Attachment_3_-_QASP.doc
DOC document 119 KB Posted
- Attached to
- Vertical Wind Tunnel Support Services Federal contract opportunity
- Solicitation number
- H92240-16-T-0062
- Issued by
- United States Special Operations Command
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Wage_Determination.docx | DOCX document | |
| Attachment_5_-_ELIN_List.xlsx | XLSX spreadsheet | |
| Attachment_4_-_RFQ_Pricing_Matrix.xls | XLS spreadsheet | |
| H92240-16-T-0062_Amd01.docx | DOCX document | |
| Q A_Responses_7Jun16.docx | DOCX document | |
| Attachment_1_-_PWS.docx | DOCX document | |
| H92240-16-T-0062_Final_Solicitation.docx | DOCX document | |
| Attachment_1_-_PWS.docx | DOCX document | |
| Attachment_2_-_Wage_Determination.docx | DOCX document | |
| Attachment_4_-_RFQ_Pricing_Matrix.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) Naval Special Warfare Command Vertical Wind Tunnel Hours and Coaching 4 May 2016
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Vertical Wind Tunnel Frefall Simulator Time (West Coast), dated 4 May 2016. This plan sets forth the procedures and guidelines Naval Special Warfare Command will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results. Note that the QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Naval Special Warfare to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR) and the contractor. If assigned, the CO will designate one COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
Assigned KO: Ms. Jennifer Williams Organization or Agency: USSOCOM NAVSOC NSWC N01C Telephone: (619) 537-1363 Email: jennifer.williams@navsoc.socom.mil
2.2 The Contracting Officer’s Representative
The COR if assigned is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 Program Manager
The Program Manager (PM) provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf.
Assigned PM: Mr. Mark S. Boyd Organization or Agency: USSOCOM NAVSOC NSWG1 Telephone: (619) 537-3118
Email: mark.boyd@navsoc.socom.mil
2.4 Contractor Representative
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (This section to be completed after contract award)
Program Manager - <upon award, enter name>
Telephone: <enter number>
Email: <enter address>
Task Manager - <upon award, enter name>
Telephone: <enter number>
Email: <enter address>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable>
Title: <enter title>
Telephone: <enter number>
Email: <enter address>
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS (Attachment #1 to the solictiation), and in Appendix #1, “Performance Requirements Summary” attached hereto. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)
· Random monitoring, which shall be performed by the COR.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to theCOR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified below.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Appendix #1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall performance.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Appendix #1 hereto.
5.2 Monitoring Forms
The Government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms attached hereto. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each quarter, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Appendix #2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Quarterly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO.
APPENDIX 1: PERFORMANCE REQUIREMENTS SUMMARY
| Performance Objective |
| Performance Standard |
(and AQL) Method of Performance Assessment
| Provide timely notification for instructor substitution requiring Government action. |
| No more than 10 days to report to the Government for Instructor substitution. |
| Review requirements and qualifications. |
| Provide all equipment necessary to conduct training to include a suitable training site(s), training media (video playback), and all training materials to includewind tunnel suits, parachute rigs, helmets and googles for each student. |
| 100% of the time through duration of the contract NLT 30 minutes prior to the scheduled start time of the training block. |
| Review site, schedule, curriculum and media. Use of Pre-training checklist. |
| Properly maintain all equipment and facilities. |
| 100% of the time through duration of the contract. |
| Review course records. |
| Maintain an orderly and professional atmosphere in all classroom settings. |
| 100% of the time throughout entire contract. |
| Review environment, training climate. |
| Provide timely notification of students who are having any performance problems. |
| Immediately (within 1 day) report to the Government. |
| Onsite observation or end of course review. |
| Report any disciplinary problems between contractor staff and military staff or student(s). |
| Immediately (within 1 day) report to the Government/COR. |
| Onsite observations or end of course review. |
| Report any security incident. |
| Immediately (within 1 day) report to the Government/COR. |
| Review course records. |
| Report any safety or training related problems, mishaps or accidents of any kind. |
| Immediately (within 1 day) report to the Government/COR. |
| Review documentation, After Action Reviews. |
APPENDIX 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check):
Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________
DATE: _________________
7 CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY FORMCHECKBOX
MAJOR FORMCHECKBOX
MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8 8. QUALITY ASSURANCE PERSONNEL (COR)
9 TYPED NAME AND GRADE
10 SIGNATURE AND DATE
11 9. ISSUING AUTHORITY
12 TYPED NAME AND GRADE
13 SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
FORMCHECKBOX
ACCEPTED FORMCHECKBOX
REJECTED
12. CLOSE DATE
| CUSTOMER COMPLAINT RECORD |
| DATE/TIME OF COMPLAINT |
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
[THIS PAGE INTENTIONALLY LEFT BLANK]
14 PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
15 4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 17 5. COR PHONE |
| 18 6. SUSPENSE DATE |
19 I. PERFORMANCE
7. FORMCHECKBOX
DEFICIENCY (CHECK ALL BOXES THAT APPLY)
FORMCHECKBOX
NEW
FORMCHECKBOX
REPEAT
FORMCHECKBOX
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
20 II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
21 III. ACTION CORRECTED
14. FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
[THIS PAGE INTENTIONALLY LEFT BLANK]
File details come from the government source that posted it. Updated .