Amendment 1.doc
DOC document 46 KB Posted
- Attached to
- Motorcycle Advance Training Program Federal contract opportunity
- Solicitation number
- H92239-11-T-0043
- Issued by
- United States Special Operations Command
About this file
Amendment 1-Response to Vendor Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| H92239-11-T-0043.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RESPONSE TO VENDOR QUESTIONS
Question 1. In the RFP on page 44 it talks about travel expenses as follows, "Travel expenses for CONUS/OCONUS travel will be covered as a separate cost reimbursable line item on the contract." There is no seperate CLIN listed for travel,, was it the intention of the contracting officer that each CLIN would have the travel for that location included in the "supplies and services" CLIN?
Response: AC3 Contractor Travel has been deleted. Pricing per course shall include all cost to include travel.
Question 2. If each option year CLIN is being priced with travel in FFP format will there be a way to adjust cost for each option year iaw Government Per Diem rates changing in the option years?
Response: The offeror's pricing shall include all cost to include travel. All changes or escalation in the outyears are determined by the offeror and will not be evaluated separately.
Question 3. CLIN 0001, The base year CLIN contains six sub CLINs AA through AF, should the offerer consider the PoP to be the fiscal year calendar or could conducts funded in FY11 continue to occur in fiscal year FY12? Also, is it possible that not all sub CLINs are awarded in the base year CLIN?
Response: 52.212-1 Adendum states: "The base period of performance is from the award date through 30 Sep 11. The scheduled classes for the base period are projected and may decrease after award due to the short period of performance. " The Government will determine what classes can be accomplished in FY11 based on the award date.
Question 4. If electronic submission is used to provide the offerers proposal will there be any form of electronic receipt verifying the receipt occurred on time?
Response: Offeror shall request confirmation after their electronic submission.
SECTION SF 1449 - CONTINUATION SHEET
The following have been deleted:
| AC3-CONTRACTOR TRAVEL |
| Official Travel of Contractor Personnel |
| JUL 2007 |
(End of Summary of Changes)
File details come from the government source that posted it. Updated .