413R0021_-_Ovens_and_Proofers_(SOL).doc

DOC document 2 MB Posted

Attached to
Ovens and Proofers
Solicitation number
HDEC04-13-R-0021
Issued by

About this file

Ovens and Proofers

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

Site Survey

FFP

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

FOB: Destination

ESTIMATED

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0001AA

34
Each

Site Survey

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0001AB

9
Each

Site Survey

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CED 1B12-Acs - Oven, Rotary, Roll-in, Single Rack, Electric

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0002AA

16
Each

CED 1B12-Acs - Oven, Rotary, Roll-in, Single Rack, Electric

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

Warranty POC: ________________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0002AB

15
Each

CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0002AC

15
Each

CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0002AD

1
Each

CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0002AE

1
Each

CED 1B12-Acs, Oven, Rotary, Roll-in, Single Rack, Electric - INSTALLATION

Outside the Continental United States (OCONUS)

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0002AF

4
Each

CED 1B12-Acs, Racks for

Oven, Rotary, Roll-in, Single Rack, Electric

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AA

6
Each

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AB

5
Each

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AC

5
Each

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AD

1
Each

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AE

1
Each

CED 1B12-Bcs - Oven, Rotary, Roll-in, Single Rack, Gas - INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0003AF

1
Each

CED 1B12-Bcs - Racks for

Oven, Rotary, Roll-in, Single Rack, Gas

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CED 1B15cs - Oven/Proofer, Mini-Rotary

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

0004AA

11
Each

CED 1B15cs - Oven/Proofer, Mini-Rotary

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0004AB

10
Each

CED 1B15cs - Oven/Proofer, Mini-Rotary

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0004AC

10
Each

CED 1B15cs - Oven/Proofer, Mini-Rotary

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0004AD

1
Each

CED 1B15cs - Oven/Proofer, Mini-Rotary

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0004AE

1
Each

CED 1B15cs - Oven/Proofer, Mini-Rotary

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CED 1B20-Acs, Proofer, Roll-In, One-Door

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0005AA

2
Each

CED 1B20-Acs, Proofer, Roll-In, One-Door

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0005AB

1
Each

CED 1B20-Acs, Proofer, Roll-In, One-Door

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0005AC

1
Each

CED 1B20-Acs, Proofer, Roll-In, One-Door

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0005AD

1
Each

CED 1B20-Acs, Proofer, Roll-In, One-Door

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0005AE

1
Each

CED 1B20-Acs, Proofer, Roll-In, One-Door

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0006AA

19
Each

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0006AB

13
Each

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0006AC

13
Each

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0006AD

6
Each

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

0006AE

6
Each

CED 1B20-Bcs, Proofer, Roll-In, Two-Door

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
50
Each

Shipping Charges

Base Year: September 1, 2013, or date of award if later, through August 31, 2014

In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.

Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
Site Survey

FFP

Option Year 1: September 1, 2014 through August 31, 2015

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1001AA

34
Each
OPTION
Site Survey

FFP

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1001AB

8
Each
OPTION
Site Survey

FFP

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1002AA

12
Each
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1002AB

11
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1002AC

11
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1002AD

1
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

1002AE

1
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Outside the Continental United States (OCONUS)

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1002AF

3
Each
OPTION
CED 1B12-Acs, Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Electric

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AA

7
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AB

5
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AC

5
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AD

2
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AE

2
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1003AF

1
Each
OPTION
CED 1B12-Bcs - Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Gas

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

1004AA

13
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1004AB

12
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1004AC

12
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1004AD

1
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1004AE

1
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1005AA

2
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1005AB

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1005AC

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1005AD

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1005AE

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1006AA

20
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

Option Year 1: September 1, 2014 through August 31, 2015

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1006AB

17
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1006AC

17
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1006AD

3
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

1006AE

3
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
50
Each
OPTION
Shipping Charges

FFP

Option Year 1: September 1, 2014 through August 31, 2015

In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.

Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
Site Survey

FFP

Option Year 2: September 1, 2015 through August 31, 2016

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2001AA

26
Each
OPTION
Site Survey

FFP

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2001AB

6
Each
OPTION
Site Survey

FFP

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2002AA

11
Each
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2002AB

9
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2002AC

9
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2002AD

2
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

2002AE

2
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Outside the Continental United States (OCONUS)

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2002AF

2
Each
OPTION
CED 1B12-Acs, Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Electric

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AA

6
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AB

5
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AC

5
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AD

1
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AE

1
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2003AF

1
Each
OPTION
CED 1B12-Bcs - Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Gas

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

2004AA

13
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2004AB

11
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2004AC

11
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2004AD

2
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2004AE

2
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2005AA

2
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2005AB

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2005AC

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2005AD

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2005AE

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2006AA

13
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

Option Year 2: September 1, 2015 through August 31, 2016

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2006AB

11
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2006AC

11
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2006AD

2
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

2006AE

2
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
50
Each
OPTION
Shipping Charges

FFP

Option Year 2: September 1, 2015 through August 31, 2016

In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.

Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
Site Survey

FFP

Option Year 3: September 1, 2016 through August 31, 2017

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3001AA

40
Each
OPTION
Site Survey

FFP

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3001AB

8
Each
OPTION
Site Survey

FFP

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3002AA

12
Each
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3002AB

9
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3002AC

9
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3002AD

3
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

3002AE

3
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Outside the Continental United States (OCONUS)

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3002AF

3
Each
OPTION
CED 1B12-Acs, Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Electric

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AA

12
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AB

10
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AC

10
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AD

2
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AE

2
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3003AF

3
Each
OPTION
CED 1B12-Bcs - Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Gas

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

3004AA

25
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3004AB

24
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3004AC

24
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3004AD

1
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3004AE

1
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3005AA

2
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3005AB

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3005AC

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3005AD

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3005AE

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3006AA

22
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

Option Year 3: September 1, 2016 through August 31, 2017

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3006AB

20
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3006AC

20
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3006AD

2
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

3006AE

2
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
50
Each
OPTION
Shipping Charges

FFP

Option Year 3: September 1, 2016 through August 31, 2017

In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.

Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
Site Survey

FFP

Option Year 4: September 1, 2017 through August 31, 2018

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4001AA

40
Each
OPTION
Site Survey

FFP

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4001AB

9
Each
OPTION
Site Survey

FFP

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4002AA

15
Each
OPTION
CED 1B12-Acs - Oven, Rotary, Roll-in,

FFP

Single Rack, Electric

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4002AB

12
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4002AC

12
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4002AD

3
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

4002AE

3
Each
OPTION
CED 1B12-Acs, Oven, Rotary, Roll-in,

FFP

Single Rack, Electric - INSTALLATION

Outside the Continental United States (OCONUS)

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4002AF

3
Each
OPTION
CED 1B12-Acs, Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Electric

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AA

8
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AB

7
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AC

7
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AD

1
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AE

1
Each
OPTION
CED 1B12-Bcs - Oven, Rotary, Roll-in,

FFP

Single Rack, Gas - INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4003AF

2
Each
OPTION
CED 1B12-Bcs - Racks for

FFP

Oven, Rotary, Roll-in, Single Rack, Gas

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

4004AA

23
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4004AB

21
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4004AC

21
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4004AD

2
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4004AE

2
Each
OPTION
CED 1B15cs - Oven/Proofer, Mini-Rotary

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4005AA

2
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4005AB

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4005AC

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4005AD

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4005AE

1
Each
OPTION
CED 1B20-Acs, Proofer, Roll-In, One-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4006AA

24
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

Option Year 4: September 1, 2017 through August 31, 2018

Manufacturer: _________________________________

Model: _______________________________________

Warranty Period: _______________________________

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4006AB

20
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4006AC

20
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Within the Continental United States (CONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4006AD

4
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

DE-INSTALLATION - Remove & Dispose

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

4006AE

4
Each
OPTION
CED 1B20-Bcs, Proofer, Roll-In, Two-Door

FFP

INSTALLATION

Outside the Continental United States (OCONUS)

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
50
Each
OPTION
Shipping Charges

FFP

Option Year 4: September 1, 2017 through August 31, 2018

In accordance with the Addendum to 52.212-1 - Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific location(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill.

Note: Contractors will be responsible for all shipping arrangements associated with direct delivery to Alaska and Hawaii commissaries identified in the delivery orders.

ESTIMATED

ADDENDUM TO 52.212-1

ADDENDUM TO 52.212-1

INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

I. SUBMISSION OF OFFERS: [(Reference Paragraph (b)]

a. Proposals are to be submitted to the Defense Commissary Agency, LEAE, Attn: Trina Barnes, 1300 E. Ave, Fort Lee, VA 23801-1800. Faxed, scanned or e-mailed copies will be accepted. Email proposals to Ms. Barnes at trina.barnes@deca.mil or fax it to 804-734-8009 ext. 78348. The complete proposal with authorized representative’s signature must be received by the closing date and time. Offerors are also required to be registered in the Central Contractor Registration (CCR) database and System for Award Management (SAM) (https://www.acquisition.gov) to be eligible for award. The CCR database is accessed through SAM.

b. Product Information: The Offerors shall submit descriptive literature, a matrix, or other information that demonstrates that the proposed products meet or exceeds all the required generalized operating specifications of the Commissary Equipment Descriptions (CEDs): 1B12-Acs, 1B12-Bcs, 1B15cs & 1B20-Acs & 1B20-Bcs.

c. Offerors must have updated on-line representations and certifications at ORCA, https://www.acquisition.gov. The offerors only need to complete paragraph (b) (2) of FAR 52.212-3 and submit with their proposal. North American Industry Classification System (NAICS) Code applicable to this solicitation is 333241 and the Size Standard is 500. Per FAR 4.1201(a): Prospective contractors SHALL complete electronic annual representations and certifications (Reps & Certs) at ORCA accessed via https://www.acquisition.gov in conjunction with required registration in the Central Contractor Registration (CCR) database. Your Reps and Certs must include the NAICS applicable to this solicitation document and indicate your organization’s business size status.

Per 13 CFR 121.106 – If the size determination is based on the number of employees, the method for determining business size status is based on the average number of employees of the concern (including part-time and full-time employees of its domestic and foreign affiliates), which is based upon the number of employees for each of the pay periods for the preceding completed 12 calendar months. [Additional definition is available by searching 13 CFR.121 at http://www.gpoaccess.gov/cfr/index.html]

d. Past Performance References: Submit at least 5 references; companies that you have conducted business with over the last five years for delivery of products that are similar to those listed in this solicitation. Provide by email the following information for each reference to Trina Barnes, trina.barnes@deca.mil no later than July 8, 2013:

(1) Company Name and Address

(2) Point of Contact Name and Title

(3) Phone Number

(4) Facsimile Number

(5) E-Mail Address

(6) Description of Product Delivered

The references will be asked to provide information on your company’s past performance with regard to timeliness of delivery, quality, and business relations. The contracting officer will contact the references provided to obtain this information. Any other past performance information available to the contracting officer will also be considered.

e. Price: Provide your best price for each line item and enter the total price for the maximum quantity for each line item. Enter all pricing for the base and option years. Offerors shall not include shipping in the price of any CLIN.

f. Shipping Costs: DO NOT price shipping CLINs. We will use $1,000.00 as a place holder for systems purposes once the contract is awarded. Prior to placing delivery orders, the Government will contact the vendor for shipping cost for specific locations(s). The vendor will be paid for actual shipping charges supported by a copy of the prepaid freight/shipping bill attached to the invoice in Wide Area Workflow (WAWF).

II. The period for acceptance of offers is changed to 90 days.

ADDENDUM TO 52.212-4

ADDENDUM TO 52.212-4

TERMS AND CONDITIONS – COMMERCIAL ITEMS

The following paragraphs have been changed/added to FAR 52.212-4 Terms and Conditions – Commercial Items.

1. Administrative Modifications:

The government may issue unilateral written modifications that do not affect the substantive rights of the parties. Examples of administrative modifications are corrections in the payment office address or changes to the accounting and appropriation data.

2. Payment Procedures:

a. Funding will be provided on individual delivery orders. Payment will be made by Defense Finance and Accounting Service (DFAS). Contract payments will be processed electronically via EFT through the Defense Finance and Accounting Service (DFAS). Prior to DFAS releasing any contract payment, the contractor must submit an invoice COMBO using Wide Area Work Flow (WAWF) electronic commerce. An invoice COMBO is used to invoice for supplies or services and enables the vendor to create a separate invoice and receiving report from the same data entry session, eliminating the need to re-key data. After an invoice COMBO is received, a Government representative will acknowledge acceptance and receipt of the service via WAWF. After all items are properly submitted, the contract payment will be processed via DFAS electronically.

b. The contractor must access the WAWF Vendor Tools on the DFAS website and complete the requirements to obtain an active WAWF account. This will allow the contractor to submit invoices via WAWF so that payments can be processed electronically through EFT.

c. For additional WAWF information, see clause 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008).

d. Clause FAR 52.213-1, FAST PAYMENT PROCEDURE (MAY 2006), applies only to shipments destined for locations outside the continental U.S. (See 5 below.)

3. Period of Performance:

Base Year:

September 1, 2013, or date of award if later, through August 31, 2014

Option Year 1:

September 1, 2014 through August 31, 2015

Option Year 2: September 1, 2015 through August 31, 2016

Option Year 3: September 1, 2016 through August 31, 2017 Option Year 4: September 1, 2017 through August 31, 2018

5. Delivery:

Delivery orders will be issued and accessed through the Electronic Document Access System (EDA) http://eda.ogden.disa.mil. Contractors must complete the on-line registration available at the website in order to retrieve documents displayed there.

Delivery is required 30 days after receipt of delivery order. Delivery to commissaries shall be made between the hours of 7:00 am and 3:00 pm local time, Monday through Friday, excluding official Government Holidays. Delivery orders will contain the delivery location and any other necessary delivery instructions. The contractor can find the delivery address and points of contact information for each store at www.commissaries.com

6. Shipping:

Some delivery locations may require packaging and preparation for overseas shipment, but the contractor is responsible only for shipment to the port except Alaska and Hawaii, (See Shipping CLINs). Equipment destined for overseas shipment will be wrapped, blocked, and braced using best commercial practices so that the equipment arrives at destination without damage. Each Outside Continental United States (OCONUS) delivery order will include packing and marking instructions to the shipping port specified in the order. The contractor shall mark each shipment with the name of the contractor, contract number, and requisition number.

7. Be advised that this contract will be posted on http://www.commissaries.com/business/contracting.cfm at two distinct points during the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .