HDEC04-15-R-0026.doc
DOC document 2 MB Posted
- Solicitation number
- HDEC04-15-R-0026
- Issued by
-
Defense Commissary Agency
About this file
Solicitation for the performance of preventive maintenance (PM) and repair services for Defense Commissary Agency commissaries located at the following California locations Barstow MCLB Beale AFB China Lake NAWS Edwards AFB Fort Irwin Lemoore NAS Los Angeles AFB March AFB McClellan AFB Moffett Field NAS Ord Community Port Hueneme NCBC Travis AFB Twentynine Palms MCAGCC and Vandenberg AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HDEC04-15-R-0026-0002.doc | DOC document | |
| HDEC04-15-R-0026-0001.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Barstow Commissary MHE
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
FOB: Destination
PURCHASE REQUEST NUMBER: HQCKLL33242700000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Barstow
T&M
Hourly Rate
PURCHASE REQUEST NUMBER: HQCKLL33242700000
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 7,000 |
| Each |
Materials - Barstow
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
Round trip from contractor’s business to commissary and return.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AD
| 2 |
| Each |
1R05-A, Electric Pallet Jack - Barstow
Semi-Annual Preventive Maintenance
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AE
| 2 |
| Each |
1R06, Electric Forklift - Barstow
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AF
| 2 |
| Each |
1R12-A, Propane Forklift - Barstow
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Beale AFB Commissary MHE reventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
PURCHASE REQUEST NUMBER: HQCKLK33242700000
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AA
| 54 |
| Hours |
Time – Unscheduled Maint/Repair
Hourly Rate
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AB
| 7,000 |
| Each |
Materials - Beale
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack - Beale
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AE
| 4 |
| Each |
1R06, Electric Forklift - Beale
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AF
| 2 |
| Each |
1R07, Narrow Aisle Forklift - Beale
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AG
| 2 |
| Each |
1R13, Order Picker - Beale
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
China Lake Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AB
| 7,000 |
| Each |
Materials - China Lake
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AD
| 2 |
| Each |
1R05-A, Electric Pallet Jack- China Lake
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AE
| 2 |
| Each |
1R06, Electric Forklift - China Lake
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0003AF
| 2 |
| Each |
1R12-A, Propane Forklift - China Lake
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Edwards AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Edward
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AB
| 7,000 |
| Each |
Materials - Edwards AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack - Edwards
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AE
| 4 |
| Each |
1R06, Electric Forklift - Edwards
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AF
| 2 |
| Each |
1R07, Narrow Aisle Forklift - Edwards
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Fort Irwin Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AA
| 54 |
| Hours |
Time -Unscheduled Maint/Repairs-Ft Irwin
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AB
| 7,000 |
| Each |
Materials - Fort Irwin
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack - Ft Irwin
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AE
| 4 |
| Each |
1R06, Electric Forklift - Ft Irwin
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0005AF
| 2 |
| Each |
1R07, Narrow Aisle Forklift - Ft Irwin
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lemoore Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Lemoore
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AB
| 7,000 |
| Each |
Materials - Lemoore
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack - Lemoore
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AE
| 4 |
| Each |
1R06, Electric Forklift - Lemoore
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0006AF
| 2 |
| Each |
1R12-A, Propane Forklift - Lemoore
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Los Angeles AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-LA AFB
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AB
| 7,000 |
| Each |
Materials - Los Angeles AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack - LA AFB
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AE
| 6 |
| Each |
1R06, Electric Forklift - LA AFB
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AF
| 2 |
| Each |
1R08, Walker/Rider - LA AFB
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
March AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-March
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AB
| 7,000 |
| Each |
Materials - March AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AD
| 6 |
| Each |
1R05-A, Electric Pallet Jack - March
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AE
| 4 |
| Each |
1R06, Electric Forklift - March
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AF
| 4 |
| Each |
1R08, Walker/Rider - March
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0008AG
| 2 |
| Each |
1R12-A, Propane Forklift - March
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
McClellan AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AB
| 7,000 |
| Each |
Materials - McClellan AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AD
| 8 |
| Each |
1R05-A, Electric Pallet Jack - McClellan
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AE
| 4 |
| Each |
1R06, Electric Forklift - McClellan
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AF
| 2 |
| Each |
1R08, Walker/Rider - McClellan
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AG
| 2 |
| Each |
1R12-A, Propane Forklift - McClellan
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AH
| 2 |
| Each |
1R13, Order Picker - McClellan
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Moffett Field Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Moffett
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AB
| 7,000 |
| Each |
Materials - Moffett Field
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AD
| 6 |
| Each |
1R05-A, Electric Pallet Jack - Moffett
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AE
| 4 |
| Each |
1R06, Electric Forklift - Moffett
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AF
| 2 |
| Each |
1R08, Walker/Rider - Moffett
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0010AG
| 2 |
| Each |
1R12-A, Propane Forklift - Moffett
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Ord Community Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Ord
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AB
| 7,000 |
| Each |
Materials - Ord Community
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AD
| 6 |
| Each |
1R05-A, Electric Pallet Jack - Ord
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AE
| 4 |
| Each |
1R06, Electric Forklift - Ord
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0011AF
| 2 |
| Each |
1R07, Narrow Aisle Forklift - Ord
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Port Hueneme Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AB
| 7,000 |
| Each |
Materials - Port Hueneme
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AD
| 6 |
| Each |
1R05-A, Electric Pallet Jack- Port Huene
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AE
| 4 |
| Each |
1R06, Electric Forklift - Port Hueneme
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0012AF
| 2 |
| Each |
1R12-A, Propane Forklift - Port Hueneme
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Travis AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs-Travis
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AB
| 7,000 |
| Each |
Materials - Travis AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AD
| 8 |
| Each |
1R05-A, Electric Pallet Jack - Travis
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AE
| 6 |
| Each |
1R06, Electric Forklift - Travis
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AF
| 4 |
| Each |
1R07, Narrow Aisle Forklift - Travis
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AG
| 2 |
| Each |
1R08, Walker/Rider - Travis
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0013AH
| 2 |
| Each |
1R12-A, Propane Forklift - Travis
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Twentynine Palms Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0014AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0014AB
| 7,000 |
| Each |
Materials - Twentynine Palms
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0014AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0014AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack -Twentynine
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0014AE
| 4 |
| Each |
1R06, Electric Forklift -Twentynine Palm
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Vandenberg AFB Commissary MHE
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Base: May 1, 2015 or "Date of Award" - April 30, 2016
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AA
| 54 |
| Hours |
Time - Unscheduled Maint/Repairs
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AB
| 7,000 |
| Each |
Materials - Vandenberg AFB
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AC
| 5 |
| Each |
Trip Charge – Unscheduled Maint/Repair
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AD
| 4 |
| Each |
1R05-A, Electric Pallet Jack- Vandenberg
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AE
| 4 |
| Each |
1R06, Electric Forklift - Vandenberg
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0015AF
| 2 |
| Each |
1R08, Walker/Rider - Vandenberg
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Barstow Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Barstow |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AB
| 7,000 |
| Each |
| OPTION |
| Materials - Barstow |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AD
| 2 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AE
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Beale AFB Commissary MHE |
FFP
reventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AA
| 54 |
| Hours |
| OPTION |
| Time – Unscheduled Maint/Repair |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AB
| 7,000 |
| Each |
| OPTION |
| Materials - Beale |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AG
| 2 |
| Each |
| OPTION |
| 1R13, Order Picker - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| China Lake Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AB
| 7,000 |
| Each |
| OPTION |
| Materials - China Lake |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AD
| 2 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack- China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AE
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Edwards AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Edward |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AB
| 7,000 |
| Each |
| OPTION |
| Materials - Edwards AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Irwin Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AA
| 54 |
| Hours |
| OPTION |
| Time -Unscheduled Maint/Repairs-Ft Irwin |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AB
| 7,000 |
| Each |
| OPTION |
| Materials - Fort Irwin |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Ft Irwin |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ft Irwin |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1005AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Ft Irwin |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Lemoore Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Lemoore |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AB
| 7,000 |
| Each |
| OPTION |
| Materials - Lemoore |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Lemoore |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Lemoore |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1006AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Lemoore |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Los Angeles AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-LA AFB |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AB
| 7,000 |
| Each |
| OPTION |
| Materials - Los Angeles AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - LA AFB |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AE
| 6 |
| Each |
| OPTION |
| 1R06, Electric Forklift - LA AFB |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1007AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider - LA AFB |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| March AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-March |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AB
| 7,000 |
| Each |
| OPTION |
| Materials - March AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - March |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - March |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AF
| 4 |
| Each |
| OPTION |
| 1R08, Walker/Rider - March |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1008AG
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - March |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| McClellan AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AB
| 7,000 |
| Each |
| OPTION |
| Materials - McClellan AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - McClellan |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - McClellan |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider - McClellan |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AG
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - McClellan |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1009AH
| 2 |
| Each |
| OPTION |
| 1R13, Order Picker - McClellan |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Moffett Field Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Moffett |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AB
| 7,000 |
| Each |
| OPTION |
| Materials - Moffett Field |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Moffett |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Moffett |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider - Moffett |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1010AG
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Moffett |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Ord Community Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Ord |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AB
| 7,000 |
| Each |
| OPTION |
| Materials - Ord Community |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Ord |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Ord |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1011AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Ord |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Port Hueneme Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AB
| 7,000 |
| Each |
| OPTION |
| Materials - Port Hueneme |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AD
| 6 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack- Port Huene |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Port Hueneme |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1012AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Port Hueneme |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Travis AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Travis |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AB
| 7,000 |
| Each |
| OPTION |
| Materials - Travis AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AD
| 8 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Travis |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AE
| 6 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Travis |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AF
| 4 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Travis |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AG
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider - Travis |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1013AH
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Travis |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Twentynine Palms Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1014AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1014AB
| 7,000 |
| Each |
| OPTION |
| Materials - Twentynine Palms |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1014AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1014AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack -Twentynine |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1014AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift -Twentynine Palm |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Vandenberg AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year One: May 1, 2016 - April 30, 2017
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AB
| 7,000 |
| Each |
| OPTION |
| Materials - Vandenberg AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack- Vandenberg |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Vandenberg |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1015AF
| 2 |
| Each |
| OPTION |
| 1R08, Walker/Rider - Vandenberg |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Barstow Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year Two: May 1, 2017 - April 30, 2018
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Barstow |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AB
| 7,000 |
| Each |
| OPTION |
| Materials - Barstow |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AD
| 2 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AE
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - Barstow |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Beale AFB Commissary MHE |
FFP
reventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year Two: May 1, 2017 - April 30, 2018
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AA
| 54 |
| Hours |
| OPTION |
| Time – Unscheduled Maint/Repair |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AB
| 7,000 |
| Each |
| OPTION |
| Materials - Beale |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AG
| 2 |
| Each |
| OPTION |
| 1R13, Order Picker - Beale |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| China Lake Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year Two: May 1, 2017 - April 30, 2018
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AB
| 7,000 |
| Each |
| OPTION |
| Materials - China Lake |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AD
| 2 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack- China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AE
| 2 |
| Each |
| OPTION |
| 1R06, Electric Forklift - China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AF
| 2 |
| Each |
| OPTION |
| 1R12-A, Propane Forklift - China Lake |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Edwards AFB Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year Two: May 1, 2017 - April 30, 2018
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AA
| 54 |
| Hours |
| OPTION |
| Time - Unscheduled Maint/Repairs-Edward |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AB
| 7,000 |
| Each |
| OPTION |
| Materials - Edwards AFB |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AE
| 4 |
| Each |
| OPTION |
| 1R06, Electric Forklift - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AF
| 2 |
| Each |
| OPTION |
| 1R07, Narrow Aisle Forklift - Edwards |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Fort Irwin Commissary MHE |
FFP
Preventive Maintenance (PM) and Repair of Material Handling Equipment
Option Year Two: May 1, 2017 - April 30, 2018
PMs shall include: labor, parts, expendables, fluids, and trip charges to perform the requirements listed in the PM checklist. See Performance Work Statement (PWS) attached.
The contractor is responsible for capturing costs to complete the administrative process of manpower reporting. See PWS attached.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2005AA
| 54 |
| Hours |
| OPTION |
| Time -Unscheduled Maint/Repairs-Ft Irwin |
T&M
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2005AB
| 7,000 |
| Each |
| OPTION |
| Materials - Fort Irwin |
T&M
This is NOT a priced CLIN, it is a pre-determined amount where DeCA will pay actual costs for parts as evidenced by supplier invoice for direct materials and supplies used to accomplish preventive maintenance and repair services.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2005AC
| 5 |
| Each |
| OPTION |
| Trip Charge – Unscheduled Maint/Repair |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2005AD
| 4 |
| Each |
| OPTION |
| 1R05-A, Electric Pallet Jack - Ft Irwin |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2005AE
| 4 |
| Each |
| OPTION |
This is the start of the file's text. The full file is on GovTribe.