Amendment_0002.pdf

PDF 330 KB Posted

Attached to
Satellite Internet Services Federal contract opportunity
Solicitation number
H92240-16-T-0066
Issued by
United States Special Operations Command

About this file

Amendment 0002 - Responses to RFI's

View the file

Other files for this federal contract opportunity

Other files attached to Satellite Internet Services, newest first.
File Type Posted
Amendment_0001.pdf PDF
H92240-16-T-0066.pdf PDF
Attachment_1_-_PWS_SCI.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT -0002 - THE PURPOSE FOR THIS AMENDMENT IS TO ANSWER ALL REQUEST FOR INFORMATION (RFI's).

The Response date of 13 June 2016; 10:00 am (PST) remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H92240-16-T-0066

X 9B. DATED (SEE ITEM 11)

19-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2016

CODE

NAVAL SPECIAL WARFARE COMMAND - N01C

ATTN: CYNTHIA URIAS

2000 TRIDENT WAY; BLDG 624

SAN DIEGO CA 92155-5583

H92240 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

H92240-16-T-0066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

REQUEST FOR INFORMATION (RFI’s): H92240-16-T-0066 (Satellite Internet Services)

Answers to all RFI’s

1. PWS 4.3: How many square feet of buildings and outdoor space need to be Wi-Fi accessible?

Estimated at 1000 SQ FT

2. PWS 4.2: Is there an existing cement pad available in close proximity to Building 60066 for the antenna install?

Yes

3. PWS 4.3: Will there be space reserved for network equipment associated with the sitcom terminal inside building 60066?

Yes

4. PWS 4.5: Is the Contractor expected to remove the equipment at the end of the contract?

Yes

5. PWS 4.1: The PWS requirements include unlimited data on a network capable of providing up to 5120 Kbps x 1024 Kbps. What is the government’s required MINIMUM throughput speeds? In order to properly engineer and price a network, Contractors will need the minimum speeds required by the government and will assume a maximum requirement of 5120 Kbps x 1024 Kbps based on the current PWS language.] Addressed in PWS 4.1

6. PWS 4.3: Does the gov’t require any specific wireless security standards?

Yes, WPA2 The requirements as written in the PWS are a little generic. The PWS states:

7. 4.1 The contractor shall install a remote satellite terminal that will connect via satellite with a network operations facility in order to provide internet services capable of up to 1024kbps upload and 5120kbps download with a daily unlimited allowance with a static routable IP address.

Address in PWS.

8. 4.2 The contractor shall ensure antennas and associated equipment are installed with all mounting hardware in a safe manner. Addressed in PWS.

9. 4.3 Would you be able to offer some more background information for clarification? Is this to be a primary or secondary connection?

Primary connection for this service

10. 4.4 Is this to be a VSAT satellite solution only? Does the Government have a preference for any antenna solution?

No preference. As long as services are provided via satellite

11. 4.5 Is this to be a non-penetrating or fixed mount solution?

Fixed mount

12. 4.6 Are there any required IFL cable runs? What is that distance?

Yes, no further than 100 meters

13. 4.7 Will the contractor be allowed to conduct any site surveys prior to installation?

Yes

14. 4.8 Will this be a satellite modem delivery or will there be back office integration?

Modem delivery

15. 4.9 In Section 4.1. of the PWS, the bandwidth requirements are listed as:

a) The contractor shall install a remote satellite terminal that will connect via satellite with a network operations facility in order to provide internet services capable of up to 1024kbps upload and 5120kbps download with a daily unlimited allowance with a static routable IP address. Addressed in PWS.

b) Do the upload and download rates of the internet services need to be dedicated to this effort, or can the resources be pooled, or shared with other customers?

Dedicated, not pooled

16. 4.10 In reference to section 4.3. The contractor shall install high speed commercial satellite internet access in building 60066 and immediate outdoor areas with the BUD/S compound through secured wireless access points, is the contractor to provide the hardware (access points), or is contractor simply providing the satellite internet access to those access points? If contractor is to provide the access point hardware, is contractor to configure and/or manage those access points and what is the intended coverage area dimensions?

No further than 100 meters

17. Will Government provide transportation to the San Clemente Island from nearest Metropolitan area? Yes

18. Is there Civilian transport to the island? No

19. Is there an intended location of the satellite dish? Yes

a. Roof, ground, etc.? Ground, concrete pad.

20. SOW item 4.2: To comply with the requirement 4.2, a site survey is strongly recommended; will an opportunity to perform a site survey be granted? Yes

a. If a site survey is not available can you describe and define the area available of satellite dish installation? Will shore power be available? Yes

b. Will we need to dig and trench? No

c. Will permits be required? No

21. SOW item 4.3: Please confirm if the contractor is to interface with customer furnished wireless access points or is the contractor to supply the wireless access points? Contractor supply

a. If so what is the desired radial distance of wireless coverage from building 60666? 100 feet

22. SOW item 4.3: Please confirm the High-speed Commercial Internet solution desired is for access to the Public internet, and does not require a private IP network back-haul to an NSWC Point of Presence.

Confirmed. No back-haul

23. SOW item 5.1: As work will take place on the island are berthing facilities available for contractor personnel during installation and testing. No

24. SOW item 6.1: May we ship product, tools and equipment to the island Yes

25. SOW 7.1: Is commercial transportation available to the island? Or will the military provide transportation? No. Military transportation will have to be coordinated.

26. Can you please provide pictures and or drawings of the building and locations internal and external where antennas can be placed. Yes. Upon request.

27. Please specify how many simultaneous users the wireless access points should support?

Up to 30.

28. Is contractor responsible for the installation of all cabling or is there existing Ethernet cabling for wireless access point installation? Yes. No existing cabling

29. Can the satellite antenna be installed on the roof of the building using a non-penetrating mount? Yes, but prefer existing concrete pad.

30. How large is the area outdoors that will need wireless access points? 1000 square feet

31. Is there existing penetrations/access to allow for cable runs from the satellite antenna into the building? Yes

32 Does the site provide standard stable 110VAC Power? Yes

33. Is the building environmentally controlled such that indoor rated equipment can be utilized?

Yes

34. Will the Government provide transport of the installation team and equipment from Los Angeles to San Clemente Island? No

35. PWS Section 4.3 (page 1): Is the contractor required to provide the secured wireless access points? Yes,

a. If so, can the Government provide the coverage area dimensions of the wireless access points and the dimensions of Building 60066? Approximately 1000 square feet

36. Concerning the shipment of equipment to San Clemente. Are we to send all our materials, freight and supplies required to complete the PWS/ SoW to the 32nd street barge location in San Diego? If yes, will Government be responsible for shipping of equipment including cost to San Clemente and off-load equipment at the destination work site in San

Clemente? Coordination with the government will take place in order to barge equipment.

37. Is concrete available on-island for purposes of foundation installation? If yes, can

NAVSOC supply additional information on expected cost? Not necessary as a concrete pad exists for installation.

38. Will the winning contract be allowed to stay in Naval lodging during the installation phase? If yes, what is the cost for lodging? No

39. Will NAVSOC provide access to a telephone with long distance capability during the installation? Yes

40. Please provide additional information on how personnel will get to San Clemente. If this requires being transported on Government vehicle, please identify the government costs for this service. Coordination with government air.

41. Will the installation team have base privileges such as NEX, galley, MWR store while working in San Clemente? No

42. Is car rental available on San Clemente? If yes what are the rates? No

43. Is there a PWD contractor on island that could help if digging or trenching is required?

No

44 What type of AC power is going to be provided? 110V 60Hz

a. IS this power protected from outages? Yes

45. Is the indoor location for the satellite equipment climate controlled, Is the location in a controlled area? Yes

46. Is there a layout of Building 60066? Yes

47. What type building material are the interior walls of building 60066? Block, sheetrock…..Plan for all types.

48. What will be the most common Wi-Fi device used on the network? This answer will help determine best Access Point. Tablets, mini tablets

49. Are there any requirements for Ethernet access? Is yes how many devices? Yes, would like to have the option.

50. Can NAVSOC provide a google map or overhead picture be provide of the outside area wanted to be cover by the WI-FI? Yes

51. How many concurrent devices are required to be supported on the Wi-Fi? Up to 30