About this file
SOW Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AdvancedmeteringAmendment1.pdf | ||
| R7 Advanced Metering GSA Region 7 BAS_AMS SOW Pricing Break Out Worksheet.docx | DOCX document | |
| R7amendment.pdf | ||
| R7 Advanced Metering Contract Solicitation Question and Answer 8_3_2011.docx | DOCX document | |
| GS07P11JUC0113sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA Region 7 BAS / AMS Maintenance Contract Contract Scope Amendment (7/27/2011)
GSA Region 7 BAS / AMS Maintenance Contract Scope of Work, Page 1, Background.
“Contracts are currently in place and under way (outside of this contract) region-wide, to replace all existing AMS R2 JACEs with NiagaraAx® BAS/AMS JACEs, with the exception of 14 R2 AMS JACEs at the following sites: Seven Oklahoma sites, two El Paso sites, four New Orleans sites, one Las Cruces site.”
Shall be corrected to read:
Contracts are currently in place and under way (outside of this contract) region-wide, to replace all existing AMS R2 JACEs with NiagaraAx® BAS/AMS JACEs, with the exception of 10 R2 AMS JACEs at the following sites: Seven Oklahoma sites; two El Paso, Texas sites; and one Las Cruces, New Mexico site.
GSA Region 7 BAS / AMS Maintenance Contract Scope of Work, Page 1, Background.
“Maintenance of all existing R2 AMS JACEs, to include those in the aforementioned Oklahoma, El Paso, New Orleans and Las Cruces sites, shall take place during and after transitional status, when 70 R2 JACE sites will be upgraded to Ax JACE sites. Transitions of R2 JACEs to Ax JACEs are scheduled for completion by September 2012.”
Shall be corrected to read:
“Maintenance of all existing R2 AMS JACEs, to include those in the aforementioned Oklahoma, El Paso, and Las Cruces sites, shall take place during and after transitional status, when 74 R2 JACE sites will be upgraded or newly constructed Ax JACE sites. Transitions of R2 JACEs to Ax JACEs are scheduled for completion by September 2012.”
GSA Region 7 BAS / AMS Maintenance Contract Scope of Work Shall be added:
Fifteen (15) R2 JACE 403rev 515, and rev 522 to be provided as Government Furnished Equipment (GFE) with GSA R7 Specific org ID and Station ID.