About this file

SOLICITATION DETAILS INCLUDING EXAMPLES

View the file

Other files

File Type Posted
-_HC101318QA243-0002.v0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQO INQUIRY

FM: PL8211

TO: Contractors

DATE (MM/DD/YYYY): 5/3/2018

SUBJECT: HC101318QA243-0002 Amend: 0002

A. TYPE ACTION: ADMIN AMEND

1. PURPOSE: PURPOSE OF AMEND 0002 IS AS FOLLOWS:

1. CHANGE THE PURPOSE TO READ; "START A COMMERCIAL LEASE USING THE IQO

CONTRACT BETWEEN IN BLDG 310 RM 101; 310 EAGLE WAY DOVER AFB, DE 19902 AND

BLDG 308 RM 203; 5450 CARLISLE PIKE, MECHANICSBURG, PA 17050-0975."

A. REQUIRE VENDOR TO DELIVER 1.0GB ETHERNET INTERFACE (OPITCAL

HANDOFF-1000BASE-LX-SINGLE MODE FIBER) AT THE DROP SIDE OF THE COMMERCIAL

DEMARC'S AT THE "A" AND "Z" LOCATIONS.

B. ADD VENDOR WIRING EXTENSION RESPONSIBILITY FOR DOVER LOCATION; "VENDOR IS

RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE FROM THE LINE

SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE

JUNIPER MX-240 ROUTER SUITE (UJEWDOV040) BLDG 639, ROOM ITB TO THE DROP SIDE

OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION PANEL BLDG 310,

ROOM 101 USING SINGLE MODE FIBER. COORDINATE TYPE CONNECTORS TO BE USED

FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL."

2. ESTABLISH NEW QUOTE DUE DATE OF 4 JUN 18.

3. EXTEND THE SERVICE DATE TO 4 SEP 18.

***ORIGINAL SOLICITATION***

1. SUBMIT A QOUTE TO PRIVIDE. INSTALL. AND MAINTAIN A 1GB ETHERNET LEASE

BETWEEN 639 ATLANTIC AVE DOVER AFB, DE 19902 TO5450 CARLISLE PIKE,

MECHANICSBURG, PA 17050-0975.

A. ESTABLISH TSP.

B. CUSTOMER WILL ACCEPT EARLIEST POSSIBLE SERVICE DATE.

2. EACH CONTRACTOR IS RESPONSIBLE FOR READING AND COMPLYING WITH ALL

TECHNICAL ASPECTS OF THIS SOLICITATION, TO INCLUDE READING AND AGREEING

WITH THE STANDARD PROVISIONS, ATTACHMENTS LISTING SPECIFIC TECHNICAL

REQUIREMENTS, PRICE QUOTE REQUIREMENTS, AND REQUESTED SERVICE DATE.

FAILURE TO READ AND ADHERE TO ANY PORTION OF THE INQUIRY SHALL RENDER THE

QUOTE NON-COMPLIANT AND RESULT IN IT BEING EXCLUDED FROM EVALUATION AND

AWARD.

HC101318QA243-0002

3. THE SERVICE DATE TO BE MET IS 4 AUG 18 (SIP). THE GOVERNMENT ASSUMES THAT

CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY IMPACT THE SERVICE DATE.

THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW

STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR

COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS.

4. CONTRACTORS SHALL SUBMIT QUOTES IAW STANDARD PROVISION 04.

QUOTES SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD

NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER,

THEY MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THE CONTRACTOR

INTENDS TO MEET THE REQUIREMENT. IN RESPONSE TO THIS SOLICITATION, NO

TERMS OR CONDITIONS PLACED UPON THE GOVERNMENT, NOR ASSUMPTIONS WILL BE

ACCEPTED. CONTRACTORS ARE ENCOURAGED TO SUBMIT QUESTIONS AND REQUEST

CLARIFICATIONS OF THE REQUIREMENT (S) BEFORE SUBMITTING QUOTES. QUESTIONS

SHALL BE SUBMITTED TO CONTRACT SPECIALIST AND CONTRACTING OFFICER DURING

THE SOLICITATION PHASE ONLY, AND RESPONSES FOR ALL INTERESTED PARTIES WILL BE

POSTED TO FEDBIZOPPS. QUOTES MUST BE UPLOADED TO IDEAS. IN THE EVENT IDEAS IS

UNAVAILABLE OR QUOTES FAIL TO UPLOAD, QUOTES MAY BE SENT TO THE FOLLOWING

MAILBOX:

DISA.SCOTT.DITCO.MBX.VENDOR-QUOTES@MAIL.MIL

5. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH SOLICITATION

HC101318QA244/TSR RU18OCT175672 AND MUST BE ENGINEERED AND PROVISIONED

TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS

(SDP) FROM TSR RU18OCT175672; MEANING THE PHYSICAL PATHS ARE TOTALLY

SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER

BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION

FROM TSR RU18OCT175672.

6. CONTRACTOR SHALL PROVIDE COLOR POWERPOINT DRAWINGS SHOWING THE ROUTES

FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING CENTRAL OFFICES AND/OR

WIRING CENTERS, ENSURING THE PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE

BEING MET. DRAWINGS MUST INCLUDE SEPARATION DISTANCES, TOTAL FIBER MILES

AND ROUND TRIP DELAY BASED ON ACTUAL DISTANCE IN MILES. REFER TO STANDARD

PROVISION 39 FOR SPECIFIC DOCUMENTATION REQUIREMENTS. SAMPLE DRAWINGS ARE

INCLUDED THE ATTACHMENTS.

7. PRE AWARD SITE SURVEYS ARE AUTHORIZED (AT CONTRACTOR EXPENSE) WITH LOCAL

POCS AT EACH GOVERNMENT SITE. IT IS HIGHLY RECOMMENDED THAT AT A MINIMUM,

CONTRACTORS CONDUCT PHONE SURVEYS TO ADEQUATELY ASSESS THE MAGNITUDE OF

THE WORK TO BE PERFORMED IN DETERMINING THEIR PRICE STRATEGY.

M. ADDITIONAL INFORMATION:

3. TSR NUMBER: RU20OCT175673C

4. CCSD: BBBB

Z. DITCO CONTACT:

Kevin Knowles

(618)229-9527 kevin.l.knowles4.civ@mail.mil

Paul A. Heard

DITCO Contracting Officer

Unless otherwise specified, all other terms and conditions are unchanged.

Paragraph E.SERVICE DATE change from:

Aug 4, 2018

To:

Sep 4, 2018

Paragraph V.QUOTE DUE DATE AND TIME change from:

Apr 4, 2018 4:00:00 PM CDT

Jun 4, 2018 4:00:00 PM CDT

Location A, UNIQUE INSTALLATION FACTORS change from:

1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

(2) TELCO MULTIPLEX (COMMERCIAL FIBER POINT OF PRESENCE) COMMERCIAL CARRIER SYSTEM (LOCAL

EXCHANGE CARRIER) PORT: TBD BY LOCAL CARRIER

(3) OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED)

(4) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED)

AMPLIFYING INFO:

A. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF THE SERVICE FROM THE LINE SIDE OF

THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX-240 ROUTER SUITE

(UJEWDOV040) BLDG 639, ROOM ITB TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL BLDG 639, ROOM ITB USING SINGLE MODE FIBER. COORDINATE TYPE CONNECTORS TO

BE USED FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.

B. VENDOR MUST COORDINATE WITH GOVERNMENT SITE PERSONNEL TO CONDUCT WALK THROUGH SITE

SURVEYS FOR EXACT CABLE FT. FROM THE DISA PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE

JUNIPER MX-240 ROUTER SUITE BLDG 639, ROOM ITB THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 310, ROOM 101.

C. VENDOR MUST PROVIDE FIBER STRANDS FROM THE DISA PROVIDED FIBER PATCH PANEL INSTALLED IN THE

ASR 9010 ROUTER TO THE COMMERCIAL DEMARC LOCATION WITHOUT SPLICING AND OR USE OF CONNECTORS

TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND

MUST BE CONTINUOUS.

D. VENDOR MUST SCHEDULE/COORDINATE WITH THE POC'S LISTED ON THIS ORDER 72 HOURS IN ADVANCE PRIOR

TO SITE SURVEYS OR INSTALLATIONS.

(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

EXCHANGE CARRIER)

THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE JUNIPER MX-240 ROUTER SUITE

(UJEWDOV040) BLDG 639, ROOM ITB TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL BLDG 310, ROOM 101 USING SINGLE MODE FIBER.

COORDINATE TYPE CONNECTORS TO BE USED FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.

JUNIPER MX-240 ROUTER SUITE BLDG 639, ROOM ITB THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 310, ROOM 101.

TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE

CONTINUOUS.

Location A, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:

CPIWI-NO/CPIWM-NO

CPIWI-YES/CPIWM-YES

Location B, UNIQUE INSTALLATION FACTORS change from:

(1) OPTICAL INTERFACE CARD (GFE)(DISA IE1 PROVIDED)

(2) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, DISA IE4

(3) FIBER TERMINATING PATCH PANEL (GFE)(DISA IE1 PROVIDED)

(4) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

A. DISA IE4 IS RESPONSIBLE FOR INSTALLATION AND GSM-O FOR SERVICE FROM THE INTERFACE CARD

INSTALLED IN THE ROUTER TO THE DROP SIDE OF THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL.

COORDINATE TYPE OF CONNECTORS.

B. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF 1GBE SERVICE FROM THE LINE SIDE OF

THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT

OF PRESENCE FIBER DISTRIBUTION PANEL. COORDINATE TYPE CONNECTORS TO BE USED FOR TERMINATION TO

THE DISA PROVIDED PATCH PANEL.

C. THE CIRCUIT MUST BE TAGGED WITH THE LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO. AT THE LINE SIDE OF

THE DISA PROVIDED FIBER TERMINATING PATCH AND AT THE DROP SIDE OF THE VENDOR'S FIBER DISTRIBUTION

PANEL INSTALLED IN THEIR COMMERCIAL SUITE. ADDITIONALLY, VENDOR MUST SHOW SITE PERSONNEL LISTED

ON THIS ORDER THE EXACT TERMINATION POINT WHEN SERVICE IS COMPLETE.

(1) FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE, SINGLE-MODE, 1310NM, TELCO

EXCHANGE CARRIER)

THE DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN THE ASR 9010 ROUTER SUITE

(UJEWMECH030) BLDG 308, ROOM 203 TO THE DROP SIDE OF THE COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL BLDG 308, ROOM 203 USING SINGLE MODE FIBER. COORDINATE TYPE CONNECTORS

TO BE USED FOR TERMINATION TO THE DISA PROVIDED PATCH PANEL.

ASR 9010 ROUTER SUITE BLDG 308, ROOM 203 TO THE COMMERCIAL FIBER POINT OF PRESENCE BLDG 308, ROOM

203.

TO CONNECT 2 OR MORE FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE

CONTINUOUS.

Location B, INSIDE WIRE INSTALLATION / MAINTENANCE REQUIRED change from:

CPIWI-NO/CPIWM-NO

CPIWI-YES/CPIWM-YES

Add the Following:

STANDARD PROVISION - 52 - APPROVED PRODUCTS LIST - JAN 2018

Department of Defense (DoD) Instruction 8100.04, DoD Unified Capabilities, (December 9, 2010), establishes governing policy for products and services that support and connect to the DoD Information Network (DoDIN). DoDI 8100.04 also sets forth instructions that are implemented by the Defense Capabilities Requirement (formerly the Unified Capabilities Requirement document) and the DoDIN Approved Products List (APL). VENDOR/TELECOMMUNICATIONS PROVIDER (TP) must list all equipment the TP or any subcontractor will use at the point of interface with the Government's network. The Government will evaluate the TP's list of equipment at the point of interface with the Government's network to ensure the TP proposes only equipment compliant with the DoDIN APL. A TP's failure to list equipment used at the point of interface with the Government's network, or inclusion of equipment not on the DoDIN APL, may result in the TP being deemed not technically acceptable.

Additionally, during the period of performance and contract administration, the TP is required to ensure the TP and all subcontractors use only equipment that conforms to DoDIN APL requirements at the point of interface with the Government's network. Also during performance, TP must update the Government whenever equipment is changed at the point of interface with the Government's network, and must further provide an updated list of equipment at least once per year.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."

NOTE: All fiber routes are fictitious and used only as an example.

:'t\ •

N

Scott AFB / 2.5GB Wave Service

- TSR SG25FEB160001 / Bldg 1575, 103 West Losey Street, Scott AFB, IL – DECC St Louis

- TSR SG25FEB160002 / Bldg 1575, 103 West Losey Street, Scott AFB, IL – Offutt AFB

DWDM

Kretschmer Ave Belleville ,IL

CLLI: BLVLILAD

Belleville, IL

DWDM

Vendor CO 1015 Locust Str St Louis, IL

CLLI: STLSMOPL

St Louis, MO

Vendor CO 125 Main Street Collinsville, IL

CLLI: CLSVILAB

Collinsville, IL

4300 Goodfellow Blvd, Bldg 103 Frame room, 1st Fl

CLLI: DCSTMODE

DECC ST Louis

103 W Losey Str Bldg 1575 Room C-1B

CLLI: SPFDILMR

Springfield, IL

Vendor Gateway 1045 River Ave St Joseph, MO

CLLI: STJSMOFR

St Joseph, MO

Vendor CO 1514 Chandler Road West

CLLI: BLLVNEBL

Bellevue, NE

901 SAC Blvd Bldg 501 Room U-127

CLLI: OAFBNEAR

Offutt AFB

Scott AFB – Offutt AFB Estimated Fiber Miles: 522 Estimated RTD: 8.3ms

Scott AFB – DECC St Louis Estimated Fiber Miles: 36 Estimated RTD: 1ms

103 W Losey Str Bldg 1575 Room C-1B

CLLI: SCABILDE

Scott AFB

DWDM

On-net

On-net

On-net

On-net

Legend:

Prime vendor: Sub-vendor B:

Sub-vendor A: Sub-vendor C:

NOTE: Vendor must indicate whether they are on-net with optical equipment at the demark locations. If not, vendor must provide the precise fiber distance from the nearest Servicing Wire Center (SWC) or Central Office (CO) where the service will be delivered from. Vendor is not authorized to deviate or change any technical parameters from the order without permission from the government.

NOTE: All addresses are fictitious (except end locations) and used only as an example.

UPDATED ADDITIONAL REQUIREMENTS FOR HC101318QA243

TELECOMM PROVIDER MUST PROVIDE TOTAL FIBER MILES AND ROUND

TRIP DELAY (RTD) FROM THE CUSTOMER "A" LOCATION TO THE CUSTOMER

"Z" LOCATION.

THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY

DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS

(SDP'S) FROM TSR RU18OCT175672; MEANING THAT THE PHYSICAL PATHS

ARE TOTALLY SEPARATE INCLUDING MAN HOLES, CONDUIT, (CENTRAL

OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM

MUST HAVE 50 METERS PHYSICAL SEPARATION FROM TSR RU18OCT175672.

VENDOR MUST PROVIDE LIGHT LEVEL

READINGS (DB LOSS) ON EXTENSION FROM COMMERCIAL POP TO GOVERNMENT

SERVICE DELIVERY POINT (SDP) AT THE "Z" LOCATION PRIOR TO

CIRCUIT TURN UP TO THE GOVERNMENT ENSURING LEVELS ARE WITHIN

SPECS. LIGHT LEVELS MUST BE ADJUSTED TO 5 TO -13.

VENDOR MUST CONDUCT WALK-THROUGH SITE SURVEY PRIOR TO

INSTALLATION AT THE "Z" LOCATION ONLY.

VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE

COORDINATION AND ACTIVATION PROCESS. (C) 618-220-8627 (D)

770-8627

PROVIDER MUST CONDUCT A SATISFACTORY 72 HOUR TEST FROM THE

DROP SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN

THEIR EQUIPMENT SUITE AT THE "A" LOCATION TO THE GOVERNMENT'S SDP

AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE

COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP AT THE "Z" LOCATION.

VENDOR MUST ENSURE A TEST SET IS PLACED AT THE DROP SIDE OF

TELECOMM PROVIDER'S OR LOCAL ACCESS PROVIDERS FDP AS APPLICABLE

AT THE "A" LOCATION AND A SECOND TEST SET AT THE END OF THE FIBER

JUMPERS TO BE USED FOR TERMINATION TO THE GOVERNMENT'S SDP AT

THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER

TO THE GOVERNMENT FOR ACCEPTANCE TESTING.

TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW

THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564 FOR AN ADDITIONAL 48 HOURS.

1. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:

(A) FIBER TERMINATION: FRAME FORMAT: 1.0GB ETHERNET (OPITCAL

HANDOFF-1000BASE-LX-SINGLE MODE FIBER), 802.3Z, 1310NM. "SC"

CONNECTORS;

(B) COMMITTED INFORMATION RATE (CIR) - 1GB.

(C) 1.0GB ETHERNET FRAMING REQUIRED AT COMMERCIAL DEMARC AT THE A

AND Z LOCATIONS.

(D) NO NETWORK INTERFACE UNIT, DEDICATED PATH

(E) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE

ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS

IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION

RATE (CIR) IAW ITU-T-Y.1564 FOR AN ADDITIONAL 48 HOURS

(G) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24

HOURS A DAY, SEVEN DAYS PER WEEK, AT LEAST 99.5% OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECIEPT OF

TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY

CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER.

(K) TELECOMM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND

ADMINISTRATION MONITORING OF ETHERNET CIRCUIT IAW ITU-T-Y.1731.

(L) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE

GOVERNMENT BY THE DISA GOC IP BACKBONE ENGINEERING AND

IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-220-8627 (D)

770-8627

(M) VENDOR MUST PROVIDE:

1. THE LONG-HAUL CIRCUIT NO. AND LEC CKT ID'S AS APPLICABLE TO

THE DISA IE161 PROGRAM OFFICE PRIOR TO TURN UP TO THE GOVERNMENT.

PRIMARY: RAY BURKE (301) 225-2550 ALTERNATE: KEN DIEF (301)

225-2416.

2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF 1GBE SERVICE IAW THE UNIQUE INSTALLATION FACTORS.

3. INSIDE WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION

FACTORS.

4. VENDOR MUST COORDINATE SITE

VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING ACCESS TO

FACILITIES AT BOTH USER LOCATIONS.

5. ALL EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE

TO THE DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP,

SCOTT AFB, IL. PRIMARY: (C) 618-220-9950, (D)770-9950 TOLL FREE:

855-868-9950

6. DD FORM 1368 WILL BE SUBMITTED ON THIS TRUNK IAW DISAC-DITCO

350-135-1 BY RNSOC, SCOTT AFB, IL. GUIDANCE ON SUBMISSION IS

AVAILABLE AT <HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP>

CLICK ON "DISA-DITCO CIRCULAR, 350-135-1, DEFENSE COMMERCIAL

COMMUNICATIONS ACQUISITION PROCEDURES."

MINIMUM TECHNICAL SPECIFICATIONS:

SPECIFIC FORMAT TO BE USED IS:

LINE RATE: 1.0709 GIGABITS/S, +- 100 PPM LINE CODE: OPTIC

1. TEST AND ACCEPTANCE: FIBER OPTIC 1.0GB CIRCUITS SHALL PASS A

FULLY DOCUMENTED SATISFACTORY 24 HOUR SOAK TEST BY DISA GOC AT

SCOTT AFB, IL. PRIMARY: (C) 618-229-8691 (D) 779-8691;

2. TESTING PARAMETERS AND THRESHOLDS: THE FOLLOWING TESTING

PARAMETERS SHALL BE MEASURED DURING TEST AND ACCEPTANCE TESTING.

ERROR PERFORMANCE SHALL BE MEASURED AND RECORDED OVER THE

DURATION OF THE CONTIGUOUS 24 HOUR TESTING INTERVAL AND SHALL BE

MEASURED AND RECORDED PER DEFINITION IN ITU-T-Y.1564.

3. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE

FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY

SHALL BE GREATER THAN 99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL

TO ZERO WHEN TESTING AT 1.0 GIGABIT HIGHEST FRAME RATE, AND SHALL

MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE LESS THAN 3 MSEC.

DELAY SHALL BE BETTER THAN 10 MSEC

4. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE

GREATER THAN 24 HOURS.

5. ROUND TRIP DELAY (RTD): RTD SHALL BE MEASURED OVER THE 1GB

WAVE CIRCUIT AND SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS.

IMPLEMENTATION ASSISTANCE: FOR DISN CORE / DEDICATED / NIPRNET /

SIPRNET / VPN CIRCUIT ACTIVATION ASSISTANCE OR SERVICE IMPLEMENTA

TION INQUIRIES/SCHEDULING, CONTACT THE DISA GLOBAL RF ACTIVATIONS

TEAM VIA EMAIL, DISA.SCOTT.CONUS.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL

.MIL, OR CALL DSN 770-8627; COML 618-220-8627.

DD FORM 1368: DD FORM 1368'S (MODIFIED USE OF LEASED

COMMUNICATION FACILITIES), OR EMAIL EQUIVALENT, WILL BE

SUBMITTED, AS REQUIRED, ON THIS CIRCUIT IAW DISAC-DITCO 350-135-1

BY THE STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO. GUIDANCE

ON SUBMISSION IS AVAILABLE AT

HTTP://WWW.DITCO.DISA.MIL/CORPORATELIBRARY/HOME.ASP. CLICK ON

"350-135-1, DEFENSE COMMERCIAL COMMUNICATIONS ACQUISITION

PROCEDURES."

FACILITY SECURITY ACCESS REQUIREMENT: (SP A) ESCORT REQUIRED;

(SP B) ESCORT REQUIRED;

(SP C) ESCORT REQUIRED;

(SP D) ESCORT REQUIRED;

COMPLETION REPORT: SERVICE WILL BE ACCEPTED ON BEHALF OF THE U.S.

GOVERNMENT BYDISA GOC IP B/D312-770-8627,C618-220-8627 WHO WILL

SUBMIT A COMPLETION REPORT IAW DISAC 310-130-1, CHAP 2 OF DISAC

310-70-1, CHAP 8. REPORT WILL BE ADDRESSED TO THE ORIGINATOR AND

ALL ADDRESSEES OF THIS TSO.

- Vendor Sample Maps_Version2.pdf
Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
- Vendor Block Sample_Version2.pdf
Scott AFB / 2.5GB Wave Service�- TSR SG25FEB160001 / Bldg 1575, 103 West Losey Street, Scott AFB, IL – DECC St Louis�- TSR SG25FEB160002 / Bldg 1575, 103 West Losey Street, Scott AFB, IL – Offutt AFB

File details come from the government source that posted it.