Hammocks Beach State Park Cow Channel Dredging.pdf
PDF 144 KB Posted
- Attached to
- Cow Channel Dredging - Hammocks Beach State Park
- Solicitation number
- SCO ID #06-06920-03A
- Issued by
- Orange County, Teachey Town, North Carolina
About this file
This is a Notice to Bidders issued by the North Carolina Department of Natural and Cultural Resources, Division of Parks and Recreation, for dredging work at Hammocks Beach State Park in Swansboro, North Carolina. The project involves furnishing labor, material, and equipment for dredging approximately 42,000 cubic yards of material from Cow Channel to a maximum depth of 8.00 feet below mean lower low water level, with beneficial oceanfront placement material to be placed on the ocean side beach of Bear Island behind a temporary berm. An open pre-bid meeting will be held on Wednesday, June 24, 2026, at 1:00 pm at the Hammocks Beach State Park Visitors Center, with attendance optional. Sealed proposals will be received until 3:00 pm on Wednesday, July 22, 2026, at the Park Visitors Center, 1572 Hammocks Beach Road, Swansboro, NC 28584, attention to Park Superintendent Sarah Kendrick. Complete plans, specifications, and contract documents are available for inspection at Hammocks Beach State Park, Andrew Consulting Engineers, and multiple plan rooms, and may be obtained by qualified prime bidders upon deposit of $200.00 in cash or certified check, with full refund provided upon return of documents in good condition within ten days after the bid date.
All proposals shall be lump sum bids for single prime contracts, and bidders must include the Identification of Minority Business Participation form with either Affidavit A or Affidavit B as applicable, with failure to complete these forms resulting in bid rejection. Bidders must submit a cash deposit or certified check equal to not less than five percent (5%) of the proposal amount, or alternatively, a bid bond of five percent (5%) of the bid executed by a North Carolina-licensed surety company. A performance bond and payment bond equal to one hundred percent (100%) of the contract price will be required. Payment will be made based on ninety-five percent (95%) of monthly estimates with final payment upon completion and acceptance of work. General contractors must hold an Unlimited Building Contractor license classification as required under North Carolina General Statutes Chapter 87, Article 1. All work must comply with requirements of the North Carolina Department of Environmental Quality Divisions of Water Resources and Coastal Management, the United States Army Corps of Engineers, and all other state and federal regulations. The designer is Andrew Consulting Engineers, P.C., and the owner's representative is Dwayne A. Parker.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hammocks Beach State Park Cow Channel Dredging Rebid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCO-Notice To Bidders 2010 – (Updated Dec. 2010)
N O T I C E TO B I D D E R S
NC DNCR, Division of Parks & Recreation Hammocks Beach State Park Cow Channel Dredging
Hammocks Beach State Park Swansboro, NC
SCO ID #06-06920-03A
Code: 42214 Item: 425034
Sealed proposals will be received by the North Carolina Department of Natural & Cultural Resources Division of Parks and Recreation for the state of North Carolina, at Hammocks Beach State Park Visitors Center, 1572 Hammocks Beach Road Swansboro, NC 28584, attention to the office of Sarah Kendrick, Park Superintendent. Bids will be accepted up to 3:00 pm Wednesday July 22, 2026, and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment entering into the construction of dredging approximately 42,000 cubic yards of material from Cow Channel to a maximum depth of 8.00 feet below mean lower low water level.
Beneficial oceanfront placement material will be placed on the ocean side beach of Bear Island behind a temporary berm to prevent direct discharge into the Atlantic Ocean or other body of water or wetland. Beneficial oceanfront placement work must comply with all requirements of the State of North Carolina Department of Environmental Quality Divisions of Water Resources and Coastal Management, the United States Army Corps of Engineers, as well as all other state and federal regulations.
Bids will be received for single prime. All proposals shall be lump sum.
Pre-Bid Meeting An open pre-bid meeting will be held for all interested bidders on Wednesday June 24, 2026 at 1:00 pm at Hammocks Beach State Park Visitors Center. The meeting will address project specific questions, issues, bidding procedures and bid forms. Pre-bid attendance is not mandatory.
Complete plans, specifications and contract documents will be open for inspection in the offices of Hammocks Beach State Park and Andrew Consulting Engineers and in the plan rooms:
Construction Connect (constructionconnect.com, 877-761-4347)
Dodge Construction Network (construction.com, 877-784-9556)
Carolinas Plan Room (carolinasplanroom.com, 910-392-5500)
East Coast Digital Planroom - Minority Plan Provider (speedyblue.com, 252-758-1616)
May be obtained by those qualified as prime bidders, upon deposit of Two Hundred dollars ($200.00) in cash or certified check. The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date.
If a contractor is bidding under the dual system both as a single prime contractor and as a separate prime contractor, he must submit the bids on separate forms and in separate envelopes. Bidders should clearly indicate on the outside of the bid envelope which contract(s) they are bidding.
SCO-Notice To Bidders 2010 (Updated Dec. 2010)
NOTE: The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.)
All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades.
General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Unlimited Building Contractor.
NOTE--SINGLE PRIME CONTRACTS: Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a “general contractor” and shall be so licensed. Therefore, a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. EXCEPT: On public buildings being bid single prime, where the total value of the general construction does not exceed 25% of the total construction value, contractors under GS87- Arts 2 and 4 (Plumbing, Mechanical & Electrical) may bid and contract directly with the Owner as the SINGLE PRIME CONTRACTOR and may subcontract to other properly licensed trades. GS87-1.1- Rules .0210
Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law.
A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price.
Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work.
No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days.
The owner reserves the right to reject any or all bids and to waive informalities.
Designer:
Andrew Consulting Engineers, P.C.
3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403
(910) 202-5555
Owner:
NC Department of Natural and Cultural Resources Division of Parks and Recreation
Owner's Representative:
Dwayne A. Parker Project Manager http://www.nclbgc.org/pages/LawNReg.pdf
| Complete plans, specifications and contract documents will be open for inspection in the offices of Hammocks Beach State Park and Andrew Consulting Engineers and in the plan rooms: |
| Construction Connect (constructionconnect.com, 877-761-4347) |
| Dodge Construction Network (construction.com, 877-784-9556) |
| Carolinas Plan Room (carolinasplanroom.com, 910-392-5500) |
| East Coast Digital Planroom - Minority Plan Provider (speedyblue.com, 252-758-1616) |
| May be obtained by those qualified as prime bidders, upon deposit of Two Hundred dollars ($200.00) in cash or certified check. The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within... |
File details come from the government source that posted it. Updated .