PWS_15-5E3_C1.pdf

PDF 14 KB Posted

Attached to
Cooperative Support Services
Solicitation number
HQ0727-15-R-0016
Issued by

About this file

Performance Work Statement (PWS)

View the file

Other files

File Type Posted
HQ0727-15-R-0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Advantest 93000 Maintenance Contract

DMEA 15-5E3

27 May 2015

1.0 SCOPE:

1.1 TITLE: Advantest 93000 Maintenance Contract

1.2 APPLICABILITY: Advantest 93000 LTH (1) Advantest 93000 A-Class (2) identified as:

LTH: S/N DE04601069

ATH1: S/N MY04601877

AHT2: S/N DE04602040

1.3 BACKGROUND: DMEA has a need for calibration and maintenance services for the Advantest functional testers as part of the DMEA Quality Plan.

1.4 PURPOSE: The purpose of this task is to acquire one (1) year plus three (3) option years of system calibration and maintenance support for three (3) Advantest systems.

2.0 REFERENCE GOVERNMENT PROVIDED RESOURCES N/A

2.5 GOVERNMENT FURNISHED FACILITIES/ACCESS:

Facility/Access Date DMEA Facility, 4234 54th St., McClellan, CA 95652-2100 Contract Award

3.0 REQUIREMENTS:

3.1 GENERAL REQUIREMENTS:

3.1.1 RESERVED

3.3 TASK REQUIREMENTS:

3.3.1 CALIBRATION: The contractor shall provide a National Institute of Standards and Technology (NIST)traceable calibration of the Advantest functional tester models: LTH(1) and ATH(2) with one (1) calibration sticker and one (1) calibration certificate upon completion of the service for each system.

3.3.2: System Maintenance Support: The contractor shall provide full system maintenance support when needed during the contract period.

3.3.2 LOCATION: The contractor shall deliver the service /materials to DMEA as needed at the location listed in paragraph 2.5. The period of performance is 12 months with three (3) option years.

3.3.3 INTERVAL: The contractor shall provide National Institute of Standards and Technology (NIST) traceable calibration services every six (6) months as required during the period of performance

3.3.4 SECURITY: The contractor shall provide advance notification prior to conducting any onsite training, inspection, installation or maintenance. A forty-eight (48) hour minimum notice during normal business hours shall be given. All contractor work at DMEA shall be performed by US citizens; after hours and/or weekend work may be required for excepted personnel. Prior to being allowed entry, contractor personnel shall provide proof of citizenship in accordance with the DMEA visitor approval process in effect at the time the visit is requested. During periods of exceptionally heightened security, additional advance notice background investigations of contractor personnel may be required prior to gaining entry into DMEA.

File details come from the government source that posted it. Updated .