Attachment_III_-_Questions_and_Answers.docx

DOCX document 12 KB Posted

Attached to
High Bay Storage Platforms Federal contract opportunity
Solicitation number
H92240-19-Q-2028
Issued by
United States Special Operations Command

View the file

Other files for this federal contract opportunity

Other files attached to High Bay Storage Platforms, newest first.
File Type Posted
H92240-19-Q-2028_-_Rack_Storage.doc DOC document
H92240-19-Q-2028_-_Rack_Storage_-_AMD_1.pdf PDF
H92240-19-Q-2028_-_Rack_Storage.doc DOC document
Attachment_1_-_Product_Description.docx DOCX document
Attachment_2_-_High_Bay_Schematics.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions/Answers regarding Solicitation H92240-19-Q-2028 High Bay Storage Platforms

- The Govt provided a current floor plan showing the existing cages and building columns, but in the mezzanine spec. the Govt did not mention that the mezzanine must cantilever all the way back to the building walls and be framed around all existing building columns. This adds more cost and labor, and in not specifying some vendors may not provide.

Pictures could be provided if needed.

- Does the Govt requires drawings with the quote? If so, would a conceptual drawing suffice? Does it have to be a CAD engineered drawing?

The Govt believes that this as an equipment buy not a building modification.

- After PO, standard approval drawings will be provided before fabrication begins. Are standard approvals acceptable OR will NAVFAC require P & E VA stamped engineering drawings?

The Govt understands that this is not considered a modification to the building, but only an equipment purchase. NAVFAC will be involved.

- ALL framing must be structural steel correct? No C roll formed members allowed?

Correct

- Is the contractor responsible for unloading materials?

If the material is brought to the building via flatbed and palletized, the vendor can unload and stage behind the building near the high bay.