B05_Solicitation_HHSI61-18-R-0011_A0001.pdf
PDF 104 KB Posted
- Attached to
- Umatilla Wastewater Repairs
- Solicitation number
- HHSI61-18-R-00011
About this file
Amendment A0001 Solicitation HHSI61-18-R-0011
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
A0001
Solicitation Number: HHSI61-18-R-0011 entitled "Mission Community Wastewater Collection System Improvements" for the Umatilla Indian Reservation, near Pendleton, Oregon
See continuation pages.
Indian Health Service Department of Engineering Services, Dallas 1301 Young Street, Suite 1071 Dallas, Texas 75202
HHSI161-18-R-0011
1 9
01/17/2018
01/04/2018
SF30 CONTINUATION OF BLOCK NARRATIVE
SUMMARY OF CHANGES
January 17, 2018
HHSI61-18-R-0011
The purpose of this amendment one (A0001) is to provide for the following changes:
A. Attachment J01, Wage Determination: General Decision Number: OR170077 has been updated and included as a part of this amendment.
The attached revised sections are to be replaced in their entirety. Specification changes are generally identified, for convenience, but all portions of the revised sections shall apply whether or not changes have been indicated.
B. Provide for the following questions and corresponding answers:
1. Question: For the inspection of the service laterals are there cleanouts at the residences or will we need to plan on placing a new cleanout at each of the residences?
Answer: The request for pricing is based on a cleanout being present. Any differentiation from the scope, specifications and/or drawings (e.g. differing site conditions) will be negotiated by a change order where and if applicable.
2. Question: Provide clarification on the disposal site for the materials removed from the lines in the cleaning of them. Where will this material need to be hauled to? The City of Pendleton doesn’t seem to want to take it but in the [site visit] meeting it seemed that it was the understanding that they would.?
Answer: In accordance with Attachment J02, Specifications, Section 02534 – Sewer Cleaning, it is the contractors’ responsibility to determine the appropriate solid waste disposal facility that is licensed to receive the level of waste generated.
“Disposal of Materials: Do not discharge sewage or solids removed from downstream manholes, onto streets, or into ditches, catch basins or storm drains. All solids resulting from the cleaning operations shall be removed from the site and disposed at a waste facility meeting local, state, and federal regulations for the type of material being disposed.”
3. Question: Will the I/I coming directly into the manholes be address in this contract?
Answer: A current condition assessment of the manholes is not available and repairs are not included under this solicitation.
4. Question: Please provide the TERO rate?
Answer: The applicable TERO rate(s) is/are the contractors’ responsibility to determine and include in their overall proposal cost. The TERO offices’ contact information can be found in Section H – Special Contract Requirements, Paragraph H.1. Tribal Employments Rights Office (TERO) of the solicitation. As stated in this paragraph, “The estimated CTUIR TERO fee is 2.5% of the total award price of the Base Items and of Option Items, if awarded, with confirmation the responsibility of the Offeror. Regardless of this estimated TERO Fee, the Offeror shall confirm particulars with the CTUIR TERO Office. TERO fees shall be included in Item 1 Mobilization, Bond Premiums & TERO Fees.”
C. The proposal due date and time remains unchanged. Proposals are due on or before Wednesday, February 7, 2018 1:00pm local time.
Continued on the following page.
SF30 CONTINUATION OF BLOCK NARRATIVE
SUMMARY OF CHANGES
January 17, 2018
D. Due to an administrative error that can’t be retroactively corrected, it is noted that the solicitation number is HHSI61-18-R-0011 even though the public notice on www.fbo.gov files it as HHSI61-18-R-00011. These two solicitation numbers are one in the same.
E. NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their offer (Block 19 of the SF1442).
All other terms and conditions remain unchanged.
END OF SUMMARY OF CHANGES
http://www.fbo.gov/
Solicitation HHSI61-18-R-0011 Attachment J01 Amendment A0001
General Decision Number: OR180077 01/05/2018 OR77
Superseded General Decision Number: OR20170077
State: Oregon
Construction Type: Heavy
County: Umatilla County in Oregon.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
CARP0001-038 06/01/2012
Rates Fringes CARPENTER (Excluding Form Work)............................$ 32.61 14.44
MILLWRIGHT.......................$ 33.11 14.44
ELEC0112-004 06/01/2017
Rates Fringes
ELECTRICIAN......................$ 40.90 20.06
ENGI0701-040 01/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 39.90 14.10
GROUP 1A....................$ 41.90 14.10
GROUP 1B....................$ 43.89 14.10
GROUP 2.....................$ 37.99 14.10
GROUP 3.....................$ 36.84 14.10
GROUP 4.....................$ 35.76 14.10
GROUP 5.....................$ 34.52 14.10
GROUP 6.....................$ 31.30 14.10
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments;
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers; Loader 120,000 lbs and above; BLADE: Auto Grader; Blade Operator-Robotic; Bulldozer over 120,000 lbs and above;
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Loader 60,000 lbs and less than 120,000 lbs; Bulldozer over 70,000 lbs up to and including 120,000 lbs;
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: track and wheel type, up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade Operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Loaders 25,000 lbs and less than 60,000 lbs;
Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs; Screed; Compactor with blade; Mechanic
GROUP 5: TRACKHOE/BACKHOE HYDRAULIC: Track type up to and including 20,000 lbs, Wheel type (Ford, John Deer, Case Type); Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Loaders, rubber tired type , less than 25,00 lbs; Forklift over 5 ton, Bulldozer 20,000 lbs or 100 horses or less; Roller; Compactor without blade
GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Grade Checker; Crane oiler; Forklift; Roller (non-asphalt)
Zone Differential (add to Zone 1 rates):
Zone 2 - $3.00 Zone 3 - $6.00
For the following metropolitan counties: MULTNOMAH;
CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;
CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED:
All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.
St. Helens "Blast Zone" shall receive Zone I pay for all classifications.
All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.
For the following cities: ALBANY; BEND; COOS BAY; EUGENE;
GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG
All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.
All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.
IRON0029-013 07/01/2015
Rates Fringes IRONWORKER (Reinforcing and Structural)......................$ 34.12 23.04
* LABO0737-005 06/01/2017
Rates Fringes Laborers: (Mason Tender-Cement/Concrete)..........$ 28.89 13.85
* LABO0737-031 06/01/2017
Rates Fringes Laborers:
GROUP 1.....................$ 28.86 13.85
GROUP 2.....................$ 29.94 13.85
LABORER CLASSIFICATIONS
GROUP 1: Asphalt Spreader
GROUP 2: Grade Checker
PAIN0055-022 07/01/2017
Rates Fringes
PAINTER
BRUSH, ROLLER AND SPRAY.....$ 23.02 11.02
PLUM0598-007 06/01/2017
Rates Fringes
Plumbers and Pipefitters.........$ 49.24 28.79
SUOR2009-075 11/23/2009
Rates Fringes
CARPENTER (Form Work Only).......$ 23.50 9.27
CEMENT MASON/CONCRETE FINISHER...$ 21.13 8.90
LABORER: Common or General......$ 21.05 4.38
LABORER: Fence Erection.........$ 23.88 7.45
LABORER: Flagger................$ 19.31 5.31
LABORER: Pipelayer..............$ 20.52 4.51
LINE CONSTRUCTION: Groundman....$ 31.36 7.27
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 22.77 7.90
OPERATOR: Broom/Sweeper.........$ 32.31 6.43
OPERATOR: Excavator.............$ 30.12 6.23
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 27.59 2.96
TRUCK DRIVER: Dump Truck........$ 23.79 5.95
TRUCK DRIVER: Off the Road Truck............................$ 31.81 6.33
TRUCK DRIVER: Water Truck.......$ 26.12 6.53
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION