AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

04/25/2017

REQUISITION/PURCHASE REQ. NO.

EQWPMA-17-0071

PROJECT NO. (If applicable)

NDC00256

6. ISSUED BY CODE MK 7. ADMINISTERED BY (If other than Item 6) CODE WPC

GSA, NCR, PBS,

Ofc of Design and Construction (WPC) 301 7th Streets, SW Room 2002 Washington, DC 20407

GSA, NCR, PBS,

Property Development Division (WPC) 301 7th Streets, SW Washington, DC 20407

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9.A. AMENDMENT OF SOLICITATION NO.

TO ALL PROSPECTIVE SMALL BUSINESS OFFERORS

(X)

GS11P17MKC0013

9B. DATED (SEE ITEM 11)

04/14/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return _____ copies to the issuing office with proposal.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).

The Request for Quotations is hereby amended as follows:

The following changes, clarifications, additions and supplements are hereby incorporated into this RFQ in their entirety as submitted. Continued on Page 2 of this Amendment Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Bonnie Echoles, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY .

(Signature of Contracting Officer)

16C. DATE SIGNED

04/25/2017

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

CONTINUATION OF SF 30: AMENDMENT OF

SOLICITATION/MODIFICATION OF CONTRACT

GS11P17MKC0013

Amendment No. 4

GS11P17MKC0013, DHS Temporary CRSO Trailer Complex, @ St. Elizabeths West Campus, SE, Washington, DC

ITEM A: PROPOSAL RECEIPT DATE, TIME and PLACE remain UNCHANGED:

Wednesday, May 10, 2017 by 12:00 PM, EST (NOON)

EMAIL SUBMISSION IS PREFERRED.

GSA is requesting that all proposals be submitted ELECTRONICALLY by the stated date and time. One completed set of the proposals (Cover Letter, Technical Volume, Price Volume) is to be submitted electronically to the attention of Ms. Chervette Whaley, Contract Specialist at chervette.whaley@gsa.gov with a cc: to Bonnie Echoles, Contracting Officer, at bonnie.echoles@gsa.gov. Proposals must be submitted and received on time to be considered.

This is a lowest priced technically acceptable (LPTA) procurement. No other individuals except those named above should receive your proposal submission. Failure to adhere to these requirements may render your submission non-responsive.

ITEM B: The following narrative is hereby incorporated and included to describe the LOD

LOCATION CLARIFICATION SKETCH (04/19/17) as issued under Amendment #3.

1. Limits of Disturbance (LOD) The area surrounding the location of the trailers is identified on the attached sketch dated 4/19/17. This LOD is to be delineated by the contractor in the field with orange snow fence type material. This is in addition any other tree protection that may be required. Although the area is called a LOD, it is not expected to be "disturbed" in its entirety but will allow some staging or stockpile area.

2. There will be 4 (four) temporary parking spaces for contractor employee/company vehicles in the vicinity of the trailers identified prior to construction start.

3. Two existing tree stumps in the LOD will be ground to be level with the surrounding grade by the Government prior to trailer installation.

ITEM C: DELETE the Davis Bacon Wage Determination as issued in the Solicitation and

INSERT the attached revised Davis Bacon General Decision Number: DC170002, MOD 2 dated 04/21/2017 in lieu thereof.

ITEM D: Offerors must acknowledge any and all amendments, giving amendment number and date, on offer form.

END OF AMENDMENT NO. FOUR

ATTACHMENT

Davis Bacon General Decision Number: DC170002, MOD 2 dated 04/21/2017 mailto:chervette.whaley@gsa.gov mailto:bonnie.echoles@gsa.gov

GS11P17MKC0013

General Decision Number: DC170002 04/21/2017 DC2

Superseded General Decision Number: DC20160002

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/06/2017

1 01/13/2017

2 04/21/2017

ASBE0024-007 10/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.03 15.32

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

ASBE0024-008 10/01/2016

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER.................$ 22.36 6.79

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems

ASBE0024-014 10/01/2016

GS11P17MKC0013

FIRESTOPPER......................$ 27.56 7.23

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

BRDC0001-002 05/01/2016

BRICKLAYER.......................$ 30.61 9.67

CARP0177-003 05/01/2016

CARPENTER, Includes Drywall

Hanging, Form Work, and Soft

Floor Laying-Carpet..............$ 27.81 9.93

CARP0179-001 05/01/2016

PILEDRIVERMAN....................$ 29.19 9.45

CARP0219-001 04/01/2016

MILLWRIGHT.......................$ 32.04 9.93

ELEC0026-016 11/07/2016

ELECTRICIAN, Includes

Installation of

HVAC/Temperature Controls........$ 44.15 16.47

ELEC0026-017 09/05/2016

ELECTRICAL INSTALLER (Sound

& Communication Systems).........$ 27.55 10.20

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata

GS11P17MKC0013

facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside

Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

ELEV0010-001 01/01/2017

ELEVATOR MECHANIC................$ 42.79 31.585+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas

Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for

6 months to 5 years of service as vacation pay credit.

IRON0005-005 06/01/2016

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 30.85 19.435

IRON0201-006 05/01/2016

IRONWORKER, REINFORCING..........$ 27.90 19.13

LABO0657-015 06/01/2015

LABORER: Skilled................$ 22.63 7.31

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand

GS11P17MKC0013

derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.

MARB0002-004 05/01/2016

MARBLE/STONE MASON...............$ 35.91 16.17

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement

(restoration work)

MARB0003-006 05/01/2016

TERRAZZO WORKER/SETTER...........$ 27.25 10.68

MARB0003-007 05/01/2016

TERRAZZO FINISHER................$ 22.46 9.75

MARB0003-008 05/01/2016

TILE SETTER......................$ 27.25 10.68

MARB0003-009 05/01/2016

TILE FINISHER....................$ 22.46 9.75

PAIN0051-014 06/01/2014

GLAZIER

Glazing Contracts $2 million and under...........$ 24.77 9.85

Glazing Contracts over $2

GS11P17MKC0013

million.....................$ 28.61 9.85

PAIN0051-015 06/01/2016

PAINTER

Brush, Roller, Spray and

Drywall Finisher............$ 24.89 9.15

* PLAS0891-005 07/01/2016

PLASTERER........................$ 28.83 6.05

* PLAS0891-006 02/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 27.65 10.08

PLAS0891-007 08/01/2016

FIREPROOFER

Handler.....................$ 16.50 4.89

Mixer/Pump..................$ 18.50 4.89

Sprayer.....................$ 23.00 4.89

Spraying of all Fireproofing materials. Hand application of

Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.

PLUM0005-010 10/01/2016

PLUMBER..........................$ 40.67 17.10+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's

Day, Martin Luther King's Birthday, Memorial Day and the

Fourth of July.

PLUM0602-008 11/01/2016

GS11P17MKC0013

PIPEFITTER, Includes HVAC

Pipe Installation................$ 39.89 20.52+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after

Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2016

ROOFER...........................$ 28.75 11.74

* SFDC0669-002 04/01/2017

SPRINKLER FITTER (Fire

Sprinklers)......................$ 34.40 19.24

SHEE0100-015 07/01/2016

SHEET METAL WORKER (Including

HVAC Duct Installation)..........$ 40.27 17.24+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's

Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUDC2009-003 05/19/2009

LABORER: Common or General......$ 13.04 2.80

LABORER: Mason Tender -

Cement/Concrete..................$ 15.40 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures

(restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement

GS11P17MKC0013

structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198

GS11P17MKC0013

indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

GS11P17MKC0013

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION