This document contains an evaluation factors section and a federal contract opportunity notice. The evaluation factors section outlines the criteria by which proposals will be evaluated for a test support contract, including four mission capability subfactors and factors for information management and control plans, organizational conflict of interest management plans, and cost/price. Offerors will be evaluated on mission capability subfactors for test planning and execution, test infrastructure management, test program support, and human capital management. Information management and control plans and organizational conflict of interest management plans will be rated as acceptable or unacceptable. Cost/price will be evaluated for reasonableness, realism, and affordability.
The federal contract opportunity notice provides details for a test support contract opportunity. The solicitation number is HQ0858-21-R-0012 and it is a 100% small business set-aside for research and development test support services. The NAICS code is 541715 and small business size standard is 1,250 employees. The contract type will be cost-plus-fixed-fee for a base period of four years, one two-year option, and one six-month option. Places of performance are located in Albuquerque, NM; Bedford, MA; Colorado Springs, CO; Dahlgren, VA; Honolulu, HI; Huntsville, AL; Kauai, HI; Kwajalein Atoll; and Vandenberg AFB, CA. The pre-solicitation notice states that the RFP will be posted to SAM.gov approximately 60 days from the date of the notice and proposals will be due 30 days after RFP posting.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved for Public Release
20-MDA-10626 (19 Nov 20)
HQ0858-21-R-0012
TEAMS-Next
Test Support
Section M
Evaluation Factors for Award
November 20, 2020
1.0 INTRODUCTION
2.0 BASIS FOR AWARD
3.0 EVALUATION FACTORS AND RATING METHODOLOGY/DEFINITIONS
4.0 FACTOR 1: MISSION CAPABILITY
5.0 FACTOR 2: IMCP
6.0 FACTOR 3: OCI MANAGEMENT PLAN
7.0 FACTOR 4: COST AND PRICE
SECTION M: EVALUATION FACTORS FOR AWARD
The Government intends to award a contract resulting from this solicitation to the responsible
Offeror whose offer, conforming to the solicitation, will be most advantageous to the
Government, price and other factors considered.
This attachment will be removed upon award of the contract.
1.0 INTRODUCTION
The Government will evaluate the Offerors’ proposals in accordance with the criteria specified in this section. The Government intends to award without discussions. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms for each factor/subfactor. The
Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). The Government reserves the right to make an award or no award.
2.0 BASIS FOR AWARD
2.1 Best Value Tradeoff
This is a best-value tradeoff, competitive source selection conducted in accordance with the
Federal Acquisition Regulation (FAR) subpart 15.3, as supplemented by the Defense FAR
Supplement (DFARS) subpart 215.3, Department of Defense (DoD) Source Selection
Procedures, and MDA Manual 5013.06-M, Source Selection Procedures. As a condition for award, the Offeror must be deemed responsible in accordance with FAR 9.1; have an approved
Top Secret facility security clearance (FCL) in place prior to award; meet the requirements of the solicitation; conform to the required terms and conditions; and include all required certifications.
The Government intends to award one contract as a result of this solicitation. Offerors shall submit one proposal. The proposal shall be, discretely priced, and fully compliant with all stated terms, conditions, and performance requirements set forth in this solicitation. Page limits and all other proposal preparation instructions in this RFP apply to the proposal. Contingent proposals are not allowed, nor will they be accepted, considered or evaluated by the Government.
Contingent proposals are defined herein as proposals that include terms or conditions that imply that performance is contingent upon any sort of provisioning from the Government that is not set forth in the RFP.
2.2 The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal shall contain the Offeror’s best terms for cost and non-cost factors. When the
Government pursues award without discussions, the Offerors may be given the opportunity in accordance with FAR 15.306 to clarify certain aspects of their proposals (e.g., adverse past performance information to which the Offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors. The Government reserves the right to conduct discussions if the Procuring Contracting Officer (PCO) determines them to be necessary.
20-MDA-10626 (19 Nov 20)
The Government may reject any proposal that is evaluated to be unrealistic, including contract terms and conditions, program commitments, unrealistically high or low price, or a proposal that is deemed to reflect an inherent lack of understanding/competence or failure to comprehend the complexity and risks of all stated requirements. Further, the Government may reject any proposal that is incomplete (e.g., missing volume).
2.3 Competitive Range
If discussions are required, a competitive range determination will be utilized in accordance with
FAR 15.306. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted (FAR
15.306(c)(2)), the PCO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
If the PCO determines that an Offeror’s proposal should not be included in the competitive range, the proposal will be eliminated from consideration for award. A written notice of the decision will be provided to the unsuccessful Offeror in accordance with FAR 15.503, whereupon they may request and receive a debriefing in accordance with FAR 15.505 or 15.506.
2.4 Discussions
If discussions are required, they may be conducted either orally or in writing. The scope and extent of the discussions are a matter of PCO judgment as set forth in FAR 15.306. Responses from Offerors may be required within two business days.
Should the Government need to conduct written exchanges with Offerors, they will be in the form of an evaluation notice (EN). The specified format and page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors. The ENs may be sent electronically (i.e., via e-mail) at the discretion of the PCO. The letters forwarding the ENs to the Offerors will request an e-mail response. Offerors must submit responses by the time and date specified in the PCO letter accompanying the ENs.
2.5 Reserved
2.6 The Government will select for award the most advantageous proposal representing the best value to the Government based upon an integrated assessment of Mission Capability and
Cost and Price. Mission Capability includes four (4) subfactors: Test Planning and Execution
(MCS1), Test Infrastructure Management (MCS2), Test Program Support (MCS3), and Human
Capital Management (MCS4). Test Planning and Execution and Test Infrastructure Management are weighted equally and are more important than Test Program Support and Human Capital
Management, which are also weighted equally.
At the factor level, Mission Capability is significantly more important than Cost and Price. Cost and Price will not be scored, but will be evaluated for reasonableness and realism, and will be considered as part of the integrated assessment of best value. The Information Management and
Control Plan (IMCP) factor and Organizational Conflict of Interest (OCI) Management Plan
20-MDA-10626 (19 Nov 20) factor will be evaluated as either Acceptable or Unacceptable. Any proposal with an
Unacceptable IMCP or OCI Management Plan factor rating is not eligible for award.
2.7 Award may be made to a higher rated, higher priced Offeror where the Source Selection
Authority (SSA) reasonably determines that the mission capability of the higher priced Offeror outweighs the price differential. The selection decision will document tradeoffs between
Mission Capability and Cost and Price for offers with an “Acceptable” rating for IMCP and OCI
Management Plan.
2.8 Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors and subfactors to be eligible for award. Failure to comply with the terms and conditions of the solicitation, and instructions contained in Section L, may result in the Offeror being removed from consideration for award; this includes incomplete proposal submission (e.g., missing volumes).
2.9 Contracting Officer’s Responsibility Determination
Prior to awarding a contract, the PCO must perform a responsibility determination for the selected contractor. The standards of contractor responsibility and the requirement for the PCO to make and document a responsibility determination are set forth in FAR 9.104 and 9.105. To be determined responsible, a prospective contractor must:
a) Have adequate financial resources to perform the contract, or the ability to obtain them.
b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments.
c) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history, except as provided in FAR 9.104-2.
d) Have a satisfactory record of integrity and business ethics.
e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety precautions applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors).
f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them
g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
Per FAR 9.504(e), the PCO shall award the contract to the apparent successful Offeror unless a conflict of interest is determined to exist that cannot be avoided or mitigated. The PCO reserves the right to reject proposals from Offerors which do not adequately avoid or mitigate all OCIs or
20-MDA-10626 (19 Nov 20) are inconsistent with the identified Test Support OCI restrictions. If an OCI is not adequately resolved, the PCO reserves the right to notify the Offeror and allow the Offeror a reasonable opportunity to respond before making an award decision. The PCO also reserves the right to obtain an OCI waiver and make an award when in the best interests of the United States. If the likely successful Offeror is rejected due to OCI and the PCO elects to not pursue a waiver, the
Government reserves the right to award to the best value of remaining Offerors that are not rejected due to OCI. Notices to Offerors of OCIs and their responses thereto are not negotiations or discussions as those terms are used in FAR 15.306(d).
To be eligible to receive an award, the Offeror’s proposal must comply with Department of
Defense (DoD) Class Deviation 2020-O0008 to FAR Clause 52.219-14, Limitations on
Subcontracting proposed in Volume II Executive Summary Tab 3.
3.0 EVALUATION FACTORS AND RATING METHODOLOGY/DEFINITIONS
The Government will conduct an in-depth review of each proposal against the factors and subfactors established in the solicitation, and assign evaluations ratings (FAR 15.305). The ratings tables below will be used.
TABLE M-1: Evaluation Factors/Subfactors (Trade-off)
Evaluation Factors
Factor 1: Mission Capability
Mission Capability Subfactor 1 (MCS1): Test Planning and Execution
Mission Capability Subfactor 2 (MCS2): Test Infrastructure Management
Mission Capability Subfactor 3 (MCS3): Test Program Support
Mission Capability Subfactor 4 (MCS4): Human Capital Management
Factor 4: Cost and Price
The Factor 1 Mission Capability subfactors (MCS1, MCS2, MCS3, and MCS4) will be evaluated using the definitions at Table M-2 and the ratings at Table M-3. The combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table M-4 in conjunction with the risk descriptions set forth in Table M-4.
TABLE M-2: Evaluation Definitions
Discriminator Definition
Strength
An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
Deficiency
A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
TABLE M-3: Combined Technical/Risk Rating Method
Color Rating Adjectival Rating Description
Blue Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
20-MDA-10626 (19 Nov 20)
TABLE M-4. Technical Risk Rating Method
Adjectival Rating Description
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
TABLE M-5: Acceptable/Unacceptable Factor
Acceptable/Unacceptable Factors
Factor 2: IMCP
Factor 3: OCI Management Plan
Factor 2 will be evaluated on an “Acceptable/Unacceptable” basis using the ratings at Table M-
6. Factor 3 will be evaluated on an “Acceptable/Unacceptable” basis using the ratings at Table
M-6.
TABLE M-6. Technical Acceptable/Unacceptable Rating Method
Rating Definition
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
4.0 FACTOR 1: MISSION CAPABILITY
The Government will evaluate the Mission Capability approach of each Offeror. The evaluation will focus on compliance with solicitation requirements. Each subfactor within the Mission
Capability factor will receive one of the combined technical/risk color ratings in Table M-3. The combined technical/risk ratings include consideration of risk, in Table M-4, in conjunction with strengths, weaknesses, significant weaknesses, and deficiencies, in Table M-2, in determining technical ratings. The Government will not roll up the Mission Capability subfactor ratings into an overall factor adjectival/color rating.
Evaluation of the Offeror’s Mission Capability subfactors shall be based solely on information furnished by the Offeror. To ensure sufficient information is available, the Offeror must furnish, as part of its proposal, all descriptive material necessary for the Government to determine if the
Offeror’s approach meets the requirements of the solicitation. In a case where an Offeror fails to provide enough information to determine if the proposal meets the requirements of the solicitation, deficiencies, significant weaknesses, or weaknesses may be assessed.
4.1 Subfactor 1 (MCS1): Test Planning and Execution
The Government will evaluate the Offeror’s approach to and understanding of planning and executing flight tests, ground tests, cyber tests, wargames, and exercises in accordance with the
MDS Test Policy and applicable CONOPS (flight test, ground test, cyber test, or exercises and wargames), which may be supported in part through examples of related experiences to accomplish the mission tasks:
MCS1 Element #1: Executing flight tests and/or missile or rocket launches on-console for major
DoD weapon systems. This includes authoring checklists, planning/practicing contingencies, and conducting live operations.
MCS1 Element #2: Planning ground test events for major DoD weapon systems, including developing test architectures, coordinating with internal and external stakeholders, and integrating sub-systems together into one hardware-in-the-loop or distributed test environment.
MCS1 Element #3: Executing developmental and operational cyber tests for major DoD weapon systems, including developing network and system architectures, developing attack vector descriptions and network/hardware topology, and executing cyber tests on operational and operationally representative systems.
20-MDA-10626 (19 Nov 20)
MCS1 Element #4: Implementing and exercising the DoD Joint Event Life Cycle as it relates to
Joint Exercises and Wargames; and supporting the development of secure network architectures to host M&S elements within a distributed Live-Virtual Constructive environment.
MCS1 Element #5: Mission management support for all types of missile defense system tests
(flight, ground, cyber, wargames, and exercises), including supporting test readiness reviews, integrating schedules for developmental and operational systems, and coordinating test activities within a department or agency and with external entities, such as operational test agencies, combatant commands, and the various armed services.
4.2 Subfactor MCS2: Test Infrastructure Management
The Government will evaluate the Offeror’s approach to and understanding of the management/support of ground test labs, test range infrastructure, and test data collection assets, which may be supported in part through examples of related experiences to accomplish the mission tasks:
MCS2 Element #1: Synchronizing ground test hardware-in-loop assets for DoD weapon systems to meet test activity requirements and timelines, including integrating and de-conflicting available hardware and software resources across multiple systems and subsystems.
MCS2 Element #2: Managing, developing, and executing DoD test range infrastructure projects, including construction, sustainment, and modernization of facilities and permanent data collection/flight tracking instrumentation structures.
MCS2 Element #3: Maintaining, sustaining, and modernizing transportable tracking and data collection instrumentation assets that support launch, flight, and intercept of missile defense systems; including assisting with system troubleshooting and failure analysis, development of corrective actions, and evaluating effectiveness of corrective actions to ensure mission readiness.
4.3 Subfactor MCS3: Test Program Support
The Government will evaluate the Offeror’s approach to and understanding of policy, test design/analysis, and training responsibilities associated with a major DoD test program, which may be supported in part through examples of related experiences to accomplish the mission tasks:
MCS3 Element #1: Supporting a comprehensive policy program, including researching, authoring, coordinating, and updating organizational/administrative policies as well as technical policies, including formal CONOPs, Directives, and Instructions.
MCS3 Element #2: Designing and analyzing flight and ground tests for major DoD weapon systems, including integration of test requirements for various programs, analysis of test anomalies, and flight test trajectory and range safety analysis.
20-MDA-10626 (19 Nov 20)
MCS3 Element #3: Administration and management of a training program, to include creating training materials, conducting classroom and on-console mission countdown training, and managing trainee certifications.
4.4 Subfactor MCS4: Human Capital Management
The Government will evaluate the Offeror’s Human Capital Management capability based on its approach to and understanding of the following MCS4 elements:
MCS4 Element #1: Recruit Qualified Personnel. Demonstrating the process for timely recruiting and on-boarding of personnel that meet the qualifications set forth in the SOW labor competencies (SOW 4.3.1.6). Addressing processes and timelines for backfilling billets and approach to quickly increase staffing to support potential new mission areas.
MCS4 Element #2: Retain Qualified Personnel. In concert with the compensation plan portion of the Cost/Price Volume, addressing compensation plan/benefits and other associated incentives to retain qualified personnel.
MCS4 Element #3: Problem Resolution Strategy. Problem resolution strategy addressing customer complaints in the following areas:
a) Unsatisfactory job performance at the employee level (e.g. lack of technical ability)
b) Unsatisfactory systemic performance (e.g. pervasive and continued unsatisfactory performance across an entire function)
c) Personnel misconduct issues (e.g. timecard fraud, computer misuse, behavior/conduct)
5.0 FACTOR 2: IMCP
The Government will evaluate the overall plan(s) of each Offeror as either “Acceptable” or
“Unacceptable”. The Government will evaluate the Offeror’s Information Management and
Control Plan-Services (IMCP) to ensure it demonstrates an approach to, and understanding of, the policies/procedures identified below:
a) Procedures for determining the need to transmit CUI.
b) Internal mechanisms to determine the amount of CUI deemed necessary to transmit.
c) Accountability procedures used to safeguard CUI.
d) Procedures for monitoring subcontractor compliance with DFARS 252.204-7012.
e) Procedures for reporting a cyber-incident as defined in DFARS 252.204-7012.
f) All National Institute of Standards and Technology (NIST) 800-171 r1 families of controls for its own applicable network in its System Security Plans and POAM.
g) Controls identified in the POAM are resolved within one year after contract award, or a reasonable period of time agreed to by the Contracting Officer.
h) Controls in place to enforce flow down of DFARS 252.204-7012 and prime contractor
IMCP procedures to all applicable subcontractors and vendors.
20-MDA-10626 (19 Nov 20)
An IMCP will be determined to be “Acceptable” if the plan demonstrates a sufficient approach to, and understanding of, the policies/procedures identified in paragraphs 5.0 a-h above.
An Offeror that receives an “Unacceptable” rating for the IMCP is not eligible for award.
6.0 FACTOR 3: OCI MANAGEMENT PLAN
The Government will evaluate the Offeror’s approach to the management of OCI in a comprehensive OCI Management Plan. The plan shall describe the approach to OCI management in the following areas:
a) A description of the organizational unit and position(s) responsible for implementing the
Contractor’s OCI Management approach to include responsibility for overall management, oversight, and enforcement.
b) The plan to maintain and self-certify an OCI-compliant environment during performance of the contract by ensuring that the Offeror and subcontractors at all tiers do not support any MDA-funded contract requirements (whether via MDA contracts, or other
Government agency contracts which support MDA).
c) The procedures for detecting, eliminating, and reporting OCIs at any tier, including procedures the Offeror will utilize to ensure its subcontractors at all tiers proactively identify and report conflicts.
d) The procedures for protecting agency information that could lead to an unfair competitive advantage if disclosed; specifically, collecting disclosure agreements covering all individuals, subcontractors, and other entities with access to agency-sensitive information, and physical safeguards.
e) Promulgation of enforcement mechanisms, procedures and training to all employees of the Offeror and subcontractors at all tiers, with emphasis on consequences for non-compliance.
f) Processes for identifying and eliminating potential conflicts associated with the employment of recently separated federal Government employees (military or civilian) that may have had unequal, non-public access to TEAMS or TEAMS-Next information.
An OCI Management Plan will be determined to be “Acceptable” if the plan meets the requirements of the solicitation identified in paragraphs 6.0 a-f above.
An Offeror that receives an “Unacceptable” rating for OCI Management Plan is not eligible for award.
7.0 FACTOR 4: COST AND PRICE
The Cost and Price Factor will not receive a color rating. The Government will evaluate each
Offeror’s price proposal using one or more of the techniques described in FAR 15.404.
Information in the proposal and information from other sources such as DCAA, DCMA may be considered under the Cost and Price Factor. The evaluation will include the three-year base period, one three-year option, Option CLIN 0001 “Emergent Requirements” and the 6 month option to extend services.
7.1 Professional Employee Total Compensation
Prices that are insufficient to cover direct labor costs and benefit costs plus other burdens and fee/profit, is a failure to comply with the provisions in FAR 52.222-46(a) and will result in the proposal being rejected by the PCO in accordance with FAR 52.222-46(d).
7.2 Affordability
An affordable proposal does not force the Government to make unacceptable budget tradeoffs.
Any unaffordable proposal, including an otherwise superior proposal, may be eliminated from consideration for contract award by the SSA.
7.3 Reasonableness
Since the Government anticipates adequate price competition, the Government will verify price reasonableness by comparison of competitively proposed prices. Therefore, Offerors are not required to submit certified cost or pricing data. If, after receipt of proposals, the PCO determines that adequate price competition does not exist, the Government may require certified cost or pricing data in accordance with DFARS 252.215-7008.
7.4 Cost Realism
Cost realism analysis is the process of independently reviewing and evaluating specific elements of each Offeror’s proposed cost estimate to determine whether the estimated proposed cost elements are realistic for the work to be performed and reflect a clear understanding of the requirements.
For CPFF LOE CLINs, the result of cost realism analysis is the probable cost. The probable cost may differ from the proposed cost and will reflect the Government’s best estimate of the cost that is most likely to result from the Offeror’s proposal. Probable cost will be used to determine the best value. The Government’s probable cost will result from adjustments to the proposed cost to realistic levels based on a cost realism analysis of the proposed direct and indirect rates.
7.5 Cost and Price Factor Evaluation Results
The SSEB will provide the following results of its analysis of the cost/price factor to the SSA for consideration in making the best value decision:
a) Any qualitative cost issues
b) The total evaluated price for the total contract effort. The total evaluated price will consist of the sum of the following:
1. The probable cost of all CPFF LOE CLINs plus the proposed fixed fee amounts (to include options).
2. The travel and ODC CLINs at the Government provided amount.
20-MDA-10626 (19 Nov 20)
3. The amount of any additional costs to the Government necessary to support the
Offeror’s unique approach.