HDEC04-12-R-0011 Potential Offeror Questions and Answers 2.doc
DOC document 27 KB Posted
- Attached to
- Furnish and Install Grocery Shelving
- Solicitation number
- HDEC0412R0011
- Issued by
-
Defense Commissary Agency
About this file
Questions Answers 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HDEC04-12-R-0011 REVISED ATTACHMENT A LAYOUT.xls | XLS spreadsheet | |
| HDEC0412R0011 0003.doc | DOC document | |
| HDEC0412R0011 0002.doc | DOC document | |
| Revised Sample Sketch HDEC04-12-R-0011.xls | XLS spreadsheet | |
| Worksheet in Sample Sketch.xls | XLS spreadsheet | |
| HDEC04-12-R-0011 Shelving Amend 0001.doc | DOC document | |
| HDEC04-12-R-0011 Worksheet in Sample Sketch.xls | XLS spreadsheet | |
| 0412R0011 Shelving.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HDEC04-12-R-0011
FURNISH AND INSTALL STORE SHELVING
Potential Offeror Questions and Answers #2 March 13, 2012
1. Q: Are aluminum tags required rather than the plastic?
A: Plastic
2. Q: Are aluminum tags figured for the base or left off to accommodate ESL tabs?
A: Left Off for ESL tags.
3. Q: The new sketch still does not match the SOW. SOW calls for 4 column Kits and the sketch calls for 9. Sketch still call for 16 end caps and 16 waterfalls.
A: 9 is correct. 8 slopes and 8 contoured back end caps.
4. Q: Please advise depth of base shelves and also advise if you want wrap around upper shelves what depth and how many?
A: 26" Base Wrap around for ends caps 4 per end cap, 24".
5. Q: Referencing Potential Offeror Q & A on # 10. The question referred to end panels, but the response was end displays. Normally both are used on a gondola but there is no reference to end panels in this solicitation. End Panels are not the same as end displays.
A: Yes, end panels are needed for every gondola and wall.
6. Q: Referencing # 20 on Offeror Q & A. Do you want the installation company to have someone show up 1 week early to receive fixtures or will the store personnel be receiving the fixtures? Please clarify because this is a huge impact on the installation companies pricing.
A: No, Government will receive all equipment to be used.
installation company will verify equipment with government representative once on site for all equipment needed to perform work and check for damages.
7. In your response on Q # 7 it stated that all the shelves will be 22" for the alcove but on the amended sketch it shows 50-22" and 50 -24" Bread wire. Does this mean that you also want 5-22" standard uppers per section quoted as well?
A: No