HC101322QA379-0001.v1.pdf
PDF 8 KB Posted
- Solicitation number
- HC101322QA379
- Issued by
-
Defense Information Systems Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _HC101322QA379-0002_v1 Contents.zip | ZIP file | |
| Vendor Block Diagram Sample and Maps.pdf | ||
| HC101322QA379.v1.pdf | ||
| 2.5GB ADDITIONAL TECH SG21APR227376.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IQO INQUIRY
FM: PL8211
TO: Contractors
DATE (MM/DD/YYYY): 9/8/2022
SUBJECT: HC101322QA379-0001 Amend: 0001
A. TYPE ACTION: ADMIN AMEND
1. PURPOSE: HC101322QA379-0001 ISSUED TO:
1. CHANGE PROPOSAL DUE DATE TO 09/15/2022.
2. CHANGE SERVICE DATE TO 12/15/2022.
3. RELAX THE RTD SPEC TO 12 SECONDS OR LESS.
M. ADDITIONAL INFORMATION:
3. TSR NUMBER: SG21APR227376
4. CCSD: DIYU6CU1
Z. DITCO CONTACT:
John Beckman
618-418-6082 john.e.beckman.civ@mail.mil
Dale L. Rupright
DITCO Contracting Officer
HC101322QA379-0001
Unless otherwise specified, all other terms and conditions are unchanged.
Paragraph E.SERVICE DATE change from:
Nov 14, 2022
To:
Dec 15, 2022
Paragraph M.10.TESTING REQUIREMENTS change from:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 2.5GB.
LINE CODE: NRZ.
FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).
1. TEST AND ACCEPTANCE: FIBER OPTIC 2.5GB WAVE CIRCUITS SHALL PASS A FULLY DOCUMENTED
SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8691, (D) 418-8691.
2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE FOLLOWING PERFORMANCE
REQUIREMENTS ON A MONTHLY BASIS. PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-
DIVERSE/NON-PROTECTED AVAILABILITY: GREATER THAN OR EQUALTO 99.5% OR BETTER. MONTHLY SHORT
INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%. ERRORED SECONDS (ES): LESS THAN OR
EQUAL TO 0.005%. SEVERELY ERRORED SECONDS (SES): LESS THAN OR EQUAL TO 0.00035. BACKGROUND BLOCK
ERROR RATIO (BBER): LESS THAN OR EQUAL TO 5 X 10-6. BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP):
LESS THAN OR EQUAL TO 1 PER 72 HOURS. JITTER: SEE NOTE 1 (JITTER). BER: LESS THAN OR EQUAL TO 1X10-12.
DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) * WHERE "D" IS THE SDP TO SDP TRANSMISSION
DISTANCE, MEASURED SHORTEST GREAT CIRCLE, IN KILOMETERS.
3. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-
Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE
TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL
NOTIFY DITCO IMMEDIATELY IN WRITING.
To:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 2.5GB.
LINE CODE: NRZ.
FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).
1. TEST AND ACCEPTANCE: FIBER OPTIC 2.5GB WAVE CIRCUITS SHALL PASS A FULLY DOCUMENTED
SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8691, (D) 418-8691.
2. THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE FOLLOWING PERFORMANCE
REQUIREMENTS ON A MONTHLY BASIS. PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-
DIVERSE/NON-PROTECTED AVAILABILITY: GREATER THAN OR EQUALTO 99.5% OR BETTER. MONTHLY SHORT
INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%. ERRORED SECONDS (ES): LESS THAN OR
EQUAL TO 0.005%. SEVERELY ERRORED SECONDS (SES): LESS THAN OR EQUAL TO 0.00035. BACKGROUND BLOCK
ERROR RATIO (BBER): LESS THAN OR EQUAL TO 5 X 10-6. BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP):
LESS THAN OR EQUAL TO 1 PER 72 HOURS. JITTER: SEE NOTE 1 (JITTER). BER: LESS THAN OR EQUAL TO 1X10-12.
DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) * WHERE "D" IS THE SDP TO SDP TRANSMISSION
DISTANCE, MEASURED SHORTEST GREAT CIRCLE, IN KILOMETERS.
3. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE
CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-
Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 12 MILLISECONDS TO EFFECTIVELY SUPPORT THE
GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE
TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA IE161 WILL
NOTIFY DITCO IMMEDIATELY IN WRITING.
Paragraph V.QUOTE DUE DATE AND TIME change from:
Aug 15, 2022 4:00:00 PM CDT
To:
Sep 15, 2022 4:00:00 PM CDT
File details come from the government source that posted it. Updated .