SOW PHETS 14 Jan 11.doc
DOC document 28 KB Posted
- Attached to
- Removal of Recyclable Materials
- Solicitation number
- HDTRA2-11-T-0030
- Issued by
-
Defense Threat Reduction Agency
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HDTRA2-11-T-0030 Amend 1.doc | DOC document | |
| HDTRA2-11-T-0030 Materials.doc | DOC document | |
| Trans ltr_PHETS.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE THREAT REDUCTION AGENCY (DTRA)
STATEMENT OF WORK (SOW)
FOR
“REMO\/AL OF RECYCLABLE MATERIALS FROM THE
PERMANENT HIGH EXPLOSIVE TEST SITE”
July 6, 2011
SECTION 1 - SCOPE
1.1 BACKGROUND. The Permanent High Explosive Test Site (PHETS) on White Sands Missile Range (WSMR) requires removal of recyclable materials from designated areas located in and around PHETS site.
1.2 OBJECTI\/E. The Scope of Work (SOW) provides for the removal of recyclable materials from designated areas located in and round the PHETS site. The contractor shall perform all material(s) pick-up and removal, cleanup, transportation, and disposal at no cost to the Government. The contractor’s compensation for this work is limited to recycling of the recovered materials, no other use is authorized. Material(s) removed under this contract is strictly for recycling. No other use is allowed or authorized.
1.3 TERM. The contract shall become effective upon notice to proceed (NTP). The period of performance shall consist of one (1) base year and four (4) one-year Options.
1.4 PAYMENT TERMS AND CONDITIONS. There shall be no cost to the Government for the performance of services under this contract.
1.5 HOLD HARMLESS. The contractor agrees to indemnify and hold the Government harmless, as well as, its officers, agents, and employees from and against any and all claims, liabilities, losses, and causes of action which may arise, accrue, or result to any person, firm, corporation, or other entity which may be injured or damaged as a result of acts, omissions, or negligence on the part of the contractor, its employees, or any person acting for or on its or their behalf relating to this contract.
1.6 RELEASE OF CLAIMS. Upon completion of the contract, the contractor shall submit a signed release of claims to the Government representative.
1.7 TERMINATION FOR CONVENIENCE. The Government may terminate this contract without clause for any reason. The termination shall not be deemed a Breach of Contract by the Government. The Government shall give the contractor at least two (2) days verbal notice before the effective termination date. Upon such termination, the contractor shall have no right to any actual general, special, incidental, consequential, or any other damages whatsoever of any description or amount.
SECTION 2 - APPLICABLE DOCUMENTS
2.1 DRAWINGS. None
2.2 SPEC1FICATIONS. None
2.3 REFERENCES. None
SECTION 3 - REQUIREMENTS
3.1 PARTS. Not used
3.2 DESCRIPTION OF WORK. The contractor shall provide all labor, materials, travel, and equipment necessary for accomplishing the work specified below at no cost to the Government.
3.2.1 PHETS Material Yard. Remove all rebar, cable, steel, and any other materials marked with orange paint by the PHETS manager and dispose of by recycling only through appropriate salvage yards or recycling companies. Perform clean-up of immediate materials area.
SECTION 4 - SPECIAL REQUIREMENTS/CONDITIONS
4.1 Report. The contractor is required to report to the PHETS Project Manager at the beginning and end of each work day. The PHETS Manager will coordinate with WSMR to provide the contractor with access to the work sites.
4.2 Government PHETS Project Manager.
4.2.1 Project Manager: Mr. Innocencio Salinas, (505) 679-4152
PAGE
File details come from the government source that posted it. Updated .