24Q0005_ATTCH8_DRFT_QASP_102623.pdf
PDF 302 KB Posted
- Attached to
- Support for DoDEA's Leadership Development Pipeline (LDPP) Protocols Federal contract opportunity
- Solicitation number
- HE125424Q0005
- Issued by
- Department of Defense Education Activity
About this file
This document is a draft Quality Assurance Surveillance Plan (QASP) for contract number HE125424Q0005 to provide support for the Department of Defense Education Activity's Leadership Development Pipeline Program. The QASP outlines performance standards and acceptable quality levels for tasks including supporting the School Administrator Leadership Program and Aspiring Leader Academy in multiple option years, as well as providing communication, print and digital resources, and technical support. It details the roles of the Contracting Officer and Contracting Officer's Representative in monitoring performance. Methods of surveillance include direct observation, periodic inspection, and validated user complaints. Performance will be rated as exceptional, satisfactory, or unsatisfactory. Templates are provided for documenting acceptable and unacceptable performance through performance reports and contract discrepancy reports. The frequency of performance assessment meetings and contents of the COR's quality surveillance file are also defined.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 24Q0005_0001_RFQAMENDMENT_CONFORMED_112123.pdf | ||
| 24Q0005_0001_RFQAMENDMENT_MOD_112123.pdf | ||
| 24Q0005_Attachment9_Questions and Answers_112123.pdf | ||
| 24Q0005_ATTCH1PRCINGSHEET_112123.xls | XLS spreadsheet | |
| 24Q0005_Attachment10_Performance Elements and Supporting Docs_112123.pdf | ||
| 24Q0005_ATTCH2_TOS_102623.docx | DOCX document | |
| 24Q0005_ATTCH3_ARS_102623.pdf | ||
| 24Q0005_ATTCH7_DD-2930a_102623.pdf | ||
| 24Q0005_ATTCH4_CloudQ_102623.pdf | ||
| 24Q0005_ATTCH5_102623.docx | DOCX document | |
| 24Q0005_SOL_103123.pdf | ||
| 24Q0005_ATTCH1_PRCINGSHEET_103123_Final.xlsx | XLSX spreadsheet | |
| 24Q0005_ATTCH6_Privacy Checklist_102623.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24Q0005-Attachment #8- draft Quality Assurance Surveillance Plan
Support for DoDEA’s Leadership Development Pipeline Program (LDPP)
1. Purpose This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract by explaining (1) what is monitored, (2) how monitoring occurs, (3) who monitors, and (4) how monitoring efforts and results are documented.
2. Background Usually copied from the PWS.
3. Objectives Usually Scope of Work copied from the PWS.
This QASP does not detail how the Contractor accomplishes the work, but is based on the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. The Government is responsibility to be objective, fair, and consistent in evaluating performance. The QASP takes into account that unforeseen and uncontrollable situations may occur. It is a living document, which the Government may review and revise on a regular basis to ensure it remains valid, useful, and enforceable. The Government will coordinate any changes with the Contractor. DoDEA will provide copies of the original QASP and revisions to the Contractor and Government officials implementing the surveillance activities.
4. Government Personnel Responsible to Oversee and Coordinate Surveillance Contracting Officer (KO) - Ensures performance of all necessary actions for effective contracting, compliance with the contract terms, and safeguarding the interests of the Government in the contractual relationship. Ensures the Contractor receives impartial, fair, and equitable treatment under this contract. Is responsible for the final determination of Contractor performance.
Assigned KO: TBD
Contracting Officer’s Representative (COR) - Is responsible for technical administration of the contract, ensures proper Government surveillance of Contractor performance. Keeps a quality assurance file. Provides all corresponding documentation to the KO when the contract expires. Is not empowered to make any contractual commitments or authorize any contractual changes on the Government’s behalf. The Contractor shall refer any changes that may affect contract price, terms, or conditions to the KO for action.
Assigned COR: TBD
Contractor Representatives The following employee(s) of the Contractor serve as the Contractor’s Program Manager and Task Manager for this contract:
Program Manager: TBD
5. Performance Standards Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets or does not meet contract standards. The Performance Requirements Summary Matrix below includes the performance standards. The Government will determine Contractor performance by comparing them to the Acceptable Quality Level (AQL).
Performance Objective
Performanc e Standard Acceptable Quality Level Inspection Method
Base Period, LDPP Framework Support, PWS 2.2
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Base Period, School Administrator
Leadership Program Support, PWS 2.3
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 1, School Administrator
Leadership Program Support, PWS 2.4
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 1, Aspiring Leader Academy Support, PWS 2.5
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Communication Support, PWS 2.6
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 2, School Administrator
Leadership Program Year 2 Support, PWS
2.7
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 2, Aspiring Leader Academy Support, PWS 2.8
100% compliance with PWS
Compilation and analysis of data completed according to planned dates
COR inspection and stakeholder feedback Option Year 3, School
Administrator Leadership Program Support, PWS 2.9
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 3, Aspiring Leader Academy
Support, PWS 2.10
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Option Year 4 Support, PWS 2.11
100% compliance with PWS
Draft: 80% correct Final: 100% correct except for any minor errors in grammar/ & formatting.
COR inspection and stakeholder feedback
Delivery of Print and Digital Resources, PWS 2.12.1
100% compliance with PWS
Not more than one delivery will be late each year of the contract
COR inspection and stakeholder feedback
Performance Objective
Performanc e Standard Acceptable Quality Level Inspection Method
Technical Support, PWS 2.12.3
100% compliance with PWS
Acknowledge receipt of request within two hours. Resolve 90% of requests in one business day. Resolve remaining 10% in five business days.
COR inspection and stakeholder feedback
Privacy Training
PWS 3.6.3
100% compliance with PWS
No more than one request per year submitted late. COR inspection
Privacy Verification
PWS 3.6.4
100% compliance with PWS
Submitted 120 calendar days prior to the end of each contract year COR inspection
6. Incentives Positive past performance evaluations
7. Methods of QA Surveillance Various methods exist to monitor performance. The COR will use the surveillance methods listed below. Regardless of the surveillance method, the COR will always contact the Contractor's task manager or on-site representative when a defect is identified and inform him/her of the specifics.
The COR is responsible to monitor Contractor performance in meeting a specific performance standard/AQL usually by one of the following methods:
Direct Observation: Performed periodically or through 100% surveillance as needed.
Periodic Inspection: Done as required.
Validated User/Customer Complaints: Based on complaints from stakeholders.
100% Inspection Surveillance results may be used as the basis for actions (including payment deductions) against the Contractor. In such cases, the contract’s Inspection of Services clause becomes the basis for the KO’s actions.
8. Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. Unless otherwise specified, the following rating scale will be used:
Exceptional: Performance significantly exceeds requirements to the Government’s benefit.
Satisfactory: Performance meets contractual requirements.
Unsatisfactory: Performance does not meet contractual requirements.
9. Documenting Performance Acceptable Performance: DoDEA will document acceptable performance. Any report may become a part of the supporting documentation history. A report template is attached.
Unacceptable Performance: When unacceptable performance occurs, the COR will inform the Contractor. Notification will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR will document the discussion and place it in the COR file. When the COR determines formal written communication is required, s/he will prepare a Contract Discrepancy Report (CDR) and present it to the Contractor's task manager or on-site representative. A CDR template is attached.
The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan, i.e., the Contractor’s plan to correct the unacceptable performance and avoid a recurrence. The CDR will also state how long the Contractor has to present this corrective action plan to the COR. The Government will review the Contractor's corrective action plan to determine acceptability. A CDR may become a part of the supporting documentation for contract payment deductions or other actions deemed necessary by the KO.
10. Measurement Frequency of Measurement: During contract/order performance, the COR will take periodic measurements, as specified in the AQL column of the Performance Requirements Summary Matrix and analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
Frequency of Performance Assessment Meetings: The COR will meet with the Contractor at a minimum of once per year to assess performance and obtain a written assessment.
11. COR’s Quality Surveillance File The COR’s quality surveillance file shall contain the following documentation:
1) COR appointment letter, any changes to that letter, and any termination letters
2) COR training certificates
3) Contract and all contract modifications
4) Applicable quality assurance surveillance plan (QASP)
5) Names, titles, and contact information of all key personnel assigned to this contract, both
Government and Contractor
6) Surveillance schedules / checklists, if applicable
7) All correspondence (1) by authorized Contractor and Government personnel regarding performance of the contract and (2) customer feedback
8) Memoranda for record of minutes of any meeting, telephone conversations and discussions with the contractor or others pertaining to the contract or contract performance
9) Documentation pertaining to acceptance of services, reports or data
10) Contractor’s quality control plan (QCP), if applicable
11) Property management system plan (PMSP), if applicable
Prepared by COR’s name
Name, COR Date
Performance Report
< This template will be used to formally document surveillance. >
1. Contract number:
2. Prepared by:
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
Method of surveillance.
How frequently you conducted surveillance.
Surveillance results.
Number of observations.
Prepared by:
Contracting Officer’s Representative Date
Contract Discrepancy Report (CDR)
< This template will be used to formally document discrepancies. >
1. Contract Number:
2. To: (Contractor Task Manager or on-site representative)
3. From: TBD
4. Date and time observed discrepancy:
5. Discrepancy or problem:
<Describe in detail. Identify any attachments.>
6. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this CDR. >
Prepared by:
Contracting Officer’s Representative Date
Received by:
Contractor Task Manager or On-Site Representative Date
The COR may initiate a CDR at any time, including when (1) the number of monthly recorded defects for a performance standard exceeds the allowable number of defects, (2) unacceptable performance is determined critical in nature and requires formal corrective action, and (3) an unfavorable trend in Contractor performance is detected.
| 1. Purpose |
| 2. Background |
| 3. Objectives |
| 4. Government Personnel Responsible to Oversee and Coordinate Surveillance |
| 5. Performance Standards |
| 6. Incentives |
| 7. Methods of QA Surveillance |
| 8. Ratings |
| 9. Documenting Performance |
| 10. Measurement |
| 1. Contract number: |
| 2. Prepared by: |
| 3. Date and time of observation: |
| 4. Observation: |
| 1. Contract Number: |
| 2. To: (Contractor Task Manager or on-site representative) |
| 3. From: TBD |
| 4. Date and time observed discrepancy: |
| 5. Discrepancy or problem: |
| 6. Corrective action plan: |
File details come from the government source that posted it. Updated .