PERFORMANCE WORK STATEMENT

FOR THE PROCURMENT, INSTALLATION AND MODIFICATION

FOR THE COMBAT CRAFT LITE

1. Background. 1ST Marine Raider Battalion (1st MRB) requires contractor services to conduct modification of existing Government owned Combat Craft Light (CCLs).

2. Scope. This Performance of Work Statement (PWS) establishes all requirements to provide after- market modification services to obtain complete and usable CCLs in support of operational requirements.

3. Description of Areas. All work will be accomplished at 1st MRB Boat Facility bldg. 210562.

4. Tasks

4.1. Combat Craft Lite

4.1.1. Contractor shall replace the standard handle bars with (6) Titanium handle bars.

4.1.2. Contractor shall remove and replace (12) stock mirrors with 12 custom-made brackets. The brackets will be made of rust resistant metal and in accordance with 1st MRB specifications provided.

4.1.3. Contractor shall provide (6) all black rescue boards and (8) three point harnesses to attach the rescue boards.

4.1.4. Contractor shall provide tubing, brass fittings, brass ball valves and all other materials and tools required to divert engine water to flow to handle grips and foot area. This will allow the CCL operator to use the engine water on demand for warming of hands and feet.

4.1.5. Contractor shall remove all items from the CCL and apply Line-X material to provide a stronger protection to the hull of the CCL.

4.1.6. Contractor shall provide GPS custom mounts. The contractor is responsible to provide all materials and tools required for the wiring and installation of GPS units provided by the Government. All connectors shall be water proof.

4.1.7. Contractor shall install a second battery provided by the Government.

5. Deliverables

5.1. The contractor shall provide all of items below in support of the CCL modifications.

Quantity
Unit Of Issue
Part Number
Item Description
6
KT
15-URJ-01
Rule bilge full assembly kit with hoses, hardware
6
PR
15-URJ-02
Handlebars
12
EA
15-URJ-03
GPS custom mounts and installation of units, 2 per vessel
6
EA
15-URJ-04
Black Rescue Boards with 1 spare set of port/starboard stabilizers per board. Dimensios are 62” x 36” x 45”. 10 handles, 750 lbs break strength on handles.
14
EA
15-URJ-05
GPS plastic Mounts to hold unit in place on mounts
6
EA
15-URJ-06
Heavy Duty main Power Supply Switch for Battery
6
EA
15-URJ-07
Dual Battery Wiring Kit, wiring harness
6
EA
15-URJ-08
Custom fabricated Battery box
6
EA
15-URJ-09
Adaptor T Piece for dual battery breather hose
6
EA
15-URJ-10
Spare fuse kit for secondary battery
12
EA
15-URJ-11
Handlebar grips
6
EA
15-URJ-12
Holder mounting bracket for glove cowling box to protect immobilizer key and affix switches to
6
EA
15-URJ-13
Rescue board 3 point harness to stern of PWC
24
EA
15-URJ-14
Hand Hold Anchor points with backing plates and hardware
6
EA
15-UR-15
Vessel preparation for Line-x covering, post and pre-production and assembly/re-assembly
6
EA
15-URJ-16
Line-X undercoating for vessel hull bottom deck
6
EA
15-URJ-17
Non-slid Upholstery for front and aft seat
6
EA
15-URJ-18
Upper Helm Unit kit 2’ tubular aluminum
6
EA
15-URJ-19
Lower Helm Assembly aluminum
6
EA
15-URJ-20
Emergency Lanyard Kits port side helm fixed position
6
EA
15-URJ-23
Cooling water lines diverted forward to helm/foot position and fittings/hoses
6
EA
15-URJ-24
Shut off cooling line valves for towing PWC fast, 2 per craft, with custom fabricated holding brackets, brass fittings
6
EA
15-URJ-25
Custom transducer fabrication mount for stern of craft, corrosion proof, waterproofing of electrical wiring
6
EA
15-URJ26
Custom Fabrication of a corrosion proof lifting bracket anchor points on port/starboard gunwales
6
EA
15-URJ-27
Traction Mat sheet 3M backing 86” in length ¼” thick
6
EA
15-URJ-29
Latch and seat fastener kit
6
EA
15-URJ-32
Waterproof on/off switch with mountain bracket and hardware

6. Special Requirements for Assembly and Installation

6.1. The Contractor shall supply all tools and supplies required for the installation to provide a complete, intelligible and usable system.

6.2. With the exception of the rescue boards, the contractor shall ensure equipment is firmly held in place. Fastenings and supports shall be adequate to safely support their operation in accordance with manufacturer‘s instructions.

6.3. The Contractor shall remove all debris, packing material, boxes and crates from premises.

6.4. All equipment and associated hardware shall be fabricated and installed in accordance with manufacturer‘s specifications, recommendations and in a manner consistent with best practices and standards adopted by related industries.

6.5. All wiring connections shall be accomplished using solder type wire connectors with heat shrink with quick disconnect.

7. Contractor Qualifications

7.1. Contractor shall have 10 + years of Personal Water Craft (PWC) modification experience on specific make of PWC (Kawasaki).

7.2. Contractor must have 10+ years' experience working with the military on PWC operations for rescue and tactical operations. Contractor shall have experience and knowledge with Helocasting A PWC and sling loading.

8. Testing and Acceptance. The test procedures will involve the contractor and Amphib personnel launching CCL’s and testing them in the open ocean for no less than three hours at high speed and conducting numerous surf passages.

8.1. Upon correcting the deficiencies in the list items, the Contractor shall notify the Government representative/designee that the system is ready for final performance test of system installation. All system functions shall be tested for proper operation and quality assurance. Contractor’s invoices cannot be approved until equipment and workmanship have been accepted by the Government.

9. Training The Contractor shall provide a minimum of (8) hours training to selected facility personnel. Instruction shall include operation of the navigation systems, corrective and preventative maintenance of each system‘s equipment.

9.1. Training shall be coordinated between the Government representative and the Contractor shall be scheduled to ensure selected facility personnel receive required training.

10. Warranty. The Contractor shall warrant all furnished equipment and services from defects in material and workmanship for a one (1) year period from date of Government acceptance. Equipment or workmanship found to be defective shall be replaced and service re-worked by the Contractor at no additional cost to the Government.

10.1 The Contractor shall replace defective equipment and install replacement equipment at no additional cost to the Government.

10.2. The Contractor shall provide warranty service during normal business hours Monday through Friday between 7:30 AM and 4:30 PM. After the Contractor is contacted by the Government representative, the Contractor shall respond within 24 hours for non-emergency calls and four (4) hours for emergency calls.

10.3. The Contractor shall coordinate all facility service visits with the Government representative to establish a mutual understanding of Contractor‘s arrival date and time.

11. Government Furnished Facilities.

11.1. All work will be accomplished at 1st MRB Boat Facility bldg. 210562. Camp Pendleton, CA 92055.

12. Work Hours. 0730 (7:30 AM) - 1630 (4:30PM), Monday thru Friday (excluding federal holidays).