Attachment_A_SOW_Amendment_1.docx

DOCX document 36 KB Posted

Attached to
USCG H65 CAAS and AFCS Parts
Solicitation number
HSCG23-16-R-AHH007
Issued by

About this file

Amendment 1 - SOW

View the file

Other files

File Type Posted
Approved_JA_Redacted.pdf PDF
HSCG23-16-R-AHH007_RFP_Package.pdf PDF
Approved_JA_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG23-16-R-AHH007 | Attachment A | Amendment 1 CAAS and AFCS Components SOW

MH-65E CAAS and AFCS Component Purchases (Multiple) STATEMENT OF WORK (SOW)

1.0 General

1.1 Scope. A requirement exists for the United States Coast Guard (USCG) to purchase aircraft parts (production and spares) to produce and sustain its fleet of 98 MH-65E Short Range Recovery (SRR) helicopters. The parts required are Common Avionics Architecture System (CAAS) components, VOR/ARN-147 navigation radios and Automatic Flight Control System servos. The contractor shall manufacture and deliver the required quantities of the components listed in Section 6 of this document consisting of commercial hardware to meet the requirements of this contract. Integrated logistical support service and engineering support services are to be provided under the current Performance Based Logistics (PBL) contract.

1.2 Background. The Discrete Segment 6 (DS6), phase of the H-65 Conversion/Sustainment Program (approved on August 14, 2009) authorizes the installation of the CAAS to overcome obsolescence of current parts and allow integration into future FAA airspace requirements for the MH-65. The legacy Automatic Flight Control System (AFCS) is undergoing reliability, maintainability and availability upgrades under a separate contracting effort to support the continued service of the MH-65 per the APB. The upgraded helicopter will be designated as the MH-65E.

1.3 Roles and Responsibilities.

1.3.1 USCG Aviation Logistics Center (ALC), Elizabeth City NC. The ALC H-65 Product Line will serve as the primary airframe/system integrator for the DS6 components. ALC is the Government airworthiness authority for the H-65 Avionics System Development. The components will be received and installed by the USCG at the ALC during MH-65E modifications in a Planned Depot Maintenance (PDM) cycle.

1.3.2 Rockwell Collins Incorporated (RCI). RCI currently serves as the avionics integrator for DS6 and the principle design authority for the CAAS Design. RCI will support CAAS integration and continued AFCS system integration for the MH-65E at the System Integration Laboratory (SIL) in Cedar Rapids, IA.

1.3.3 Component Supplier. The component supplier will provide the required components, interface control, software and support for the component integration with CAAS and warranty services for the full period of this contract.

2.0 Applicable Documents. The following documents are incorporated by reference into this SOW and are key guidance to be used by the contractor to assist in the administration of this contract. They will be provided upon request:

CGTO 1H-65C-1 - H-65 Aircraft Flight Manual CGTO 1H-65-2-1 - H-65 Maintenance Manual CGTO 1H-65-2-2 - H-65 Wiring Manual CGTO 1H-65-2-3 - H-65 Avionics Maintenance Manual CGTO 1H-65A-3 - H-65 Structural Repair Manual COMDTINST M3710.1 (Series) - USCG Air Operations Manual

The following documents are incorporated by reference into this SOW and are available commercially to assist the contractor in the administration of this contract. They will be provided upon request:

RTCA DO-160 Environmental Conditions and Test Procedures for Airborne Equipment RTCA DO-178 Software Considerations in Airborne Systems and Equipment Certification

2.1 Document Precedence. In the event of a conflict or ambiguity, the following order of precedence among documents shall govern:

1. USCG specifications and procedures

2. FAA documents

3. OEM specifications and procedures

4. Applicable commercial documents

3.0 Airworthiness Certification. The contractor shall maintain OEM and FAA certifications for the repair of all components for the Period of Performance (POP) prescribed herein. The contractor shall immediately notify the Contracting Officer of the loss of either certification should such loss occur. The Contractor shall immediately take actions to reestablish the certification(s), inform the Contracting Officer of the actions the Contractor intends to take and a timeline for such actions, and the contractor shall inform the Contracting office when certifications are in place. The contractor shall ensure software versions are noted distinctly on all repair documents, inventory management documents and any reports required by the SOW.

3.1 Component purchases. The contractor shall provide purchased components. and technical documentation for reference components.

3.2 Modifications to COTS. The contractor shall use COTS software and hardware to the maximum extent possible to meet requirements. The Contractor shall immediately notify the Contracting Officer if the Contractor is unable to use COTS software and hardware.

3.3 Program security

3.3.1 Protection of Information. Contractor access to proprietary information may be required under this contract. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with the law and government policy and regulation. Contractor access to proprietary information is required under this contract. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with DHS MD 11042.1, Safeguarding Sensitive But Unclassified (SBU) Information. SBU includes information categorized by DHS or other government agencies as: For Official Use Only (FOUO); Official Use Only (OUO); Sensitive Homeland Security Information (SHSI); Limited Official Use (LOU); Law Enforcement Sensitive (LES); Safeguarding Information (SGI); Unclassified Controlled Nuclear Information (UCNI); and any other identifier used by other government agencies to categorize information as sensitive but unclassified. The contractor shall ensure that all contractor personnel having access to business or procurement sensitive information sign a non-disclosure agreement (DHS Form 11000-6). In addition, in accordance with FAR 9.505-4(b), the Contractor shall be required to execute a non-disclosure agreement with other Contractors.

3.3.1.1 Access. The Contractor shall provide USCG personnel access to relevant technical performance information developed by OEMs. Technical performance information includes information pertaining to flight safety, equipment reliability and delivery performance. Inquiries by USCG technical personnel shall be answered as soon as possible and not later than 24 hours after requested for flight safety issues. Access will be provided to review manufacturer quality assurance and engineering documentation as required to support USCG flight safety investigations.

3.4 Quality Assurance

3.4.1 Inspections and Tests. The USCG reserves the right to review the contractor operation and/or facilities at any time during the period of the contract.

3.4.2 Testing of Repaired Components. The contractor shall make available to the Government all acceptance test results discrepancy reports with corrective actions taken for each component if requested.

3.4.3 Final Inspection and Acceptance. Final inspection and acceptance of material under this contract shall be performed at destination (ALC) by local receiving personnel and will consist of count, condition and verification that all required documentation has been provided. ALC considers components Ready for Issue (RFI) upon acceptance. Components determined to be non-RFI upon installation may be returned to the contractor with a Quality Deficiency Report.

3.4.4 Configuration Management Program. The contractor shall have an established Configuration Management Program with control systems in place for the referenced components including configuration identification of each hardware and software configuration item for the contract life. The contractor shall ensure hardware and software version consistency for all installed, repaired and spare systems. The contractor shall not change or modify any component software for the operating system, to include performance enhancement, and/or product improvement, etc. without approval from the USCG. Changes other than Class II will not be made without approval from the Contracting Officer.

3.4.5 Serialization. Serial numbers shall be assigned and permanently attached in accordance with FAA/DoD (MIL- DTL-18307H) approved procedures.

3.4.6 Notification. The contractor shall immediately notify the COR upon identification of any quality issue, failure, or situation that could possibly affect the reliability of the referenced components.

4.0 Warranty Program

4.1 The contractor shall maintain a warranty program plan. The government requires the standard one(1) year warranty.

5.0 Integrated Logistics Support

5.1 Sustainment. Engineering support services and product improvement efforts will be performed during the duration of the contract. Long term sustainment efforts following the end of the warranty period will be negotiated in a separate contract action.

5.2 Significant Component History Report (SCHR). The contractor shall ensure the SCHR remains with the corresponding part until returned to the USCG following repair.

5.3 Component Repair Record (CRR). The contractor shall maintain CRR records for the maintenance performed by the contractor on a serial number tracked component. The original copy of the CRR shall remain with the component until returned to the Coast Guard. The contractor shall retain copies of the CRRs for ninety (90) calendar days after the item is shipped back to the Coast Guard.

5.4 Special Tools. The contractor shall include special tools if required for field maintenance or testing with each delivered component. The ratio of special tool sets to components shall be commensurate with their frequency of use. These tools will be owned and maintained by the USCG.

6.0 PERIOD OF PERFORMANCE.

6.1 Performance Schedule. The Government anticipates a (4) four year FFP contract. The period of performance is anticipated to be as follows:

BASE YEAR: Award – 12 months.

OPTION YEAR 1: 12 months after expiration of Base Period

OPTION YEAR 2: 12 months after expiration of Option Year 1

OPTION YEAR 3: 12 months after expiration of Option Year 2

Actual dates will be determined based on award date. The contract term, including the exercise of all options, may not extend beyond (4) four years.

7.0 SPECIAL INSTRUCTIONS.

7.1 Service Bulletins. The contractor shall modify components as necessary as specified in the latest version of current OEM service bulletins. The contractor shall comply with mandatory and recommended service bulletins.

7.2 Optional Service Bulletins The contractor will be notified via contract modification of the USCG’s desire to incorporate optional service bulletins. If additional funds will be required to incorporate optional service bulletins, the contractor shall advise the COR. The COR will forward his/her recommendation to the Contracting Officer. For service bulletins that require additional funds, the contractor shall submit a detailed proposal within 30 working days following receipt of notice from the Contracting Officer. This proposal shall include a list of required parts and associated prices based on contractor's current commercial catalog minus the best commercial discount or best commercial price (whichever results in the lower price to the Government). This proposal shall also address the turnaround time needed to effect the modification and the total number of labor hours required. The labor rate will be as specified at a line item and corresponding optional line items. Additional labor charges will not apply for incorporation of service bulletins if they do not result in any “over-and-above” contractor shop labor. The contractor shall not incorporate optional service bulletins prior to written notification from the Contracting Officer.

File details come from the government source that posted it. Updated .