413R0021_-_Ovens_and_Proofers_(SOL).doc
DOC document 2 MB Posted
- Attached to
- Ovens and Proofers
- Solicitation number
- HDEC04-13-R-0021
- Issued by
-
Defense Commissary Agency
About this file
Ovens and Proofers
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
Site Survey
FFP
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
FOB: Destination
ESTIMATED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0001AA
| 34 |
| Each |
Site Survey
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0001AB
| 9 |
| Each |
Site Survey
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
CED 1B12-Acs - Oven, Rotary, Roll-in, Single Rack, Electric
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0002AA
| 16 |
| Each |
CED 1B12-Acs - Oven, Rotary, Roll-in, Single Rack, Electric
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
Warranty POC: ________________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0002AB
| 15 |
| Each |
CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0002AC
| 15 |
| Each |
CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0002AD
| 1 |
| Each |
CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AE
| 1 |
| Each |
CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - INSTALLATION
Outside the Continental United States (OCONUS)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0002AF
| 4 |
| Each |
CED 1B12-Acs, Racks for
Oven, Rotary, Roll-in, Single Rack, Electric
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AA
| 6 |
| Each |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AB
| 5 |
| Each |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AC
| 5 |
| Each |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AD
| 1 |
| Each |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AE
| 1 |
| Each |
CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0003AF
| 1 |
| Each |
CED 1B12-Bcs - Racks for
Oven, Rotary, Roll-in, Single Rack, Gas
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
CED 1B15cs - Oven/Proofer, Mini-Rotary
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0004AA
| 11 |
| Each |
CED 1B15cs - Oven/Proofer, Mini-Rotary
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0004AB
| 10 |
| Each |
CED 1B15cs - Oven/Proofer, Mini-Rotary
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0004AC
| 10 |
| Each |
CED 1B15cs - Oven/Proofer, Mini-Rotary
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0004AD
| 1 |
| Each |
CED 1B15cs - Oven/Proofer, Mini-Rotary
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0004AE
| 1 |
| Each |
CED 1B15cs - Oven/Proofer, Mini-Rotary
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
CED 1B20-Acs, Proofer, Roll-In, One-Door
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0005AA
| 2 |
| Each |
CED 1B20-Acs, Proofer, Roll-In, One-Door
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0005AB
| 1 |
| Each |
CED 1B20-Acs, Proofer, Roll-In, One-Door
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0005AC
| 1 |
| Each |
CED 1B20-Acs, Proofer, Roll-In, One-Door
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0005AD
| 1 |
| Each |
CED 1B20-Acs, Proofer, Roll-In, One-Door
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0005AE
| 1 |
| Each |
CED 1B20-Acs, Proofer, Roll-In, One-Door
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0006AA
| 19 |
| Each |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0006AB
| 13 |
| Each |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0006AC
| 13 |
| Each |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0006AD
| 6 |
| Each |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
0006AE
| 6 |
| Each |
CED 1B20-Bcs, Proofer, Roll-In, Two-Door
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 50 |
| Each |
Shipping Charges
Base Year: September 1, 2013, or date of award if later, through August 31, 2014
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| Site Survey |
FFP
Option Year 1: September 1, 2014 through August 31, 2015
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1001AA
| 34 |
| Each |
| OPTION |
| Site Survey |
FFP
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1001AB
| 8 |
| Each |
| OPTION |
| Site Survey |
FFP
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1002AA
| 12 |
| Each |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1002AB
| 11 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1002AC
| 11 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1002AD
| 1 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AE
| 1 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Outside the Continental United States (OCONUS)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1002AF
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Electric
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AA
| 7 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AB
| 5 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AC
| 5 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AD
| 2 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AE
| 2 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1003AF
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Gas
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AA
| 13 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1004AB
| 12 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1004AC
| 12 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1004AD
| 1 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1004AE
| 1 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1005AA
| 2 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1005AB
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1005AC
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1005AD
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1005AE
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1006AA
| 20 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
Option Year 1: September 1, 2014 through August 31, 2015
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1006AB
| 17 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1006AC
| 17 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1006AD
| 3 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
1006AE
| 3 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 50 |
| Each |
| OPTION |
| Shipping Charges |
FFP
Option Year 1: September 1, 2014 through August 31, 2015
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| Site Survey |
FFP
Option Year 2: September 1, 2015 through August 31, 2016
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2001AA
| 26 |
| Each |
| OPTION |
| Site Survey |
FFP
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2001AB
| 6 |
| Each |
| OPTION |
| Site Survey |
FFP
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2002AA
| 11 |
| Each |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2002AB
| 9 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2002AC
| 9 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2002AD
| 2 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AE
| 2 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Outside the Continental United States (OCONUS)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2002AF
| 2 |
| Each |
| OPTION |
| CED 1B12-Acs, Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Electric
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AA
| 6 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AB
| 5 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AC
| 5 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AD
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AE
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2003AF
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Gas
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AA
| 13 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2004AB
| 11 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2004AC
| 11 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2004AD
| 2 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2004AE
| 2 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2005AA
| 2 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2005AB
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2005AC
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2005AD
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2005AE
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2006AA
| 13 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
Option Year 2: September 1, 2015 through August 31, 2016
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2006AB
| 11 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2006AC
| 11 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2006AD
| 2 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
2006AE
| 2 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 50 |
| Each |
| OPTION |
| Shipping Charges |
FFP
Option Year 2: September 1, 2015 through August 31, 2016
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| Site Survey |
FFP
Option Year 3: September 1, 2016 through August 31, 2017
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3001AA
| 40 |
| Each |
| OPTION |
| Site Survey |
FFP
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3001AB
| 8 |
| Each |
| OPTION |
| Site Survey |
FFP
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3002AA
| 12 |
| Each |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3002AB
| 9 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3002AC
| 9 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3002AD
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AE
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Outside the Continental United States (OCONUS)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3002AF
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Electric
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AA
| 12 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AB
| 10 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AC
| 10 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AD
| 2 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AE
| 2 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3003AF
| 3 |
| Each |
| OPTION |
| CED 1B12-Bcs - Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Gas
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3004AA
| 25 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3004AB
| 24 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3004AC
| 24 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3004AD
| 1 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3004AE
| 1 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3005AA
| 2 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3005AB
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3005AC
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3005AD
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3005AE
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3006AA
| 22 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
Option Year 3: September 1, 2016 through August 31, 2017
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3006AB
| 20 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3006AC
| 20 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3006AD
| 2 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
3006AE
| 2 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 50 |
| Each |
| OPTION |
| Shipping Charges |
FFP
Option Year 3: September 1, 2016 through August 31, 2017
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| Site Survey |
FFP
Option Year 4: September 1, 2017 through August 31, 2018
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4001AA
| 40 |
| Each |
| OPTION |
| Site Survey |
FFP
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4001AB
| 9 |
| Each |
| OPTION |
| Site Survey |
FFP
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4002AA
| 15 |
| Each |
| OPTION |
| CED 1B12-Acs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4002AB
| 12 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4002AC
| 12 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4002AD
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AE
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Oven, Rotary, Roll-in, |
FFP
Single Rack, Electric - INSTALLATION
Outside the Continental United States (OCONUS)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4002AF
| 3 |
| Each |
| OPTION |
| CED 1B12-Acs, Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Electric
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AA
| 8 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AB
| 7 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AC
| 7 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AD
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AE
| 1 |
| Each |
| OPTION |
| CED 1B12-Bcs - Oven, Rotary, Roll-in, |
FFP
Single Rack, Gas - INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4003AF
| 2 |
| Each |
| OPTION |
| CED 1B12-Bcs - Racks for |
FFP
Oven, Rotary, Roll-in, Single Rack, Gas
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4004AA
| 23 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4004AB
| 21 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4004AC
| 21 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4004AD
| 2 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4004AE
| 2 |
| Each |
| OPTION |
| CED 1B15cs - Oven/Proofer, Mini-Rotary |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4005AA
| 2 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4005AB
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4005AC
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4005AD
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4005AE
| 1 |
| Each |
| OPTION |
| CED 1B20-Acs, Proofer, Roll-In, One-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4006AA
| 24 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
Option Year 4: September 1, 2017 through August 31, 2018
Manufacturer: _________________________________
Model: _______________________________________
Warranty Period: _______________________________
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4006AB
| 20 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4006AC
| 20 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Within the Continental United States (CONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4006AD
| 4 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
DE-INSTALLATION - Remove & Dispose
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
4006AE
| 4 |
| Each |
| OPTION |
| CED 1B20-Bcs, Proofer, Roll-In, Two-Door |
FFP
INSTALLATION
Outside the Continental United States (OCONUS)
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 50 |
| Each |
| OPTION |
| Shipping Charges |
FFP
Option Year 4: September 1, 2017 through August 31, 2018
In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.
Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.
ESTIMATED
ADDENDUM TO 52.212-1
ADDENDUM TO 52.212-1
INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
I. SUBMISSION OF OFFERS: [(Reference Paragraph (b)]
a. Proposals are to be submitted to the Defense Commissary Agency, LEAE, Attn: Trina Barnes, 1300 E. Ave, Fort Lee, VA 23801-1800. Faxed, scanned or e-mailed copies will be accepted. Email proposals to Ms. Barnes at trina.barnes@deca.mil or fax it to 804-734-8009 ext. 78348. The complete proposal with authorized representative’s signature must be received by the closing date and time. Offerors are also required to be registered in the Central Contractor Registration (CCR) database and System for Award Management (SAM) (https://www.acquisition.gov) to be eligible for award. The CCR database is accessed through SAM.
b. Product Information: The Offerors shall submit descriptive literature, a matrix, or other information that demonstrates that the proposed products meet or exceeds all the required generalized operating specifications of the Commissary Equipment Descriptions (CEDs): 1B12-Acs, 1B12-Bcs, 1B15cs & 1B20-Acs & 1B20-Bcs.
c. Offerors must have updated on-line representations and certifications at ORCA, https://www.acquisition.gov. The offerors only need to complete paragraph (b) (2) of FAR 52.212-3 and submit with their proposal. North American Industry Classification System (NAICS) Code applicable to this solicitation is 333241 and the Size Standard is 500. Per FAR 4.1201(a): Prospective contractors SHALL complete electronic annual representations and certifications (Reps & Certs) at ORCA accessed via https://www.acquisition.gov in conjunction with required registration in the Central Contractor Registration (CCR) database. Your Reps and Certs must include the NAICS applicable to this solicitation document and indicate your organization’s business size status.
Per 13 CFR 121.106 – If the size determination is based on the number of employees, the method for determining business size status is based on the average number of employees of the concern (including part-time and full-time employees of its domestic and foreign affiliates), which is based upon the number of employees for each of the pay periods for the preceding completed 12 calendar months. [Additional definition is available by searching 13 CFR.121 at http://www.gpoaccess.gov/cfr/index.html]
d. Past Performance References: Submit at least 5 references; companies that you have conducted business with over the last five years for delivery of products that are similar to those listed in this solicitation. Provide by email the following information for each reference to Trina Barnes, trina.barnes@deca.mil no later than July 8, 2013:
(1) Company Name and Address
(2) Point of Contact Name and Title
(3) Phone Number
(4) Facsimile Number
(5) E-Mail Address
(6) Description of Product Delivered
The references will be asked to provide information on your company’s past performance with regard to timeliness of delivery, quality, and business relations. The contracting officer will contact the references provided to obtain this information. Any other past performance information available to the contracting officer will also be considered.
e. Price: Provide your best price for each line item and enter the total price for the maximum quantity for each line item. Enter all pricing for the base and option years. Offerors shall not include shipping in the price of any CLIN.
f. Shipping Costs: DO NOT price shipping CLINs. We will use $1,000.00 as a place holder for systems purposes once the contract is awarded. Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific locations(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill attached to the invoice in Wide Area Workflow (WAWF).
II. The period for acceptance of offers is changed to 90 days.
ADDENDUM TO 52.212-4
ADDENDUM TO 52.212-4
TERMS AND CONDITIONS – COMMERCIAL ITEMS
The following paragraphs have been changed/added to FAR 52.212-4 Terms and Conditions – Commercial Items.
1. Administrative Modifications:
The government may issue unilateral written modifications that do not affect the substantive rights of the parties. Examples of administrative modifications are corrections in the payment office address or changes to the accounting and appropriation data.
2. Payment Procedures:
a. Funding will be provided on individual delivery orders. Payment will be made by Defense Finance and Accounting Service (DFAS). Contract payments will be processed electronically via EFT through the Defense Finance and Accounting Service (DFAS). Prior to DFAS releasing any contract payment, the contractor must submit an invoice COMBO using Wide Area Work Flow (WAWF) electronic commerce. An invoice COMBO is used to invoice for supplies or services and enables the vendor to create a separate invoice and receiving report from the same data entry session, eliminating the need to re-key data. After an invoice COMBO is received, a Government representative will acknowledge acceptance and receipt of the service via WAWF. After all items are properly submitted, the contract payment will be processed via DFAS electronically.
b. The contractor must access the WAWF Vendor Tools on the DFAS website and complete the requirements to obtain an active WAWF account. This will allow the contractor to submit invoices via WAWF so that payments can be processed electronically through EFT.
c. For additional WAWF information, see clause 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008).
d. Clause FAR 52.213-1, FAST PAYMENT PROCEDURE (MAY 2006), applies only to shipments destined for locations outside the continental U.S. (See 5 below.)
3. Period of Performance:
Base Year:
September 1, 2013, or date of award if later, through August 31, 2014
Option Year 1:
September 1, 2014 through August 31, 2015
Option Year 2: September 1, 2015 through August 31, 2016
Option Year 3: September 1, 2016 through August 31, 2017 Option Year 4: September 1, 2017 through August 31, 2018
5. Delivery:
Delivery orders will be issued and accessed through the Electronic Document Access System (EDA) http://eda.ogden.disa.mil. Contractors must complete the on-line registration available at the website in order to retrieve documents displayed there.
Delivery is required 30 days after receipt of delivery order. Delivery to commissaries shall be made between the hours of 7:00 am and 3:00 pm local time, Monday through Friday, excluding official Government Holidays. Delivery orders will contain the delivery location and any other necessary delivery instructions. The contractor can find the delivery address and points of contact information for each store at www.commissaries.com
6. Shipping:
Some delivery locations may require packaging and preparation for overseas shipment, but the contractor is responsible only for shipment to the port except Alaska and Hawaii, (See Shipping CLINs). Equipment destined for overseas shipment will be wrapped, blocked, and braced using best commercial practices so that the equipment arrives at destination without damage. Each Outside Continental United States (OCONUS) delivery order will include packing and marking instructions to the shipping port specified in the order. The contractor shall mark each shipment with the name of the contractor, contract number, and requisition number.
7. Be advised that this contract will be posted on http://www.commissaries.com/business/contracting.cfm at two distinct points during the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .