Reactivate, starting on pg 255 of Attachment I | |||||
| C4-P-GAA (INL) | 61 | O | Inspect & Reactivate Vessels Portable Fire Extinguishers, starting on pg 257 of Attachment I | |||||
| C4-P-GAA (INL) | 62 | D | Sea Trial Performance, Provide Support, starting on pg 261 of Attachment I | |||||
| C4-P-GAA (INL) | 62a | O | Sea Trial Performance, Return Transit, starting on pg 261 of Attachment I | |||||
| C4-P-GAA (INL) | 63 | D | Temporary Services, Provide, starting on pg 265 of Attachment I | |||||
| C4-P-GAA (INL) | 64 | D | Towing Services, Provide (Home Port to Shipyard), starting on pg 268 of Attachment I | |||||
| C4-P-GAA (INL) | 64a | D | Towing Services, Provide Return Tow (Shipyard back to Home Port), starting on pg 268 of Attachment I | |||||
| C4-P-GAA (INL) | 65 | D | Drydocking, starting on pg 272 of Attachment I |
| Labor Hours | Labor Rate | FFP Labor | FFP Material | FFP Total | ||||
| D | Definite Work Items | |||||||
| O | Optional Work Items | |||||||
| Growth Labor Hours Estimate | Composite Labor Rate | Growth Labor Total | Growth Material Estimate | Growth Material Overhead Rate | Growth Material Total | Total Estimated Growth Work | ||
| Growth Estimate | 2945.00 | $255,554.00 | ||||||
| Total Evaluated Price | ||||||||
| FFP Total + Total Estimated Growth Work | $0.00 |
HSCG23-17-Q-PMF003 &"Arial,Bold"&12 Proposal Pricing Schedule for Costa Rica 110' WPB-1342 &14Attachment II
&"Arial,Bold"&12&P of &N
| 1345-Shipyard Availability Specification Development | ||||||||
| LOA/Funding Source | Work Item Number | Work Item Title | Labor Hours | Labor Rate | FFP Labor | FFP Material | FFP Total | |
| C4-P-GAA (INL) | GR | D | General Requirements, starting on pg xiii of Attachment I | |||||
| C4-P-GAA (INL) | 1 | D | Hull Plating, Ultrasonic Testing, starting on pg 24 of Attachment I | |||||
| C4-P-GAA (INL) | 2 | D | Hull Plating, U/W Body, Inspect, starting on pg 27 of Attachment I | |||||
| C4-P-GAA (INL) | 3 | O | Aluminum Hull and Structural ¼” Plate, Renew, starting on pg 30 of Attachment I | |||||
| C4-P-GAA (INL) | 4 | O | Steel Hull and Structural Plating (10.0-Pound), Renew, starting on pg 32 of Attachment I | |||||
| C4-P-GAA (INL) | 5 | O | Aluminum Hull and Structural 3/16" Plate, Renew, starting on pg 35 of Attachment I | |||||
| C4-P-GAA (INL) | 6 | O | Aluminum Hull and Structural 5/16" Plate, Renew, starting on pg 37 of Attachment I | |||||
| C4-P-GAA (INL) | 7 | O | Steel Hull and Structural Plating Repairs - Crack, starting on pg 39 of Attachment I | |||||
| C4-P-GAA (INL) | 8 | O | Steel Hull and Structural Plating (5-Pound) Renew, starting on pg 41 of Attachment I | |||||
| C4-P-GAA (INL) | 9 | O | Steel Hull and Structural Plating (7.0 Pound, 7.5-Pound or 7.65-Pound) Renew, starting on pg 44 of Attachment I | |||||
| C4-P-GAA (INL) | 10 | O | Steel Hull and Structural Plating, Corrugated (4.0 Pound), Renew, starting on pg 47 of Attachment I | |||||
| C4-P-GAA (INL) | 11 | O | Steel Hull and Structural Plating (6.0 pound or 5.63 Pound), Renew, starting on pg 50 of Attachment I | |||||
| C4-P-GAA (INL) | 12 | D | Tanks (MP Fuel Service, Stowage, and Overflow), Clean and Inspect, starting on pg 53 of Attachment I | |||||
| C4-P-GAA (INL) | 13 | D | Tanks (Potable Water), Clean and Inspect, starting on pg 57 of Attachment I | |||||
| C4-P-GAA (INL) | 14 | D | Doors & Hatches, Inspect, starting on pg 60 of Attachment I | |||||
| C4-P-GAA (INL) | 15 | D | Propulsion Shafting, Remove, Inspect, and Reinstall, starting on pg 67 of Attachment I | |||||
| C4-P-GAA (INL) | 16 | D | Mechanical Shaft Seal Assemblies, Overhaul, starting on pg 73 of Attachment I | |||||
| C4-P-GAA (INL) | 17 | D | Propulsion Shaft Bearings (External), Renew, starting on pg 76 of Attachment I | |||||
| C4-P-GAA (INL) | 18 | D | Propulsion Shaft, Stern Tube Forward Bearing, Renew, starting on pg 79 of Attachment I | |||||
| C4-P-GAA (INL) | 19 | D | FLOCS 15, Service, Inspect and Test, starting on pg 82 of Attachment I | |||||
| C4-P-GAA (INL) | 20 | D | Halon System, Inspect and Hydrostatic Test, starting on pg 84 of Attachment I | |||||
| C4-P-GAA (INL) | 21 | D | Fin Stabilizers, General Maintenance, starting on pg 87 of Attachment I | |||||
| C4-P-GAA (INL) | 22 | D | Eight-Person Life Rafts, Procure and Install, starting on pg 98 of Attachment I | |||||
| C4-P-GAA (INL) | 23 | D | Windows, Renew, starting on pg 100 of Attachment I | |||||
| C4-P-GAA (INL) | 24 | D | Superstructure, Preserve (100%), starting on pg 104 of Attachment I | |||||
| C4-P-GAA (INL) | 25 | D | Main Mast, Preserve, starting on pg 107 of Attachment I | |||||
| C4-P-GAA (INL) | 26 | D | U/W Body, Preserve (100%), starting on pg 111 of Attachment I | |||||
| C4-P-GAA (INL) | 27 | D | Hull Plating Freeboard, Preserve – “100%”, starting on pg 116 of Attachment I | |||||
| C4-P-GAA (INL) | 28 | D | Decks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) Partial 33%, starting on pg 119 of Attachment I | |||||
| C4-P-GAA (INL) | 29 | D | Critical Gauges and Thermometers, Test and Calibrate, starting on pg 122 of Attachment I | |||||
| C4-P-GAA (INL) | 30 | D | Main Diesel Engine; Perform Maintenance, starting on pg 125 of Attachment I | |||||
| C4-P-GAA (INL) | 31 | D | Propellers, Remove, Inspect & Polish, starting on pg 128 of Attachment I | |||||
| C4-P-GAA (INL) | 32 | D | Rudders, Remove & Inspect, starting on pg 131 of Attachment I | |||||
| C4-P-GAA (INL) | 33 | D | Tanks, (Grey Water) Clean and Inspect, starting on pg 142 of Attachment I | |||||
| C4-P-GAA (INL) | 34 | D | Tanks, (Sewage Holding) Clean and Inspect, starting on pg 145 of Attachment I | |||||
| C4-P-GAA (INL) | 35 | D | Ship Service Diesel Generators; 10,000 Hour Overhaul, starting on pg 148 of Attachment I | |||||
| C4-P-GAA (INL) | 36 | O | Engine Room Soft Patch, Remove & Reinstall (O), starting on pg 151 of Attachment I | |||||
| CS-P-LBB (FMF) | 37 | D | NAVCOM Suite, Acquire and Make Operational (Equipment), starting on pg 153 of Attachment I | |||||
| CS-P-LBB (FMF) | 37a | D | NAVCOM Suite, Acquire and Make Operational (Labor for Testing & Installation), starting on pg 153 of Attachment I | |||||
| CS-P-LBB (FMF) | 37b | O | NAVCOM Suite, Spare Parts, starting on pg 153 of Attachment I | |||||
| C4-P-GAA (INL) | 38 | D | Seawater Heat Exchangers; Inspect, Clean & Test, starting on pg 159 of Attachment I | |||||
| C4-P-GAA (INL) | 39 | D | Main Propulsion System, Reactivate, starting on pg 163 of Attachment I | |||||
| C4-P-GAA (INL) | 40 | D | Sea Water Systems, Reactivate, starting on pg 169 of Attachment I | |||||
| C4-P-GAA (INL) | 41 | D | Sea Strainers – Duplex (All Sizes), Overhaul, starting on pg 173 of Attachment I | |||||
| C4-P-GAA (INL) | 42 | D | Main Battery Chargers Inspect & Calibrate, starting on pg 176 of Attachment I | |||||
| C4-P-GAA (INL) | 43 | D | Electric Distribution System, Reactivate, starting on pg 179 of Attachment I | |||||
| C4-P-GAA (INL) | 44 | D | Gyrocompass & Auto-Pilot System, Reactivate, starting on pg 182 of Attachment I | |||||
| C4-P-GAA (INL) | 45 | D | Murphy Alarm Panel & Bilge Flooding Alarm Systems, Inspect & Calibrate, starting on pg 184 of Attachment I | |||||
| C4-P-GAA (INL) | 46 | D | HVAC System, Reactivate, starting on pg 187 of Attachment I | |||||
| C4-P-GAA (INL) | 47 | D | Bilge Drainage System, Reactivate, starting on pg 195 of Attachment I | |||||
| C4-P-GAA (INL) | 48 | O | Reverse Osmosis Watermaker, Reactivate (O), starting on pg 198 of Attachment I | |||||
| C4-P-GAA (INL) | 49 | D | Potable Water System, Reactivate & Repair, starting on pg 201 of Attachment I | |||||
| C4-P-GAA (INL) | 50 | D | Fuel Oil Fill, Service and Transfer System, Reactivate, starting on pg 205 of Attachment I | |||||
| C4-P-GAA (INL) | 51 | D | Steering Gear, Reactivate, starting on pg 211 of Attachment I | |||||
| C4-P-GAA (INL) | 52 | D | Electro-Hydraulic Crane, Reactivate, starting on pg 215 of Attachment I | |||||
| C4-P-GAA (INL) | 53 | D | Small Boat, Reactivate, starting on pg 221 of Attachment I | |||||
| C4-P-GAA (INL) | 54 | D | Sewage System Reactivate, starting on pg 224 of Attachment I | |||||
| C4-P-GAA (INL) | 55 | D | Grey Water System, Reactivate, starting on pg 229 of Attachment I | |||||
| C4-P-GAA (INL) | 56 | O | Oily Water Separator, Reactivate (O), starting on pg 235 of Attachment I | |||||
| C4-P-GAA (INL) | 57 | D | Cathodic Protection System, Reactivate, starting on pg 241 of Attachment I | |||||
| C4-P-GAA (INL) | 58 | D | Galley Equipment, Reactivate, starting on pg 248 of Attachment I | |||||
| C4-P-GAA (INL) | 59 | D | Fire Main System, Reactivate, starting on pg 251 of Attachment I | |||||
| C4-P-GAA (INL) | 60 | D | Ship’s Whistle, Reactivate, starting on pg 255 of Attachment I | |||||
| C4-P-GAA (INL) | 61 | O | Inspect & Reactivate Vessels Portable Fire Extinguishers, starting on pg 257 of Attachment I | |||||
| C4-P-GAA (INL) | 62 | D | Sea Trial Performance, Provide Support, starting on pg 261 of Attachment I | |||||
| C4-P-GAA (INL) | 62a | O | Sea Trial Performance, Return Transit, starting on pg 261 of Attachment I | |||||
| C4-P-GAA (INL) | 63 | D | Temporary Services, Provide, starting on pg 265 of Attachment I | |||||
| C4-P-GAA (INL) | 64 | D | Towing Services, Provide (Home Port to Shipyard), starting on pg 268 of Attachment I | |||||
| C4-P-GAA (INL) | 64a | D | Towing Services, Provide Return Tow (Shipyard back to Home Port), starting on pg 268 of Attachment I | |||||
| C4-P-GAA (INL) | 65 | D | Drydocking, starting on pg 272 of Attachment I |
| Labor Hours | Labor Rate | FFP Labor | FFP Material | FFP Total | ||||
| D | Definite Work Items | |||||||
| O | Optional Work Items | |||||||
| Growth Labor Hours Estimate | Composite Labor Rate | Growth Labor Total | Growth Material Estimate | Growth Material Overhead Rate | Growth Material Total | Total Estimated Growth Work | ||
| Growth Estimate | 2945.00 | $255,554.00 | ||||||
| Total Evaluated Price | ||||||||
| FFP Total+ Total Estimated Growth Work | $0.00 |
&12HSCG23-17-Q-PMF003 &"Arial,Bold"&12Proposal Pricing Schedule for Costa Rica 110' WPB-1346 &12Attachment II
WPB 1346 &"Arial,Bold"&12&P of &N
Lay Days
| Lay Days | ||
| Offerors Firm Fixed Price per Day | Estimated number of Lay Days | Total Estimated Lay Day Cost |
| 5 | 0 |
COMNAV
| Work Item 37 | Definite (D) Equipment Items | NAVCOM Suite, Acquire and Make Operational (Equipment) | ||||
| Description | Detailed Description | Per Vessel Qty | Unit Price | Total Price | Comments | |
| i. | Primary Surface Search Radar | One (1) FURUNO ARPA Radar FAR-21x7 series system and one FURUNO XN20AF/6.5 Foot Open Array Antenna. |
| The FURUNO Far 21x7 series system shall consist of the following individual equipment: 1.) MU190 19 inch Color LCD Monitor, 2.) RPU013H 25kW Processor Unit, 3.) RSB096-079A 24 RPM Gearbox with 25kW Transceiver, 4.) RCU014 Keyboard Control Unit with Trackball & 10 meter cable, 5.) 001-078-410 30 meter Cable, and 6.) FAR-190-BKT MU190 Mounting Bracket. | 1 | Primary Surface Search radar system shall be capable of interfacing with the gyrocompass, Differential Global Positioning Systems (DGPS), and Automatic Identification System (AIS) | ||||
| ii. | Automatic Identification System | |||||
| (AIS) | One (1) Class “A” AIS system. System shall consist of a: 1) Class “A” AIS Transponder Unit, 2.) Display Unit, 3.) GPS Antenna, and 4.) VHF Transmit Antenna capable of transmitting at least 12 Watts. | 1 | The Automatic Identification System (AIS) shall be capable of interfacing with the Multifunction Display and Primary Surface Search Radar | |||
| iii. | Multifunction Display | One (1) FURUNO TZTL12F | 1 | The Multifunction Display shall be equipped with an internal 56 Channel GPS receiver and shall be compatible with the existing Airmar SS505 Transducer. Display shall be capable of displaying GPS and depth information. |
The Multifunction display shall also be supplied with all the electronic navigation charts necessary to transit from Baltimore, MD to Costa Rica.
iv. Satellite Communications One (1) FURUNO KU-100 VSAT Communications Solution.
System shall consist of the following individual equipment: 1.) KU-100AT Antenna Unit, 2.) KU-100AC Antenna Control Unit, and 3.) 8D-FB-CV Cable. 1 The Satellite Communication System shall consist of all the necessary equipment to provide the vessel with broadband voice and data communications at sea.
The Costa Rican Coast Guard shall be provided with 2 years of Satellite Service at the time of installation.
| Satellite Communications - Supplement | Satellite Service | Reference Item iv. Satellite Communications | |||
| v. | Global Positioning System (GPS) | One (1) GARMIN GPSMAP 8012 MFD 12” Chartplotter | |||
| One (1) GARMIN brand 4 foot Open Array Radar | 1 | The GARMIN 8012 MF 12” Chartplotter shall be supplied with an external 10 Hz GPS/GLOSNASS that updates position and heading 10 times per second. |
The GARMIN GPSMAP 8012 MFD 12” Chartplotter shall connect to and interface with a GARMIN brand 4 foot open array radar. The radar shall have a minimum power out of 6kW and max range of at least 48 nautical miles. Radar shall also be equipped with Mini-Automatic Radar Plotting Aid (MARPA) tracking and be capable of tracking up to 10 selected contacts.
| GPS - Supplement | Navigational charts | Reference item v. GPS | |||||
| vi. | High Frequency (HF) Radio | One (1) ICOM M802 HF System. System shall consist of the following individual equipment: 1.) M802 HF Marine Transceiver, 2.) AT-140 Antenna Tuner, and 3.) HF /SSB Antenna capable of transmitting and receiving the HF frequency band (2 to 30 Mhz) at 125 Watts of Transmit Power. | 1 | Contractor shall also install a protective enclosure to house the AT-140 Antenna Tuner. | |||
| vii. | Very High Frequency (VHF) Radio | One (1) ICOM IC-F5061D IDAS Mobile VHF Radio, which shall also include One (1) HS-02774-1 VHF Antenna and ICOM Quicksilver GPS Antenna. | |||||
| Two (2) ICOM IC-M604 Radios with Two (2) Shakespeare Marina 5225XT VHF antennas. | 1 | ||||||
| viii. | Ultra High Frequency (UHF) | ||||||
| Radios | Two (2) MOTOROLA Astro 25 XTL 2500 P25 Mobile Radio Systems | 2 | All UHF radio systems shall include UHF transceivers, trunk mounts, and 800 Mhz antennas. | ||||
| ix. | (Supplement) | Additional Material Required for Installation | 1 | Includes items such as hardware, software, cabling, connectors, Power Supplies, Routers, Converters, Adapters | |||
| Total Equipment Cost (Per Vessel) | 1 | $0.00 |
| HSCG23-17-Q-PMF003 | COM/NAV Equipment List |
| Per Vessel | Attachment II |
Foreseeable Cost Factors
| Number of Personnel | Number of Days in Period of Performance | Daily Rate | Sub Total | Remarks | |
| Family Separation Allowance | 3 | 70 | $8.33 | $1,749.30 | $8.33 is the daily rate for FSA as listed on DFAS.mil |
| Travel and Per Diem | 3 | 70 | Per Diem rates will be based on the GSA rates for the zip code in which the offeror resides. Offerors shall enter the lodging and meals and expenses rates based on their zip code. | ||
| Total | This Grand total shall be entered into cell B5 on the Grand Total sheet. |
HSCG23-17-Q-PMF003 Foreseeable Cost Factors &12Attachment II
Total Evaluated Price
| Description | Price |
| Vessel 1342 (FFP + Estimated Growth) | |
| Vessel 1346 (FFP + Estimated Growth) | |
| Total Estimated Lay Days Cost | |
| Foreseeable Cost Factors | |
| Total Evaluated Price | 0 |
&12HSCG23-17-Q-PMF003 &12Grand Total of Proposal Price &12Attachment II
File details come from the government source that posted it. Updated .