Attachment_II_Pricing_Schedule.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
Shipyard Availability and COMMNAV Federal contract opportunity
Solicitation number
HSCG23-17-Q-PMF003
Issued by
Department of Homeland Security US Coast Guard

About this file

Attachment II Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Shipyard Availability and COMMNAV, newest first.
File Type Posted
Attachment_II_Pricing_Schedule_A00001.xlsx XLSX spreadsheet
3107_555_B.pdf PDF
3220_311_K.PDF PDF
Attachment_I_1342_and_1346_Specification_A00001.pdf PDF
Attachment_IV_solicitation_provisions_A00001.pdf PDF
Questions_and_Answers.pdf PDF
110B-WPB_555_1_2_-_C.pdf PDF
R-310-0005.pdf PDF
110B-WPB_555_1_1_-_C.pdf PDF
SF30-HSCG23-17-Q-PMF003_A00001.pdf PDF
3107_555_A.pdf PDF
Attachment_I_1342_and_1346_Specification.pdf PDF
Attachment_IV_solicitation_provisions.pdf PDF
Attachment_III_Clauses.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1342-Shipyard Availability Specification Development
LOA/Funding SourceWork Item NumberWork Item TitleLabor HoursLabor RateFFP LaborFFP MaterialFFP Total
C4-P-GAA (INL)GRDGeneral Requirements, starting on pg xiii of Attachment I
C4-P-GAA (INL)1DHull Plating, Ultrasonic Testing, starting on pg 24 of Attachment I
C4-P-GAA (INL)2DHull Plating, U/W Body, Inspect, starting on pg 27 of Attachment I
C4-P-GAA (INL)3OAluminum Hull and Structural ¼” Plate, Renew, starting on pg 30 of Attachment I
C4-P-GAA (INL)4OSteel Hull and Structural Plating (10.0-Pound), Renew, starting on pg 32 of Attachment I
C4-P-GAA (INL)5OAluminum Hull and Structural 3/16" Plate, Renew, starting on pg 35 of Attachment I
C4-P-GAA (INL)6OAluminum Hull and Structural 5/16" Plate, Renew, starting on pg 37 of Attachment I
C4-P-GAA (INL)7OSteel Hull and Structural Plating Repairs - Crack, starting on pg 39 of Attachment I
C4-P-GAA (INL)8OSteel Hull and Structural Plating (5-Pound) Renew, starting on pg 41 of Attachment I
C4-P-GAA (INL)9OSteel Hull and Structural Plating (7.0 Pound, 7.5-Pound or 7.65-Pound) Renew, starting on pg 44 of Attachment I
C4-P-GAA (INL)10OSteel Hull and Structural Plating, Corrugated (4.0 Pound), Renew, starting on pg 47 of Attachment I
C4-P-GAA (INL)11OSteel Hull and Structural Plating (6.0 pound or 5.63 Pound), Renew, starting on pg 50 of Attachment I
C4-P-GAA (INL)12DTanks (MP Fuel Service, Stowage, and Overflow), Clean and Inspect, starting on pg 53 of Attachment I
C4-P-GAA (INL)13DTanks (Potable Water), Clean and Inspect, starting on pg 57 of Attachment I
C4-P-GAA (INL)14DDoors & Hatches, Inspect, starting on pg 60 of Attachment I
C4-P-GAA (INL)15DPropulsion Shafting, Remove, Inspect, and Reinstall, starting on pg 67 of Attachment I
C4-P-GAA (INL)16DMechanical Shaft Seal Assemblies, Overhaul, starting on pg 73 of Attachment I
C4-P-GAA (INL)17DPropulsion Shaft Bearings (External), Renew, starting on pg 76 of Attachment I
C4-P-GAA (INL)18DPropulsion Shaft, Stern Tube Forward Bearing, Renew, starting on pg 79 of Attachment I
C4-P-GAA (INL)19DFLOCS 15, Service, Inspect and Test, starting on pg 82 of Attachment I
C4-P-GAA (INL)20DHalon System, Inspect and Hydrostatic Test, starting on pg 84 of Attachment I
C4-P-GAA (INL)21DFin Stabilizers, General Maintenance, starting on pg 87 of Attachment I
C4-P-GAA (INL)22DEight-Person Life Rafts, Procure and Install, starting on pg 98 of Attachment I
C4-P-GAA (INL)23DWindows, Renew, starting on pg 100 of Attachment I
C4-P-GAA (INL)24DSuperstructure, Preserve (100%), starting on pg 104 of Attachment I
C4-P-GAA (INL)25DMain Mast, Preserve, starting on pg 107 of Attachment I
C4-P-GAA (INL)26DU/W Body, Preserve (100%), starting on pg 111 of Attachment I
C4-P-GAA (INL)27DHull Plating Freeboard, Preserve – “100%”, starting on pg 116 of Attachment I
C4-P-GAA (INL)28DDecks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) Partial 33%, starting on pg 119 of Attachment I
C4-P-GAA (INL)29DCritical Gauges and Thermometers, Test and Calibrate, starting on pg 122 of Attachment I
C4-P-GAA (INL)30DMain Diesel Engine; Perform Maintenance, starting on pg 125 of Attachment I
C4-P-GAA (INL)31DPropellers, Remove, Inspect & Polish, starting on pg 128 of Attachment I
C4-P-GAA (INL)32DRudders, Remove & Inspect, starting on pg 131 of Attachment I
C4-P-GAA (INL)33DTanks, (Grey Water) Clean and Inspect, starting on pg 142 of Attachment I
C4-P-GAA (INL)34DTanks, (Sewage Holding) Clean and Inspect, starting on pg 145 of Attachment I
C4-P-GAA (INL)35DShip Service Diesel Generators; 10,000 Hour Overhaul, starting on pg 148 of Attachment I
C4-P-GAA (INL)36OEngine Room Soft Patch, Remove & Reinstall (O), starting on pg 151 of Attachment I
CS-P-LBB (FMF)37DNAVCOM Suite, Acquire and Make Operational (Equipment), starting on pg 153 of Attachment I
CS-P-LBB (FMF)37aDNAVCOM Suite, Acquire and Make Operational (Labor for Testing & Installation), starting on pg 153 of Attachment I
CS-P-LBB (FMF)37bONAVCOM Suite, Spare Parts, starting on pg 153 of Attachment I
C4-P-GAA (INL)38DSeawater Heat Exchangers; Inspect, Clean & Test, starting on pg 159 of Attachment I
C4-P-GAA (INL)39DMain Propulsion System, Reactivate, starting on pg 163 of Attachment I
C4-P-GAA (INL)40DSea Water Systems, Reactivate, starting on pg 169 of Attachment I
C4-P-GAA (INL)41DSea Strainers – Duplex (All Sizes), Overhaul, starting on pg 173 of Attachment I
C4-P-GAA (INL)42DMain Battery Chargers Inspect & Calibrate, starting on pg 176 of Attachment I
C4-P-GAA (INL)43DElectric Distribution System, Reactivate, starting on pg 179 of Attachment I
C4-P-GAA (INL)44DGyrocompass & Auto-Pilot System, Reactivate, starting on pg 182 of Attachment I
C4-P-GAA (INL)45DMurphy Alarm Panel & Bilge Flooding Alarm Systems, Inspect & Calibrate, starting on pg 184 of Attachment I
C4-P-GAA (INL)46DHVAC System, Reactivate, starting on pg 187 of Attachment I
C4-P-GAA (INL)47DBilge Drainage System, Reactivate, starting on pg 195 of Attachment I
C4-P-GAA (INL)48OReverse Osmosis Watermaker, Reactivate (O), starting on pg 198 of Attachment I
C4-P-GAA (INL)49DPotable Water System, Reactivate & Repair, starting on pg 201 of Attachment I
C4-P-GAA (INL)50DFuel Oil Fill, Service and Transfer System, Reactivate, starting on pg 205 of Attachment I
C4-P-GAA (INL)51DSteering Gear, Reactivate, starting on pg 211 of Attachment I
C4-P-GAA (INL)52DElectro-Hydraulic Crane, Reactivate, starting on pg 215 of Attachment I
C4-P-GAA (INL)53DSmall Boat, Reactivate, starting on pg 221 of Attachment I
C4-P-GAA (INL)54DSewage System Reactivate, starting on pg 224 of Attachment I
C4-P-GAA (INL)55DGrey Water System, Reactivate, starting on pg 229 of Attachment I
C4-P-GAA (INL)56OOily Water Separator, Reactivate (O), starting on pg 235 of Attachment I
C4-P-GAA (INL)57DCathodic Protection System, Reactivate, starting on pg 241 of Attachment I
C4-P-GAA (INL)58DGalley Equipment, Reactivate, starting on pg 248 of Attachment I
C4-P-GAA (INL)59DFire Main System, Reactivate, starting on pg 251 of Attachment I
C4-P-GAA (INL)60DShip’s Whistle, Reactivate, starting on pg 255 of Attachment I
C4-P-GAA (INL)61OInspect & Reactivate Vessels Portable Fire Extinguishers, starting on pg 257 of Attachment I
C4-P-GAA (INL)62DSea Trial Performance, Provide Support, starting on pg 261 of Attachment I
C4-P-GAA (INL)62aOSea Trial Performance, Return Transit, starting on pg 261 of Attachment I
C4-P-GAA (INL)63DTemporary Services, Provide, starting on pg 265 of Attachment I
C4-P-GAA (INL)64DTowing Services, Provide (Home Port to Shipyard), starting on pg 268 of Attachment I
C4-P-GAA (INL)64aDTowing Services, Provide Return Tow (Shipyard back to Home Port), starting on pg 268 of Attachment I
C4-P-GAA (INL)65DDrydocking, starting on pg 272 of Attachment I
Labor HoursLabor RateFFP LaborFFP MaterialFFP Total
DDefinite Work Items
OOptional Work Items
Growth Labor Hours EstimateComposite Labor RateGrowth Labor TotalGrowth Material EstimateGrowth Material Overhead RateGrowth Material TotalTotal Estimated Growth Work
Growth Estimate2945.00$255,554.00
Total Evaluated Price
FFP Total + Total Estimated Growth Work$0.00

HSCG23-17-Q-PMF003 &"Arial,Bold"&12 Proposal Pricing Schedule for Costa Rica 110' WPB-1342 &14Attachment II

&"Arial,Bold"&12&P of &N

1345-Shipyard Availability Specification Development
LOA/Funding SourceWork Item NumberWork Item TitleLabor HoursLabor RateFFP LaborFFP MaterialFFP Total
C4-P-GAA (INL)GRDGeneral Requirements, starting on pg xiii of Attachment I
C4-P-GAA (INL)1DHull Plating, Ultrasonic Testing, starting on pg 24 of Attachment I
C4-P-GAA (INL)2DHull Plating, U/W Body, Inspect, starting on pg 27 of Attachment I
C4-P-GAA (INL)3OAluminum Hull and Structural ¼” Plate, Renew, starting on pg 30 of Attachment I
C4-P-GAA (INL)4OSteel Hull and Structural Plating (10.0-Pound), Renew, starting on pg 32 of Attachment I
C4-P-GAA (INL)5OAluminum Hull and Structural 3/16" Plate, Renew, starting on pg 35 of Attachment I
C4-P-GAA (INL)6OAluminum Hull and Structural 5/16" Plate, Renew, starting on pg 37 of Attachment I
C4-P-GAA (INL)7OSteel Hull and Structural Plating Repairs - Crack, starting on pg 39 of Attachment I
C4-P-GAA (INL)8OSteel Hull and Structural Plating (5-Pound) Renew, starting on pg 41 of Attachment I
C4-P-GAA (INL)9OSteel Hull and Structural Plating (7.0 Pound, 7.5-Pound or 7.65-Pound) Renew, starting on pg 44 of Attachment I
C4-P-GAA (INL)10OSteel Hull and Structural Plating, Corrugated (4.0 Pound), Renew, starting on pg 47 of Attachment I
C4-P-GAA (INL)11OSteel Hull and Structural Plating (6.0 pound or 5.63 Pound), Renew, starting on pg 50 of Attachment I
C4-P-GAA (INL)12DTanks (MP Fuel Service, Stowage, and Overflow), Clean and Inspect, starting on pg 53 of Attachment I
C4-P-GAA (INL)13DTanks (Potable Water), Clean and Inspect, starting on pg 57 of Attachment I
C4-P-GAA (INL)14DDoors & Hatches, Inspect, starting on pg 60 of Attachment I
C4-P-GAA (INL)15DPropulsion Shafting, Remove, Inspect, and Reinstall, starting on pg 67 of Attachment I
C4-P-GAA (INL)16DMechanical Shaft Seal Assemblies, Overhaul, starting on pg 73 of Attachment I
C4-P-GAA (INL)17DPropulsion Shaft Bearings (External), Renew, starting on pg 76 of Attachment I
C4-P-GAA (INL)18DPropulsion Shaft, Stern Tube Forward Bearing, Renew, starting on pg 79 of Attachment I
C4-P-GAA (INL)19DFLOCS 15, Service, Inspect and Test, starting on pg 82 of Attachment I
C4-P-GAA (INL)20DHalon System, Inspect and Hydrostatic Test, starting on pg 84 of Attachment I
C4-P-GAA (INL)21DFin Stabilizers, General Maintenance, starting on pg 87 of Attachment I
C4-P-GAA (INL)22DEight-Person Life Rafts, Procure and Install, starting on pg 98 of Attachment I
C4-P-GAA (INL)23DWindows, Renew, starting on pg 100 of Attachment I
C4-P-GAA (INL)24DSuperstructure, Preserve (100%), starting on pg 104 of Attachment I
C4-P-GAA (INL)25DMain Mast, Preserve, starting on pg 107 of Attachment I
C4-P-GAA (INL)26DU/W Body, Preserve (100%), starting on pg 111 of Attachment I
C4-P-GAA (INL)27DHull Plating Freeboard, Preserve – “100%”, starting on pg 116 of Attachment I
C4-P-GAA (INL)28DDecks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) Partial 33%, starting on pg 119 of Attachment I
C4-P-GAA (INL)29DCritical Gauges and Thermometers, Test and Calibrate, starting on pg 122 of Attachment I
C4-P-GAA (INL)30DMain Diesel Engine; Perform Maintenance, starting on pg 125 of Attachment I
C4-P-GAA (INL)31DPropellers, Remove, Inspect & Polish, starting on pg 128 of Attachment I
C4-P-GAA (INL)32DRudders, Remove & Inspect, starting on pg 131 of Attachment I
C4-P-GAA (INL)33DTanks, (Grey Water) Clean and Inspect, starting on pg 142 of Attachment I
C4-P-GAA (INL)34DTanks, (Sewage Holding) Clean and Inspect, starting on pg 145 of Attachment I
C4-P-GAA (INL)35DShip Service Diesel Generators; 10,000 Hour Overhaul, starting on pg 148 of Attachment I
C4-P-GAA (INL)36OEngine Room Soft Patch, Remove & Reinstall (O), starting on pg 151 of Attachment I
CS-P-LBB (FMF)37DNAVCOM Suite, Acquire and Make Operational (Equipment), starting on pg 153 of Attachment I
CS-P-LBB (FMF)37aDNAVCOM Suite, Acquire and Make Operational (Labor for Testing & Installation), starting on pg 153 of Attachment I
CS-P-LBB (FMF)37bONAVCOM Suite, Spare Parts, starting on pg 153 of Attachment I
C4-P-GAA (INL)38DSeawater Heat Exchangers; Inspect, Clean & Test, starting on pg 159 of Attachment I
C4-P-GAA (INL)39DMain Propulsion System, Reactivate, starting on pg 163 of Attachment I
C4-P-GAA (INL)40DSea Water Systems, Reactivate, starting on pg 169 of Attachment I
C4-P-GAA (INL)41DSea Strainers – Duplex (All Sizes), Overhaul, starting on pg 173 of Attachment I
C4-P-GAA (INL)42DMain Battery Chargers Inspect & Calibrate, starting on pg 176 of Attachment I
C4-P-GAA (INL)43DElectric Distribution System, Reactivate, starting on pg 179 of Attachment I
C4-P-GAA (INL)44DGyrocompass & Auto-Pilot System, Reactivate, starting on pg 182 of Attachment I
C4-P-GAA (INL)45DMurphy Alarm Panel & Bilge Flooding Alarm Systems, Inspect & Calibrate, starting on pg 184 of Attachment I
C4-P-GAA (INL)46DHVAC System, Reactivate, starting on pg 187 of Attachment I
C4-P-GAA (INL)47DBilge Drainage System, Reactivate, starting on pg 195 of Attachment I
C4-P-GAA (INL)48OReverse Osmosis Watermaker, Reactivate (O), starting on pg 198 of Attachment I
C4-P-GAA (INL)49DPotable Water System, Reactivate & Repair, starting on pg 201 of Attachment I
C4-P-GAA (INL)50DFuel Oil Fill, Service and Transfer System, Reactivate, starting on pg 205 of Attachment I
C4-P-GAA (INL)51DSteering Gear, Reactivate, starting on pg 211 of Attachment I
C4-P-GAA (INL)52DElectro-Hydraulic Crane, Reactivate, starting on pg 215 of Attachment I
C4-P-GAA (INL)53DSmall Boat, Reactivate, starting on pg 221 of Attachment I
C4-P-GAA (INL)54DSewage System Reactivate, starting on pg 224 of Attachment I
C4-P-GAA (INL)55DGrey Water System, Reactivate, starting on pg 229 of Attachment I
C4-P-GAA (INL)56OOily Water Separator, Reactivate (O), starting on pg 235 of Attachment I
C4-P-GAA (INL)57DCathodic Protection System, Reactivate, starting on pg 241 of Attachment I
C4-P-GAA (INL)58DGalley Equipment, Reactivate, starting on pg 248 of Attachment I
C4-P-GAA (INL)59DFire Main System, Reactivate, starting on pg 251 of Attachment I
C4-P-GAA (INL)60DShip’s Whistle, Reactivate, starting on pg 255 of Attachment I
C4-P-GAA (INL)61OInspect & Reactivate Vessels Portable Fire Extinguishers, starting on pg 257 of Attachment I
C4-P-GAA (INL)62DSea Trial Performance, Provide Support, starting on pg 261 of Attachment I
C4-P-GAA (INL)62aOSea Trial Performance, Return Transit, starting on pg 261 of Attachment I
C4-P-GAA (INL)63DTemporary Services, Provide, starting on pg 265 of Attachment I
C4-P-GAA (INL)64DTowing Services, Provide (Home Port to Shipyard), starting on pg 268 of Attachment I
C4-P-GAA (INL)64aDTowing Services, Provide Return Tow (Shipyard back to Home Port), starting on pg 268 of Attachment I
C4-P-GAA (INL)65DDrydocking, starting on pg 272 of Attachment I
Labor HoursLabor RateFFP LaborFFP MaterialFFP Total
DDefinite Work Items
OOptional Work Items
Growth Labor Hours EstimateComposite Labor RateGrowth Labor TotalGrowth Material EstimateGrowth Material Overhead RateGrowth Material TotalTotal Estimated Growth Work
Growth Estimate2945.00$255,554.00
Total Evaluated Price
FFP Total+ Total Estimated Growth Work$0.00

&12HSCG23-17-Q-PMF003 &"Arial,Bold"&12Proposal Pricing Schedule for Costa Rica 110' WPB-1346 &12Attachment II

WPB 1346 &"Arial,Bold"&12&P of &N

Lay Days

Lay Days
Offerors Firm Fixed Price per DayEstimated number of Lay DaysTotal Estimated Lay Day Cost
50

COMNAV

Work Item 37Definite (D) Equipment ItemsNAVCOM Suite, Acquire and Make Operational (Equipment)
DescriptionDetailed DescriptionPer Vessel QtyUnit PriceTotal PriceComments
i.Primary Surface Search RadarOne (1) FURUNO ARPA Radar FAR-21x7 series system and one FURUNO XN20AF/6.5 Foot Open Array Antenna.
The FURUNO Far 21x7 series system shall consist of the following individual equipment: 1.) MU190 19 inch Color LCD Monitor, 2.) RPU013H 25kW Processor Unit, 3.) RSB096-079A 24 RPM Gearbox with 25kW Transceiver, 4.) RCU014 Keyboard Control Unit with Trackball & 10 meter cable, 5.) 001-078-410 30 meter Cable, and 6.) FAR-190-BKT MU190 Mounting Bracket.1Primary Surface Search radar system shall be capable of interfacing with the gyrocompass, Differential Global Positioning Systems (DGPS), and Automatic Identification System (AIS)
ii.Automatic Identification System
(AIS)One (1) Class “A” AIS system. System shall consist of a: 1) Class “A” AIS Transponder Unit, 2.) Display Unit, 3.) GPS Antenna, and 4.) VHF Transmit Antenna capable of transmitting at least 12 Watts.1The Automatic Identification System (AIS) shall be capable of interfacing with the Multifunction Display and Primary Surface Search Radar
iii.Multifunction DisplayOne (1) FURUNO TZTL12F1The Multifunction Display shall be equipped with an internal 56 Channel GPS receiver and shall be compatible with the existing Airmar SS505 Transducer. Display shall be capable of displaying GPS and depth information.

The Multifunction display shall also be supplied with all the electronic navigation charts necessary to transit from Baltimore, MD to Costa Rica.

iv. Satellite Communications One (1) FURUNO KU-100 VSAT Communications Solution.

System shall consist of the following individual equipment: 1.) KU-100AT Antenna Unit, 2.) KU-100AC Antenna Control Unit, and 3.) 8D-FB-CV Cable. 1 The Satellite Communication System shall consist of all the necessary equipment to provide the vessel with broadband voice and data communications at sea.

The Costa Rican Coast Guard shall be provided with 2 years of Satellite Service at the time of installation.

Satellite Communications - SupplementSatellite ServiceReference Item iv. Satellite Communications
v.Global Positioning System (GPS)One (1) GARMIN GPSMAP 8012 MFD 12” Chartplotter
One (1) GARMIN brand 4 foot Open Array Radar1The GARMIN 8012 MF 12” Chartplotter shall be supplied with an external 10 Hz GPS/GLOSNASS that updates position and heading 10 times per second.

The GARMIN GPSMAP 8012 MFD 12” Chartplotter shall connect to and interface with a GARMIN brand 4 foot open array radar. The radar shall have a minimum power out of 6kW and max range of at least 48 nautical miles. Radar shall also be equipped with Mini-Automatic Radar Plotting Aid (MARPA) tracking and be capable of tracking up to 10 selected contacts.

GPS - SupplementNavigational chartsReference item v. GPS
vi.High Frequency (HF) RadioOne (1) ICOM M802 HF System. System shall consist of the following individual equipment: 1.) M802 HF Marine Transceiver, 2.) AT-140 Antenna Tuner, and 3.) HF /SSB Antenna capable of transmitting and receiving the HF frequency band (2 to 30 Mhz) at 125 Watts of Transmit Power.1Contractor shall also install a protective enclosure to house the AT-140 Antenna Tuner.
vii.Very High Frequency (VHF) RadioOne (1) ICOM IC-F5061D IDAS Mobile VHF Radio, which shall also include One (1) HS-02774-1 VHF Antenna and ICOM Quicksilver GPS Antenna.
Two (2) ICOM IC-M604 Radios with Two (2) Shakespeare Marina 5225XT VHF antennas.1
viii.Ultra High Frequency (UHF)
RadiosTwo (2) MOTOROLA Astro 25 XTL 2500 P25 Mobile Radio Systems2All UHF radio systems shall include UHF transceivers, trunk mounts, and 800 Mhz antennas.
ix.(Supplement)Additional Material Required for Installation1Includes items such as hardware, software, cabling, connectors, Power Supplies, Routers, Converters, Adapters
Total Equipment Cost (Per Vessel)1$0.00
HSCG23-17-Q-PMF003COM/NAV Equipment List
Per VesselAttachment II

Foreseeable Cost Factors

Number of PersonnelNumber of Days in Period of PerformanceDaily RateSub TotalRemarks
Family Separation Allowance370$8.33$1,749.30$8.33 is the daily rate for FSA as listed on DFAS.mil
Travel and Per Diem370Per Diem rates will be based on the GSA rates for the zip code in which the offeror resides. Offerors shall enter the lodging and meals and expenses rates based on their zip code.
TotalThis Grand total shall be entered into cell B5 on the Grand Total sheet.

HSCG23-17-Q-PMF003 Foreseeable Cost Factors &12Attachment II

Total Evaluated Price

DescriptionPrice
Vessel 1342 (FFP + Estimated Growth)
Vessel 1346 (FFP + Estimated Growth)
Total Estimated Lay Days Cost
Foreseeable Cost Factors
Total Evaluated Price0

&12HSCG23-17-Q-PMF003 &12Grand Total of Proposal Price &12Attachment II

File details come from the government source that posted it. Updated .