STATEMENT OF WORK

Fill Two 500-Gallon High Expansion Foam (HEF) Tanks with C2 Hi-Ex Concentrate

1. Scope: The contractor shall provide all management, tools, supplies, equipment, transportation and personnel necessary to fill two 500-gallon tanks (designated “north” and “south” tank) with C2 Hi-Ex concentrate or equal. This work is associated with the HEF fire suppression system located at Travis AFB, CA. The contractor shall perform a bladder integrity test on vessel(s); if bladders are found to be viable then fill each tank with 500-gallons of C2 Hi-Ex concentrate or equal. All work will be done in accordance with NFPA standards. The contractor shall remove and dispose of all waste and excess material generated in the performance of filling tanks.

2. Basic Services: Conduct system integrity (i.e. leak) test on existing “north and “south” tank bladders, provide new foam concentrate (details below) and fill.

2.1. Foam concentrate minimum specifications:

Appearance Colorless Liquid Specific Gravity 1.02 g/ml pH 6.5 Viscosity 100 cps

3. Hours of operation: All work on this job shall be accomplished within the hours of 7:00 AM to 4:30 PM Monday through Friday. Contractor may request extension of operating hours.

Accommodation will depend upon availability of personnel from requesting agency and to be determined by requesting agency’s point of contact (POC). Extension of operating hours must be requested by the Contractor a minimum of 24 hours in advance and must be authorized, in writing, by the Water Fuels Systems Maintenance (WFSM) Shop Supervisor or designated representative.

4. Schedules/Notifications: The contractor shall provide the government with at least five working days advanced notice prior to start of work. The contractor shall immediately notify the government of any work delays in completing the job.

5. Location: All work for this project shall be performed on Travis AFB, CA.

6. Industrial Areas: Hangar 818 is located in the central part of the base west of the flightline.

7. Survey Procedures: The contractor shall conduct a site a survey and perform safety operations to ensure equipment can clear and operate within the hangar/mechanical space confines. Take all precautions necessary to prevent damage to equipment, systems and property.

8. Final Reports: The contractor shall submit a Safety Data Sheet (SDS) of C2 Hi-Ex concentrate as any additional findings or concerns in word document format to the WFSM shop within 7 days of completion of all work.

9. Contractor Foreman: The contractor’s foreman or representative shall have the capability of speaking and understanding the English language.

10. Safety: The contractor and his employees shall comply with the following:

• AFOSH STD 91-10, Safety, Civil Engineering Information

• AFOSH STD 91-66, Safety, General Industrial Operations