Highway Safety Improvement Program (HSIP) and Traffic Calming Project.pdf
PDF 839 KB Posted
- Solicitation number
- 2026-003
- Issued by
- Los Angeles County, California
About this file
Summary: Highway Safety Improvement Program (HSIP) and Traffic Calming Project - Contract Documents
This is a comprehensive set of contract documents issued by the City of Artesia, California for the Highway Safety Improvement Program (HSIP) and Traffic Calming Project (Project No. 2026-003). The project encompasses street improvements, traffic calming measures, and safety enhancements including asphalt overlays, sidewalk and curb reconstruction, pavement markings, signal upgrades, roundabout construction, and installation of safety devices such as solar-powered rapid rectangular flashing beacons. The work is organized into three bid schedules: Street Improvements (33 line items including cold mill asphalt, slurry sealing, sidewalk/curb work, and pavement markings), HSIP improvements (12 line items including raised crosswalks and continental striping), and Roundabout construction (7 line items). Sealed bids are due May 1, 2026 at 3:00 PM at City Hall, with public opening and reading of bids following immediately thereafter. Bids must remain valid for 60 calendar days after opening. The contract award is anticipated within 60 days of bid opening and will be made to the lowest responsive, responsible bidder. The successful contractor must execute the contract within 15 days of contract award notification.
Bidders must submit a bid bond, certified check, or cash deposit equal to 10 percent of the total bid amount as security. Upon contract award, the contractor shall provide performance and payment bonds each equal to the contract price. The contractor must maintain workers' compensation insurance ($1,000,000), general liability insurance ($2,000,000 per occurrence/$5,000,000 aggregate), automobile liability insurance ($1,000,000), pollution liability insurance ($1,000,000), and transportation pollution liability insurance ($5,000,000). The contractor must possess a valid California State Contractor's License Class A and must be registered with the Department of Industrial Relations in accordance with prevailing wage requirements; subcontractors must similarly be registered. The contractor shall self-perform at least 50 percent of the work and must submit a detailed list of proposed subcontractors. Liquidated damages accrue at $1,000 per day for work remaining incomplete beyond the project deadline. Five percent of progress payments will be withheld as retention, which may be substituted with approved securities. The project is subject to prevailing wage requirements under California Labor Code Section 1770 et seq., with wage rates available from the Director of Public Works.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i)
CITY OF ARTESIA
City of Artesia 18747 Clarkdale Avenue, Artesia, California 90701
Telephone (562) 865-6262 Fax (562) 865-6240 Public Works: Ernesto Sanchez, esanchez@cityofartesia.us Engineering: Ron Ibarra PE, engineering@cityofartesia.us
City Clerk: Jennifer Alderete, jalderete@cityofartesia.us
CONTRACT DOCUMENTS FOR THE
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)
AND TRAFFIC CALMING PROJECT
PROJECT NO. 2026-003
Bids Due: May 1, 2026 at 3:00 PM mailto:esanchez@cityofartesia.us
(ii)
TABLE OF CONTENTS
NOTICE INVITING BIDS
INSTRUCTIONS TO BIDDERS
CHECK LIST FOR BIDDERS
BID
CONTRACT
PAYMENT BOND
PERFORMANCE BOND
CHECKLIST FOR EXECUTION OF CONSTRUCTION CONTRACT
GENERAL PROVISIONS
STANDARD SPECIFICATIONS AND DRAWINGS
SPECIAL PROVISIONS
TECHNICAL SPECIFICATIONS
NOTICE INVITING BIDS
FOR
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING PROJECT
BID NUMBER: 2026-003
NOTICE IS HEREBY GIVEN that the City of Artesia, California (“City”) invites sealed Bids for the Project. The City will receive such Bids at City Hall, 18747 Clarkdale Avenue, Artesia, California 90701 up to 3:00 p.m. on May 1, 2026, at which time they will be publicly opened and read aloud.
All Bids must be made on the form furnished by the City. Each Bid must be submitted in a sealed package addressed to the City Clerk with the Project name and Project number typed or clearly printed on the lower left corner of the package. Bids must remain valid and shall not be subject to withdrawal for sixty (60) calendar days (“Days”) after the Bid opening date.
INCORPORATION OF STANDARD SPECIFICATIONS
The "Standard Specifications for Public Works Construction" (“Standard Specifications”) latest edition as amended by the Contract Documents, is incorporated into the Contract Documents by reference.
SCOPE OF WORK
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer.
OBTAINING BID DOCUMENTS
Bidders may obtain free copies of the Plans, Specifications and other Contract Documents online by visiting the City of Artesia website at the following link:
https://www.cityofartesia.us/bids.aspx
Potential Bidders may also obtain the Bid Documents by coming person to City Hall at 18747 Clarkdale Avenue, Artesia, CA 90701 during regular business hours.
EMAIL ADDRESS
Bidders shall supply the City with an email address to facilitate transmission of Addenda and other information related to these Contract Documents. Failure to provide such email address may result in late notification. The City does not guarantee that it will provide any information email.
A Bidder shall be responsible for all Addenda regardless of whether Bidder received any such email, and a Bidder shall have no recourse due to not receiving such email.
REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS
https://www.cityofartesia.us/bids.aspx
In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)].
PREVAILING WAGES
In accordance with Labor Code Section 1770 et seq., the Project is a “public work.” The successful Bidder (“Contractor”) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations (“DIR”) regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works, and are available to any interested party upon request. The Contractor shall post a copy of the DIR’s determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR.
BONDS
Each Bid must be accompanied by a cash deposit, cashier’s check, certified check or Bidder’s Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverages, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law.
REQUESTS FOR CLARIFICATION
If you discover any error, omission, ambiguity or conflict in the Project Plans or Specifications and wish to have a clarification, please email your request for clarification to Ron Ibarra at engineering@cityofartesia.us. Request must be received no later than five (5) Days before Bid opening. Requests for clarification received after this date will be disregarded. Please indicate the Project and Project number in your request for clarification.
INSURANCE AND WARRANTY
The Contractor shall provide insurance in accordance with Section 5-4 of the Standard Specifications, as modified by the General Provisions. In addition, the Contractor shall guarantee and warranty all Work against defective workmanship and materials furnished by the Contractor for a period of one (1) year from the date the Work was completed and accepted by the City.
LICENSES
Each Bidder shall possess a valid Class A Contractor’s license issued by the California State Contractors License Board at the time of the Bid submission, unless this Project has any federal funding, in which case the Contractor must possess such a license at the time of the Contract award. The successful Contractor must also possess a current City business license.
mailto:engineering@cityofartesia.us
RETENTION SUBSTITUTION
Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor.
Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor’s expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney.
TRADE NAMES OR EQUALS
Requests to substitute an equivalent item for a brand or trade name item must be made by written request submitted no later than five (5) Days before the Bid submission deadline. Requests received after this time shall not be considered. Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability.
LIQUIDATED DAMAGES
Liquidated damages shall accrue in the amount of $1000 for each Day that Work remains incomplete beyond the Project completion deadline specified in the Contract Documents.
[SIGNATURE PAGE FOLLOWS]
J. Alderete 4/2/26
BIDDING PROCESS
Bidders must satisfy themselves by personal examination of location of the proposed work and by such other means as they may prefer as to the actual conditions and requirements of the work and shall not at any time after submission of the bid dispute, complain, or assert that there was any misunderstanding in regard to the nature or amount of work to be done.
The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest.
By: _____________________________ ___________________________________ Jennifer Alderete, City Clerk Date
INSTRUCTIONS TO BIDDERS
FORM OF BIDS. Bids shall be made on the Bid forms found herein. Bidders shall include all forms and fill in all blank spaces, including inserting “N/A” (for not applicable) where necessary.
The Bid shall be enclosed in a sealed envelope bearing the Bidder’s name and the Project name and identification number as described in the Notice Inviting Bids.
DELIVERY OF BIDS. The Bid shall be delivered by the time and date, and to the place specified in the Notice Inviting Bids. No oral, faxed, emailed, or telephonic Bids or alternatives will be considered. The time of delivery shall be conclusively determined by the time-stamping clock located at the City Clerk’s office. Bidders are solely responsible for ensuring that their Bids are received in proper time, and Bidders assume all risks arising out of their chosen means of delivery.
Any Bid received after the Bid submission deadline shall be returned unopened. Bidders are invited to be present for Bid opening. Accepted Bids shall become the property of the City.
AMENDED BIDS. Unauthorized conditions, limitations or provisos attached to a Bid may cause the Bid to be deemed incomplete and non-responsive.
WITHDRAWAL OF BID. A Bid may be withdrawn without prejudice upon written request by the Bidder filed with the City Clerk before the Bid submission deadline. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date.
BIDDER’S SECURITY. Each Bid shall be accompanied by cash, a certified or cashier’s check payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent (10%) of the amount set forth in the Bid. The cash, check or Bid Bond shall be given as a guarantee that, if selected, the Bidder will execute the Contract in conformity with the Contract Documents and will provide the evidence of insurance and furnish the specified Bonds, within fifteen (15) Days after the date of delivery of the Contract Documents to the Bidder. In case of the Bidder’s refusal or failure to do so, the City may award the Contract to the next lowest responsible bidder, and the cash, check, or Bond (as applicable) of the lowest Bidder shall be forfeited to the City to the extent permitted by law. No Bid Bond will be accepted unless it conforms substantially to the form provided in these Contract Documents.
QUANTITIES APPROXIMATE. Any quantities shown in the Bid form or elsewhere herein shall be considered as approximations listed to serve as a general indication of the amount of Work or materials to be performed or furnished, and as basis for the Bid comparison. The City does not guarantee that the actual amounts required will correspond with those shown. As deemed necessary or convenient, the City may increase or decrease the amount of any item or portion of Work or material to be performed or furnished or omit any such item or portion, in accordance with the Contract Documents.
ADDENDA. The City Engineer may, from time to time, issue Addenda to the Contract Documents. Bidders are responsible for ensuring that they have received any and all Addenda.
Each Bidder is responsible for verifying that it has received all Addenda issued, if any. Bidders must acknowledge receipt of all Addenda, if any, in their Bids. Failure to acknowledge receipt of all Addenda may cause a Bid to be deemed incomplete and non-responsive.
DISCREPANCIES IN BIDS. Each Bidder shall set forth as to each item of Work, in clearly legible words and figures, a unit or line item Bid amount for the item in the respective spaces provided for this purpose.
In case of discrepancy between the unit price and the extended amount set forth for the item, the unit price shall prevail. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or if the unit price is the same amount as the entry in the “extended amount” column, then the amount set forth in the “extended amount” column for the item shall prevail in accordance with the following:
(1) As to lump sum items, the amount set forth in the “extended amount” column shall be the unit price.
(2) As to unit price items, the amount set forth in the “extended amount” column shall be divided by the estimated quantity for the item set forth in the Bid documents, and the price thus obtained shall be the unit price.
In case of discrepancy between words and figures, the words shall prevail.
COMPETENCY OF BIDDERS. In evaluating Bidder responsibility, consideration will be given not only to the financial standing, but also to the general competency of the Bidder for the performance of the Project. Each Bidder shall set forth in the designated area of the Bid form a statement of its experience. No Contract will be executed with a Bidder that is not licensed and registered with the DIR in accordance with State law, and with any applicable specific licensing requirements specified in these Contract Documents. These licensing and registration requirements for Contractors shall also apply to all Subcontractors.
BIDDER’S EXAMINATION OF SITE AND CONTRACT DOCUMENTS. Each Bidder must carefully examine the Project site and the entirety of the Contract Documents. Upon submission of a Bid, it will be conclusively presumed that the Bidder has thoroughly investigated the Work and is satisfied as to the conditions to be encountered and the character, quality, and quantities of Work to be performed and materials to be furnished. Upon Bid submission, it also shall be conclusively presumed that the Bidder is familiar with and agrees to the requirements of the Contract Documents, including all Addenda. No information derived from an inspection of records or investigation will in any way relieve the Contractor from its obligations under the Contract Documents nor entitle the Contractor to any additional compensation. The Contractor shall not make any claim against the City based upon ignorance or misunderstanding of any condition of the Project site or of the requirements set forth in the Contract Documents. No claim for additional compensation will be allowed which is based on a lack of knowledge of the above items. Bidders assume all risks in connection with performance of the Work in accordance with the Contract Documents, regardless of actual conditions encountered, and waive and release the City with respect to any and all claims and liabilities in connection therewith, to the extent permitted by law.
DISQUALIFICATION OF BIDDERS. No Person shall be allowed to make, file or be interested in more than one Bid for the Project, unless alternate Bids are specifically called for. A Person that has submitted a sub-bid to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from making a prime Bid. If there is a reason to believe that collusion exists among the Bidders, all affected Bids will be rejected.
RETURN OF BID SECURITY. The Contractor’s Bid security shall be held until the Contract is executed. Bid security shall be returned to the unsuccessful Bidders within a reasonable time, which in any case shall not exceed sixty (60) Days after the Contractor has signed the Contract.
AWARD OF CONTRACT. The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Contract award, if made, will be to the lowest responsive, responsible Bidder and is anticipated to occur within sixty
(60) Days after the Bid opening. The Contract award may be made after that period if the Contractor has not given the City written notice of the withdrawal of its Bid.
LISTING SUBCONTRACTORS. Each Bidder shall submit a list of the proposed Subcontractors on the Project, as required by the Subletting and Subcontracting Fair Practices Act (Cal. Pub.
Contract Code, § 4100 et seq.). Contractor shall self-perform not less than fifty percent (50%) of the Work, as determined by the percentage of Work to be performed by listed Subcontractors.
EXECUTION OF CONTRACT. The Contractor shall execute the Contract in the form included in these Contract Documents within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Additionally, the Contractor shall also secure all insurance and Bonds as herein specified, and provide copies to the City, within fifteen (15) Days from the date of delivery of the Contract Documents to the Bidder. Failure or refusal to execute the Contract or to conform to any of the stipulated requirements shall be just cause for the annulment of the award and forfeiture of the Bidder’s security. In such event, the City may declare the Bidder’s security forfeited to the extent permitted by law, and the City may award the Contract to the next lowest responsive responsible Bidder or may reject all Bids.
SIGNATURES. The Bidder shall execute all documents requiring signatures and shall cause to be notarized all documents that indicate such a requirement. The Bidder shall provide evidence satisfactory to the City, such as an authenticated resolution of its board of directors or a power of attorney, indicating the capacity of the person(s) signing the Bid to bind the Bidder to the Bid and any Contract arising therefrom. Alternatively, Bids submitted by corporations must be executed as specified in Corporations Code Section 313, and Bids submitted by partnerships must be executed by all partners comprising the partnership.
INSURANCE AND BONDS. The Contractor shall not begin Work until it has given the City evidence of all required insurance coverage (including all additional insured endorsements), a Bond guaranteeing the Contractor’s faithful performance of the Contract, and a Bond securing the payment of claims for labor and materials.
TELEPHONES. Bidders are hereby notified that the City will not provide telephones for their use at the time of Bid submission.
INTERPRETATION OF CONTRACT DOCUMENTS. Any Bidder that is in doubt as to the intended meaning of any part of the Contract Documents, or that finds discrepancies in or omissions from the Contract Documents, may submit to the City Clerk a written request for an interpretation or correction not later than ten (10) Days before the Bid submission deadline.
Requests for clarification received after this date will be disregarded. Please indicate the Project and identification number in the request for clarification. Telephonic requests will not be taken.
Any interpretation or correction of the Contract Documents will be made only by a written Addendum. No oral interpretation of any provision in the Contract Documents shall be binding.
TAXES. Except as may be otherwise specifically provided herein, all sales and/or use taxes assessed by federal, State or local authorities on materials used or furnished by the Contractor in performing the Work shall be paid by the Contractor. The Bidder shall calculate payment for all sales, unemployment, pension and other taxes imposed by federal, state and local law and shall include these payments in computing the Bid.
CHECKLIST FOR BIDDERS
The following information is required of all Bidders at the time of Bid submission:
____ Completed and Signed Bid Cover Form
____ Completed and Signed Bid Sheets
____ Completed, Signed and Notarized Questionnaire
____ Completed References Form
____ Resume of General Construction Superintendent/On-Site Construction Manager
____ Completed Subcontractor Designation Form
____ Completed and Signed Industrial Safety Record Form
____ Completed, Signed and Notarized Bid Bond or Other Security Form
____ Signed and Notarized Non-collusion Declaration Form
____ Completed and Signed Addenda Acknowledgement Form
____ Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder
Failure of the Bidder to provide all required information in a complete and accurate manner may cause the Bid to be considered non-responsive.
BID
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING PROJECT
TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF ARTESIA:
The undersigned, as Bidder, declares that: (1) this Bid is made without collusion with any other person and that the only persons or parties interested as principals are those named herein; (2) the undersigned has carefully examined the Contract Documents (including all Addenda) and the Project site; and (3) the undersigned has investigated and is satisfied as to the conditions to be encountered, the character, quality and quantities of Work to be performed, and the materials to be furnished. Furthermore, the undersigned agrees that submission of this Bid shall be conclusive evidence that such examination and investigation have been made and agrees, in the event the Contract be awarded to it, to execute the Contract with the City of Artesia to perform the Project in accordance with the Contract Documents in the time and manner therein prescribed, and to furnish or provide all materials, labor, tools, equipment, apparatus and other means necessary so to do, except as may otherwise be furnished or provided under the terms of the Contract Documents, for the following stated unit prices or lump-sum price as submitted on the Bid herein.
The undersigned submits as part of this Bid a completed copy of its Industrial Safety Record. This Safety Record includes all construction Work undertaken in California by the undersigned and any partnership, joint venture or corporation that any principal of the undersigned participated in as a principal or owner for the last five (5) calendar years and the current calendar year before the date of Bid submittal. Separate information is being submitted for each such partnership, joint venture, or corporate or individual Bidder. The undersigned may attach any additional information or explanation of data that it would like to be taken into consideration in evaluating the Safety Record. An explanation of the circumstances surrounding any and all fatalities is attached.
Accompanying this Bid is cash, a cashier’s check, a certified check or a Bid Bond in an amount equal to at least ten percent (10%) of the total aggregate Bid price based on the quantities shown and the unit prices quoted. The undersigned further agrees that, should it be awarded the Contract and thereafter fail or refuse to execute the Contract and provide the required evidence of insurance and Bonds within fifteen (15) Days after delivery of the Contract to the undersigned, then the cash, check or Bid Bond shall be forfeited to the City to the extent permitted by law.
The undersigned certifies to have a minimum of three (3) consecutive years of current experience in the type of Work related to the Project and that this experience is in actual operation of the firm with permanent employees performing a part of the Work as distinct from a firm operating entirely by subcontracting all phases of the Work. The undersigned also certifies to be properly licensed by the State as a contractor to perform this type of Work. The undersigned possesses California Contractor’s License:
Number ____________, Class _____, which expires on _______________________.
Bidder’s Name: ___________________________________________________
Signature: ______________________________________ Date: _____________________
Signature: ______________________________________ Date: _____________________
BID SHEETS FOR
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING PROJECT
Bidder’s Name: ____________________________________________________________
To the Honorable Mayor and Members of the City Council:
In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract Documents to the satisfaction and under the direction of the City Engineer, at the following prices:
BID SCHEDULE A: STREET IMPROVEMENTS
ITEM NO. DESCRIPTION UNIT
ESTIMATED
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
1a.
Cold Mill 2” Asphalt Concrete
SF 138,569 $ $
1b.
Construct a minimum 2” AC Overlay (C2 PG 64-10)
TONS 2,051 $ $
2.
Seal Cracks and Install Slurry Seal. Remove all existing Striping, Markers, and Pavement Markings prior to Installation
SF 145,926 $ $
3.
Remove and Reconstruct PCC Sidewalk
SF 1,878 $ $
4.
Remove and Reconstruct PCC Curb Ramp
EA 24 $ $
5.
Remove PCC Sidewalk and Construct PCC Curb Ramp
EA 1 $ $
6.
Remove and Reconstruct PCC Curb and Gutter
LF 187 $ $
7.
Remove and Reconstruct PCC Driveway Pavement
SF 77 $ $
8.
Install 4'x3' Surface Mounted ADA Truncated Domes
EA 15 $ $
9.
Remove Buried Longitudinal Gutter & Construct AC Pavement Section (Match Existing Section)
SF 1,287 $ $
ITEM NO. DESCRIPTION UNIT
ESTIMATED
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
10.
Adjust to Grade Survey Monument
EA 2 $ $
11.
Sawcut 1' from EG and Remove and Dispose of Existing AC Pavement and Base and Install 6” AC over
6” AB
SF 633 $ $
12.
Remove and Reconstruct PCC Curb and Gutter with Variable Curb Height to Match Existing Curb Ramp
LF 80 $ $
13.
Remove Existing Tree and Install New
EA 1 $ $
14.
Install Solar Single Lightpost with Foundation
EA 1 $ $
15.
Remove and Reconstruct PCC Longitudinal Gutter
SF 125 $ $
16. Adjust Manhole to Grade EA 14 $ $
17.
Adjust Water/Gas Valve and Cover to Grade
EA 35 $ $
18.
Replace Traffic Signal Loops with Type E Loop Detector
EA 8 $ $
19.
Paint Centerline Striping A202A Detail 2
LF 6,567 $ $
20.
Paint "STOP, XING or PED" Pavement Marking
EA 6 $ $
21. Paint 12" White Stop Bar LF 88 $ $
22.
Paint 6" yellow continuous centerline striping
LF 622 $ $
23. Paint No Parking Striping SF 1,339 $ $
24.
Paint no passing zones A20A Detail 21
LF 418 $ $
25. Paint Curb Red LF 435 $ $
26. Paint 6" White Edge Line LF 4,701 $ $
27.
Install Blue Pavement Markers
EA 18 $ $
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
28.
Paint or Repaint Basic Crosswalk
LF 489 $ $
29.
Paint Yield Pavement Marking (Per Triangle)
EA 9 $ $
30. Repaint House Numbers EA 22 $ $
31.
Install W11-2 with Arrow Sign and Post
EA 2 $ $
32. Mobilization LS 1 $ $
33. Traffic Control LS 1 $ $
TOTAL BID SCHEDULE A: $___________________
BID SCHEDULE B: HSIP
ESTIMATED
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
1.
Install Solar Powered RRFB with W11-2 with Arrow Sign on Post
EA 4 $ $
2.
Construct Raised Crosswalk at Grayland (Construction Note 18 on Sheet C-9)
LS 1 $ $
3.
Paint Continental Crosswalk
LF 3,639 $ $
4.
Paint "STOP, XING or PED" Pavement Marking
EA 27 $ $
5. Paint 12" White Stop Bar LF 404 $ $
6. Paint Curb Red LF 2,135 $ $
7.
Paint or Repaint Basic Crosswalk
LF 441 $ $
8.
Paint Yield Pavement Marking (Per Triangle)
EA 10 $ $
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
9.
Repaint Striping at 183rd Street After Pavement Overlay
LS 1 $ $
10.
Paint Raised Crosswalk Striping, 12” Wide White Stripe
LF 26 $ $
11. Mobilization LS 1 $ $
12. Traffic Control LS 1 $ $
TOTAL BID SCHEDULE B: $___________________
BID SCHEDULE C: ROUNDABOUT
ESTIMATED
QUANTITY
UNIT
PRICES
EXTENDED
AMOUNT
1.
Remove Asphalt Pavement and Construct Roundabout
SF 630 $ $
2.
Install Roundabout Sign and Post
EA 8 $ $
3.
Install 6"X12" Right Arrow Sign and Post
EA 8 $ $
4.
Paint Yield Pavement Marking (Per Triangle)
EA 22 $ $
5.
Remove STOP Sign on Existing Post and Install New YIELD Sign
EA 4 $ $
6. Mobilization LS 1 $ $
7. Traffic Control LS 1 $ $
TOTAL BID SCHEDULE C: $___________________
Note: Items may be adjusted or deleted. Any changes to the quantities for these items shall not constitute a substantial change as referenced in Section 2-6 of the Standard Specifications.
Therefore, regardless of total actual volume (percentage) compared to estimated quantities, the unit prices provided above by the Bidder shall be applied to the final quantity when payment is calculated for these items. No adjustment in the unit prices will be allowed. The City reserves the right to not use any of the estimated quantities, and if this right is exercised, the Contractor will not be entitled to any additional compensation. Cost of all export of material shall be included in the above unit costs; no additional compensation will be granted for such expenses.
TOTAL BID PRICE = BID SCHEDULE A + B + C
TOTAL BID PRICE IN DIGITS: $____________________
TOTAL BID PRICE IN WORDS: _________________________________________________
Signature: __________________________________ Title: ___________ Date: ______
Signature: __________________________________ Title: ___________ Date: ______
INFORMATION REQUIRED OF BIDDER
Fill out all of the following information. Attach additional sheets if necessary.
(1) Bidder’s Name:
(2) If the Bidder’s name is a fictitious name, who or what is the full name of the registered owner? If the Bidder’s name is not a fictitious name, write “N/A” in the response to this question. If you are doing business under a fictitious name, provide a copy of the filed valid Fictitious Business Name Statement.
(3) Business Address:
(4) Telephone: Facsimile:
(5) Type of firm - Individual, Partnership, LLC or Corporation:
(6) Corporation organized under the laws of the State of:
(7) California State Contractor’s License Number and Class:
Original Date Issued: Expiration Date:
(8) DIR Contractor Registration Number:
(9) List the name and title of the person(s) who inspected the Project site for your firm:
(10) List the name and title of the person(s) who attended the mandatory pre-Bid meeting for your firm, including the mandatory site visit,(if any):
(11) Number of years experience the company has as a contractor in construction work:
(12) List the names, titles, addresses and telephone numbers of all individuals, firm members, partners, joint venturers, and company or corporate officers having a principal interest in this Bid:
(13) List all current and prior D.B.A.’s, aliases, and fictitious business names for any principal having interest in this Bid:
(14) List the dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this Bid:
(15) For all arbitrations, lawsuits, settlements and the like (in or out of court) that the company or any principal having an interest in this Bid has been involved with in the past five (5) years:
a. List the names, addresses and telephone numbers of contact persons for the parties:
b. Briefly summarize the parties’ claims and defenses:
c. State the tribunal (e.g., Superior Court, American Arbitration Association, etc.), the matter number, and the outcome:
(16) Has the company or any principal having an interest in this Bid ever had a contract terminated by the owner or agency? If yes, explain.
(17) Has the company or any principal having an interest in this Bid ever failed to complete a project? If yes, explain.
(18) Has the company or any principal having an interest in this Bid ever been terminated for cause, even if it was converted to a “termination of convenience”? If yes, explain.
(19) For projects that the company or any principal having an interest in this Bid has been involved with in the last five (5) years, did you have any claims or actions:
a. By you against the owner? Circle one: Yes No
b. By the owner against you? Circle one: Yes No
c. By any outside agency or individual for labor compliance? Circle one: Yes No
d. By Subcontractors? Circle one: Yes No
e. Are any of these claims or actions unresolved or outstanding? Circle one: Yes No
If your answer is “yes” to any part or parts of this question, explain.
(20) List the last three (3) projects you have worked on or are currently working on for the City of Artesia:
Upon request of the City, the Bidder shall furnish evidence showing a notarized financial statement, financial data, construction experience, or other additional information.
Failure to provide truthful answers to the questions above or in the following References Form may result in the Bid being deemed non-responsive.
The Bidder certifies under penalty of perjury under the laws of the State of California that the information provided above is true and correct.
Notary Public
Subscribed and sworn to me
Signature:
This day of , 20
Title:
(SEAL)
Company
Date:
Date:
REFERENCES FORM
For all public agency projects in excess of $15,000 that you are currently working on or have worked on in the past two (2) years, provide the following information:
Project 1 Name/ Number
Project Description
Approximate Construction Dates From: ______________ To:
Agency Name:
Contact Person: Telephone:
Address:
Original Contract Amount: $ Final Contract Amount: $
If final amount is different from original amount, please explain (change orders, extra work, etc.).
Did you or any Subcontractor file any claims against the Agency?
Circle one: Yes No
Did the Agency file any claims against you?
Circle one: Yes No
If you answered yes to either of the above two questions, please explain and indicate outcome of claims.
Project 2 Name/ Number
Project Description
Approximate Construction Dates From: _______________ To:
Agency Name:
Contact Person: Telephone:
Address:
Did the Agency file any claims against you?
Circle one: Yes No
Project 3 Name/ Number
Approximate Construction Dates From: _______________ To:
Agency Name:
Contact Person: Telephone:
Address:
Did the Agency file any claims against you?
Project 4 Name/ Number
Approximate Construction Dates From: _______________ To:
Agency Name:
Contact Person: Telephone:
Address:
Did the Agency file any claims against you?
Circle one: Yes No
Project 5 Name/ Number
Approximate Construction Dates From: _______________ To: ______________
Agency Name:
Contact Person: Telephone:
Address:
Did the Agency file any claims against you?
Circle one: Yes No
Project 6 Name/ Number
Approximate Construction Dates: From: _______________ To:
Agency Name:
Contact Person: Telephone:
Address:
Did the Agency file any claims against you?
Circle one: Yes No
RESUME
Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Project.
DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104]
List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California, who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways (including bridges), in excess of one-half percent (0.5%) of the Contractor’s total Bid or $10,000, whichever is greater.
If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.
Name under which
Subcontractor is Licensed and Registered
CSLB
License
Number(s) and
Class(es)
DIR
Contractor
Registration Number
Address and Phone
Number
Type of Work (e.g., Electrical)
Percentage of Total Bid (e.g., 10%)1
1 The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public Contract Code Section 4104(b).
CONTRACTOR’S INDUSTRIAL SAFETY RECORD
Bidder’s Name: _________________________________________________________
Current Year of Record
2024 2023 2022 2021 2020 Total
Number of contracts
Total dollar amount of contracts (in thousands of dollars)
Number of fatalities
Number of lost workday cases
Number of lost workday cases involving permanent transfer to another job or termination of employment
The above information was compiled from the records that are available to me at this time and I declare under penalty of perjury under the laws of the State of California that the information is true and accurate within the limitations of those records.
Signature: Signature:
Title: Title:
Date: Date:
Bond No. __________
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that:
WHEREAS the City of Artesia (“City”), has issued an invitation for Bids for the Work described as follows:
“HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING
PROJECT”
WHEREAS
(Name and address of Bidder)
(“Principal”), desires to submit a Bid to City for the Work.
WHEREAS, Bidders are required to furnish a form of Bidder’s security with their Bids.
NOW, THEREFORE, we, the undersigned Principal, and
(Name and address of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto the City in the penal sum of
Dollars ($ ), being not less than ten percent (10%) of the total Bid price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal is awarded the Contract for the Work by the City and, within the time and in the manner required by the bidding specifications, enters into the written form of Contract included with the bidding specifications, furnishes the required Bonds (one to guarantee faithful performance and the other to guarantee payment for labor and materials), and furnishes the required insurance coverage, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
In case suit is brought upon this instrument, Surety further agrees to pay all court costs incurred by the City in the suit and reasonable attorneys’ fees in an amount fixed by the court. Surety hereby waives the provisions of Civil Code Section 2845.
IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Dated:
“Principal”
By:
Its:
Its: ______________________________
“Surety”
Its:
Its: ______________________________
Note: This Bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.
ADDENDA ACKNOWLEDGMENT FORM
Bidder’s Name: ____________________________________
The Bidder shall signify receipt of all Addenda here, if any:
Addendum Number Date Received Signature
If there are more Addenda than there is room in the chart above, attach another page acknowledging receipt of the Addenda.
CONTRACT
CITY OF ARTESIA CONTRACT FOR
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING
PROJECT
THIS CONTRACT (“Contract”) is made and entered this ________ day of _____________, 2026 (“Effective Date”), by and between the CITY OF ARTESIA, a California municipal corporation (“City”) and ____________________________, a [Legal Form of Entity and state of formation, e.g., California corporation, limited partnership, limited liability company] (“Contractor”).
Contractor’s California State Contractor’s license number is ______________. Contractor’s DIR registration number is ______________.
In consideration of the mutual covenants hereinafter set forth, the parties hereto agree as follows:
1. Contract Documents. The Contract Documents consist of this Contract, the Notice Inviting Bids, Instructions to Bidders, Bid (including documentation accompanying the Bid and any post- Bid documentation submitted before the Notice of Award), the Bonds, permits from regulatory agencies with jurisdiction, General Provisions, Special Provisions, Plans, Standard Plans, Standard Specifications, Reference Specifications, Addenda, Change Orders, and Supplemental Agreements. The Contract Documents are attached hereto and incorporated herein by reference.
In the event of any conflict between the terms of this Contract and any incorporated documents, the terms of this Contract shall control.
2. Scope of Services. Contractor shall perform the Work in a good and workmanlike manner for the project identified as “HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING PROJECT” (“Project”), as described in this Contract and in the Contract Documents.
3. Compensation. In consideration of the services rendered hereunder, City shall pay Contractor an amount not to exceed ________________________ dollars ($____________) in accordance with the prices as submitted in the Bid, attached hereto as Exhibit “A” and incorporated herein by this reference. Unforeseen work will be classified as Extra Work when the City Engineer determines that it is not covered by the scope of work in the Contract or any approved Change Orders. The City Manager is authorized to approve payment for Extra Work upon the recommendation of the City Engineer, provided that the total arithmetic dollar value of the Extra Work does not exceed fifteen percent (15%) of the contract price.
4. Incorporation by Reference. All of the following documents are attached hereto and incorporated herein by this reference: Workers’ Compensation Certificate of Insurance, Additional Insured Endorsement (Comprehensive General Liability), Additional Insured Endorsement (Automobile Liability), and Additional Insured Endorsement (Excess Liability).
5. Antitrust Claims. In entering into this Contract, Contractor offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Cal. Bus. & Prof. Code, § 16700 et seq.)
arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time City tenders final payment to Contractor without further acknowledgment by the parties.
6. Prevailing Wages. City and Contractor acknowledge that the Project is a public work to which prevailing wages apply. The provisions of Section 5-3 of the General Provisions shall apply and are mandatory for this Project.
7. Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, by signing this Contract, the Contractor certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.”
8. Trenches and Other Excavations. If this Project involves the digging trenches or other excavations that will extend deeper than four (4) feet below the surface, Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) subsurface or latent physical conditions at the site differing from those indicated by information about the site made available to proposers prior to the deadline for submitting proposals; and (3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Contract.
9. Titles. The titles used in this Contract are for convenience only and shall in no way define, limit or describe the scope or intent of this Contract or any part of it.
10. Authority. Any person executing this Contract on behalf of Contractor warrants and represents that he or she has the authority to execute this Contract on behalf of Contractor and has the authority to bind Contractor to the performance of its obligations hereunder.
11. Entire Agreement. This Contract, including the Contract Documents and any other documents incorporated herein by specific reference, represents the entire and integrated agreement between City and Contractor. This Contract supersedes all prior oral or written negotiations, representations or agreements. This Contract may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties that expressly refers to this Contract.
12. Counterparts. This Contract may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes.
IN WITNESS WHEREOF, the parties hereto have executed the Contract the day and year first above written.
City Manager
ATTEST: APPROVED AS TO FORM:
By: By:
City Clerk City Attorney
(“CONTRACTOR”)
By:
Printed Name:
Printed Name:
Exhibit A Contractor’s Proposal
PAYMENT BOND
(LABOR AND MATERIALS)
KNOW ALL PERSONS BY THESE PRESENTS that:
WHEREAS the City of Artesia (“City”), State of California, has awarded to (“Principal”)
(Name and address of Contractor) a contract (the “Contract”) for the Work described as follows:
“HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING
PROJECT”
(Project name)
WHEREAS, under the terms of the Contract, the Principal is required before entering upon the performance of the Work, to file a good and sufficient payment Bond with the City to secure the claims to which reference is made in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code.
held and firmly bound unto the City and all contractors, subcontractors, laborers, material suppliers, and other persons employed in the performance of the Contract and referred to in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code in the penal sum of
Dollars ($ ), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this Work or labor, that the Surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this Bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by City in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this Bond.
Upon expiration of the time within which the California Labor Commissioner may serve a civil wage and penalty assessment against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1741, and upon expiration of the time within which a joint labor management committee may commence an action against the principal, any of its subcontractors, or both the principal and its subcontractors pursuant to Labor Code Section 1771.2, if the condition of this Bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The Surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or the Specifications accompanying the same shall in any manner affect its obligations on this Bond, and it does hereby waive notice of any such change, extension, alteration or addition.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Its
(Seal)
APPROVED AS TO FORM:
City Attorney
Note: This Bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. DATE OF BOND MUST NOT BE
BEFORE DATE OF CONTRACT. IF CONTRACTOR IS A PARTNERSHIP, ALL PARTNERS MUST
EXECUTE BOND. DATE OF BOND MUST NOT BE PRIOR TO DATE OF CONTRACT. Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the State where the project is located.
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that:
WHEREAS the City of Artesia (“City”), State of California, has awarded to (“Principal”)
(Name and address of Contractor) a contract (the “Contract”) for the Work described as follows:
“HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) AND TRAFFIC CALMING
PROJECT”
(Project name)
WHEREAS, Principal is required under the terms of the Contract to furnish a Bond for the faithful performance of the Contract.
held and firmly bound unto the City in the penal sum of Dollars
($ ), this amount being not less than the total Contract Price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors executors and administrators, jointly…