MOKV_Industry_Day_Brief.pdf
PDF 474 KB Posted
- Attached to
- AdvancedTechnology Innovation (ATI) Broad Agency Announcement (BAA) Federal contract opportunity
- Solicitation number
- HQ0147-13-ATI-BAA
- Issued by
- DOD Missile Defense Agency
About this file
MOKV Industry Day Brief
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HQ0147-15-C-6007_Award_Annoucement.docx | DOCX document | |
| Industry_Day_General_Session_Attendees_List.pdf | ||
| MOKV_RFI_Questions_and_Answers.pdf | ||
| Gate_9_directions_to_VBIII_Main_Entrance.ppt | PPT presentation | |
| DVM_Attachment_3.docx | DOCX document | |
| MOKV_Industry_Day_1_on_1_Registration_Form.docx | DOCX document | |
| MOKV_Industry_Day_Registration_Form.docx | DOCX document | |
| DVM_Document_Access_Agreement_Form.xlsx | XLSX spreadsheet | |
| MDA_VAR_Process.pdf | ||
| MDA_VAR_Process.pdf | ||
| Registration_Form_Industry_Day_Rev_1.docx | DOCX document | |
| DVL_Attachment_2_final.docx | DOCX document | |
| Registration_Form_Industry_Day_Rev_1.docx | DOCX document | |
| MDA_VAR_Process.pdf | ||
| DVL_Attachment_2_final.docx | DOCX document | |
| HQ0147-14-C-6001_Award_Annoucement.docx | DOCX document | |
| Att_1_ATI_BAA_Supplemental_Information_Request_for_Laser_Component.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Technology
Missile Defense Agency
Advanced Technology (MDA/DV)
Bldg 5224, Martin Rd.
Redstone Arsenal, AL 35898
11 February 2015
Multi-Object Kill Vehicle Industry Day
Approved for Public Release
15-MDA-8162 (11 March 15)
DISTRIBUTION STATEMENT A.
Approved for public release; distribution is unlimited.
Administrative Remarks
• Safety Briefing
• Classified conference – SECRET NOFORN
• No electronic devices permitted in auditorium
- Storage lockers available outside
- Return locker key when retrieving devices
• No storage available for handling classified documents/notes
• Note taking is prohibited when classified information is being discussed
• Discussions will only occur in areas approved for classified discussions up to the SECRET level
• No food or drinks permitted in auditorium
• Restrooms and vending located outside auditorium entrance to the right
Approved for Public Release
15-MDA-8162 (11 March 15)
Today’s Ballistic Missile Defense System
Approved for Public Release 15-MDA-8162 (11 March 15)
• Re-designed unitary GBI kill vehicle – focus on mature technology and component reuse
• High priority on improved cost effectiveness, manufacturability, supportability, testability, and reliability
• On-demand communications for system discrimination data, directed engagements, and hit assessment
• TOM correlation reliability improvements
• Multiple kill vehicles per interceptor
• Engagement management algorithms
• KV-to-KV communications
• Initial inertial measurement unit prototype
• Improved capability to integrate kill vehicle and off-board system discrimination data
CKV Technology Phases
Phase 1 Next buy of GBI xx
Phase 2 Inventory replenishment & commonality
(GBI, SM-3)
GBI – Ground Based Interceptor
SM-3 – Standard Missile -3
KV – Kill Vehicle
RKV – Redesigned KV
SM-3 GBI
GBI
Completed unitary kill vehicle assessment and transitioned to
RKV program Defeat the Evolving Threat
Notional Notional Notional
Contracting Officer Comments
• Points of contact (include in all correspondence)
- Contracting Officer: Duane Keller (Duane.Keller@mda.mil)
- Contract Specialist: Coby Hirschler (Coby.Hirschler@mda.mil)
• All applicable documents (with exception of classified) will be posted on FedBizOpps
- Requests for classified documents should be submitted to Contracting
Officer (see RFI instructions)
• Submit Industry Day questions in writing via e-mail no later than
Friday 13 Feb to the PoCs listed in the RFI
- Unclassified: Duane Keller
- Classified: Robin Tompkins
- Security: Casey Walton
• White papers are due no later than Sunday 1 Mar
• Register at http://www.fedbizopps.gov to receive e-mail notifications
• NOTE: If you hear conflicting guidance, ask a question
Ground Rules for One-on-One Sessions
• Allows companies who are interested in being a prime contractor for this effort an opportunity to discuss aspects of the company's potential solution with respect to the requirements for this program
- One-on-One sessions will be held in VBIII 1-E-201
- Limited to 5 individuals per prime contractor team
• Time limits will be strictly enforced (15 minutes)
- Use time limit to your benefit
- These are not marketing sessions nor an audience for capability briefings
• Please have your teams assembled and ready in VBIII Rocket City
Café (1-E-215) 5 minutes prior to the assigned time
Contract Discussion
• White Paper
• Contract Scope
- Concept Definition (Base Period) – 18 months total
– 16 months delivery of final concept
– 2 months Q&A / Government evaluation
- Prototype Development (Priced Option)
– Option: design, laboratory experimentation, testing, and proof of concept
• Funding
- Number of awards are contingent upon funding availability (multiple awards)
– Estimate total base period program funding of o $24M in FY16 o $30M in FY17
Contract Discussion (Cont’d)
• Organizational Conflict of Interest (OCI) Policy and Disclosure
- MDA’s OCI Policy, dated May 20, 2012, has not changed
- Early disclosure encouraged (PCO – Duane Keller)
• Eligible participants
- U.S. only private industry
- Qualified accredited domestic educational institutions
- Nonprofit organizations
Questions?
MOKV Program Plan
• Concept Definition (Base Period)
- Fully converge and define concept
- Provide comprehensive concept assessment
- Deliver models and sims for independent Government assessment
• Prototype Demonstration (Priced Option)
- Should be mature and detailed enough to demonstrate reduced risk for high risk aspects of the concept
- Component fidelity should be proportional to risk (high risk = high fidelity)
- Includes associated experimentation and testing that
– Demonstrates key critical functions to justify capability assertions
– Shows reduced risk for critical capabilities or key technology
Expectations for
MOKV Final Concept Definition
• Performance based on:
- Expanded threat space parameters, scenarios, and blue force laydowns
- Lethality assessments
- Government independent modeling and assessment
• Concept Design for Producibility, Reliability, Service Life, Testability, Survivability, Deployability
- Ability to leverage GBI, SM-3, and THAAD boosters
- Suitability of concept design for efficient production and reliable employment
- Path to mature technology readiness level for engineering manufacturing and development
• Sustainment (Maintainability and Supportability)
- O&M approach to maintain interceptor fleet availability and reliability
- Suitability of concept design for efficient and affordable employment
• Recurring and Non-Recurring EMD cost estimate
• BMDS integration impacts
- Compatibility with current/planned interceptor and BMDS architectures
• Prototype fidelity and approach
- Capability demonstrated to support model validation
- Extent and level of risk mitigation achieved (technology and performance)
- Schedule to build and test Approved for Public Release 15-MDA-8162 (11 March 15)
White Paper Content
• White Paper compliant with the Advanced Technology Initiative BAA
(HQ0147-13-ATI-BAA)
• Address three main topics
- Describes respondent's Multi-Object Kill Vehicle (MOKV) concept and associated systems engineering to develop, test, and integrate the concept into the BMDS
- Describes respondent's plan to develop and test a proof-of-concept prototype of the proposed concept
- Describes respondent's experience in developing and fielding similar exo-atmospheric systems
White Paper Content – MOKV Concept
• MOKV concept description – includes but not limited to
- Engagement management approach & rationale
- Communications architecture approach & rationale
- Predicted reliability, how its calculated, and how it will be achieved
- Approach and rationale for the ‘ilities, i.e., how and why
• Associated systems engineering
- Identify initial trade studies
- Describe process to identify additional trade studies
- Approach and process to converge to full MOKV concept
- Top level approach and rationale for development testing of the concept
White Paper Content - Proof-of-Concept Prototype Plan
• Address approach to conduct laboratory experimentation and testing
• Include a top level schedule to develop and assemble hardware and conduct testing
• Roadmap of necessary maturation activities per payload module
• Discussion on how technical risk will be reduced, technology readiness will be identified, and critical features will be demonstrated
MOKV CDPP Concept Attributes
• Balance capability against threat with interoperability in future BMDS architectures and schedule goals
- Threat based on 2025+ epoch
- Future BMDS architecture include projected blue force laydown and RKV driven updates
- Schedule goals
– Concept development and definition complete by ~2QFY17
– Proof-of-concept prototype demo(s) complete by 4QFY22
- Proposed changes to BMDS architecture need to be justified
• Implement MDA’s emerging Kill Vehicle Modular Open Architecture
• Leverage existing BMDS boosters
Expected MOKV Benefits
• Same or greater Pes / Pneg with significantly fewer interceptors
• Greatly increased mission assurance & availability
- High reliability (storage, stand-by, and in flight)
- Reduced maintenance needs and shorter cycles
• Upgradable
- Based on modular architecture
- Simpler injection of improved technology or functional capabilities
• Robust to variances in BMDS sensor support
- Leverage ground data as available
- Able to operate autonomously
Questions?
Classified Placeholder
Questions?
Concluding Comments
• White papers due 01 Mar
• Submit Industry Day questions no later than 13 Feb
• Primary Point of Contact is PCO
• Industry Day brief will be included with classified GFI
• One-on-One Sessions (VBIII 1-E-201)
• Retrieve electronic devices and return locker key
File details come from the government source that posted it. Updated .