About this file
This document contains questions and answers regarding solicitation number H92240-22-T-0014 for cage lockers. Naval Special Warfare Command requires the contractor to purchase and install new cage lockers in one building according to the performance work statement. The contractor must also move and reconfigure used cages from one building to another. Attachments include pictures of existing cages and site conditions as well as a map showing the distance between buildings. The government intends to award a firm-fixed-price contract in response to this solicitation for cage lockers from United States Special Operations Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 - BLDG Distance.pdf | ||
| Attachment 1 - Performance Work Statement 4.8.22.pdf | ||
| Attachment 4 - Cage Picture in BLDG 123.pdf | ||
| Attachment 5 - Picture of Electrical in BLDG 127.pdf | ||
| H92240-22-T-0014 AMENDMENT 1.pdf | ||
| Attachment 1 - Performance Work Statement.pdf | ||
| H92240-22-T-0014 Cage Lockers.pdf | ||
| Attachment 2 - BLDG 123 Room 101.pdf | ||
| Attachment 3 - BLDG 127 First Floor.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| H92240-22-T-0014 Cage Lockers | |||
| Questions and Answers | |||
| Question Number | Document and Section Referenced | Question | Government Response |
| 1 | N/A | Could you please provide pictures of the existing lockers that are to be removed and re-installed? | See Attachment 4 - Cage Picture in BLDG 123 |
| 2 | Attachment 1 - Product Description, Section 4.1.1.1. | Would 4 gauge or 8 gauge diamond mesh be acceptable? | Please adhere to the requirement outlined in the PWS. |
| 3 | Attachment 1 - Product Description, Section 4.1.1.1. | Would 2” square mesh be acceptable? | Please adhere to the requirement outlined in the PWS. |
| 4 | Attachment 1 - Product Description, Section 4.2.1.1. | Will the ceilings in the cages need to be installed after they are relocated? | The ceilings of the cages in BLDG 123 shall be relocated and installed in BLDG 127. |
| 5 | N/A | Are there any images available of the existing site conditions? | See Attachment 4 - Cage Picture in BLDG 123 and Attachment 5 - Picture of Electrical in BLDG 127, for a better idea of the site conditions. |
| 6 | N/A | Do you have a site map that shows the distance to travel from building 123 to building 127? | See Attachment 6 - BLDG Distance |