Data_Analysis_Encl6_QASP_14Jan14.docx
DOCX document 22 KB Posted
- Attached to
- Global Combat Support System - Joint (GCSS-J) Data Applications and Integration Analysis Support Federal contract opportunity
- Solicitation number
- HC1047-14-R-4012
- Issued by
- Defense Information Systems Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Cost_-_Price_Template_GCSS_v2.xls | XLS spreadsheet | |
| HC1047-14-R-4012-0001.pdf | ||
| Attachment_4_-_GCSSJ_DATA_ANALYSIS_QA_AMD01.pdf | ||
| Attachment_3_-_GCSSJ_Data_Analysis_PPQ.pdf | ||
| Appendix_A_(DAR).pdf | ||
| HC1047-14-R-4012.pdf | ||
| Attachment_4_-_GCSSJ_DATA_ANALYSIS_QA.pdf | ||
| Attachment_2_-_Cost_-_Price_Template_GCSS.xls | XLS spreadsheet | |
| Attachment_6_-_GCSSJ_DATA_ANALYSIS_-_Subcontractor.pdf | ||
| Attachment_1_DD254.pdf | ||
| GCSSJ_Data_Analysis_DRFP_QA.pdf | ||
| Attachment_8_Key_Personnel.pdf | ||
| Attachment_5_-_GCSSJ_DATA_ANALYSIS_-_Past_Performance.pdf | ||
| Attachment_7_-_GCSSJ_DATA_ANALYSIS_-_CLIENT_AUTH.pdf | ||
| Appendix_B_ICD.pdf | ||
| HC1047-14-R-4012_DRAFT.doc | DOC document | |
| PWS_data_analysis_v3.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title GCSS-J Data Applications & Integration Analysis Support
2. Work Requirements
· Task 1 – Enterprise IT Policy and Planning
· Task 2 – Engineering Activities
· Task 3 – Technical Tasks
3. Primary Method of Surveillance: Periodic Inspection will be the primary method of surveillance. The contractor is required to prepare and submit bi-weekly status reports providing the status of monitoring of quality assurance configuration management, security management progress and program reviews
4. Scope of Performance: The contractor shall provide engineering, technical, and program support services required under the task areas as described in Section 6 of this PWS. The scope of this effort will span the breadth of the GCSS-J mission which is to provide enhanced decision support and situational awareness to the warfighter. The contractor shall perform the role of Subject Matter Expert (SME) and have an intimate knowledge of Joint Doctrine and the Joint Capability Areas (JCA) defined in joint Pub 4.0.
5. Performance Standards:
| Task |
| Subtask/Activity |
| Performance Standard |
| Method of Surveillance |
| Performance Objective |
| Acceptable Quality Level (AQL) |
| Incentive |
6.1 Task 1
6.1.1 Subtask 1.1, 6.1.2 Subtask 1.2, Activity
1.2.2, and 6.2.4 Subtask 2
| Must achieve completion of tasks as scheduled 95% of the time |
| Daily observation, monthly financial reports and bi-weekly written reports |
| Completion of tasks as scheduled |
| Must achieve completion of tasks as scheduled 90% of the time |
| Positive/ |
Negative CPARS
| 6.2 Task 2 |
| 6.2.8 Subtask 6 |
| Must achieve completion of tasks as scheduled 95% of the time |
| Daily observation, monthly financial reports and bi-weekly written reports |
| Completion of tasks as scheduled |
| Must achieve completion of tasks as scheduled 90% of the time |
| Positive/ |
Negative CPARS
| 6.2 Task 2 |
| 6.2.4 Subtask 2; 6.2.5 Subtask 3, 6.2.6 Subtask 4, and 6.2.3 |
| Must provide inter-contract support 95% of the time |
| Daily observation, monthly financial reports and bi-weekly written reports |
| Quality inter-contract support |
| Must provide inter-contract support 90% of the time |
| Positive/ |
Negative CPARS
6. Mandatory or regulatory compliance items: The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer’s Representative (COR) and the contracting officer (KO) will evaluate the initial submission. The COR and KO will conduct ad hoc reviews of the contractor’s compliance throughout the remainder of the contract.
7. Acceptable Quality Level (AQL):
The contractor must achieve performance standards 90% of the time.
8. Evaluation Method:
· Bi-Weekly written reports
· Monthly financial reports
· Daily inspections
9. Incentives (Positive and/or Negative): Positive/Negative CPARS Enclosure 6, Page 1 of 1 Pages 17Jul2013/Version 2