JOFOC GS06T11BND0010 (Cox) Region 6.pdf
PDF 386 KB Posted
- Solicitation number
- GS06T11BND0010
- Issued by
-
GSA Federal Acquisition Service
About this file
This justification document supports the extension of a legacy telecommunications contract awarded to Cox for Region 6 services. The extension is necessary to provide agencies time to complete transition of over 600 active service instances from the incumbent contract to competitively awarded EIS task orders. Key agencies include DHS, DOT and FAA, with transition estimated through May 2026 due to COVID impacts, modernization complexities, and supply chain issues. Justification is provided under FAR 6.302-1 for sole-source extension to the incumbent through May 2026 to avoid service disruptions. The estimated value of the 27-month extension is $135,811.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
Contract GS06T11BND0010
Region 6 LSA
Applicable FAR Reference: 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements.
1. IDENTIFICATION OF THE AGENCY AND THE CONTRACTING ACTIVITY
This justification supports the extension of General Services Administration (GSA)’s Region 6
LSA telecommunications contract with Cox Kansas Telcom LLC (Cox), GS06T11BND0010.
Two of the user agencies with active services on this contract requiring this extension beyond the current end date in order to complete transition to their newly awarded contracts are:
-Department of Homeland Security (DHS), specifically the following components: Federal Law
Enforcement Training Center (FLETC), Federal Protective Service (FPS), Immigration and
Customs Enforcement (ICE), Transportation Security Agency (TSA), Federal Air Marshall’s
Service (FAMS), U.S. Coast Guard (USCG), and
-Department of Transportation (DOT), specifically Federal Aviation Administration (FAA)
The respective mission of each agency is noted below:
DHS is responsible for securing the nation's air, land, and sea borders to prevent illegal activity while facilitating lawful travel. The Department relies upon civilian network and internetwork service providers for vital communications services to support and carry out this mission. This mission is accomplished by many different operational and support components to achieve six overarching homeland security missions that make up DHS’s strategic plan which include:
Countering Terrorism and Homeland Security Threats; Securing U.S. Borders and Approaches;
Securing Cyberspace and Critical Infrastructure; Preserving and Upholding the Nation's
Prosperity and Economic Security; Strengthening Preparedness and Resilience; and
Championing the DHS Workforce and Strengthening the Department.
DOT’s mission is to deliver the world’s leading transportation system, serving the American people and economy through the safe, efficient, sustainable, and equitable movement of people and goods. Under the umbrella of DOT’s mission, FAA’s primary aim is to ensure the safety of air passengers, both military personnel and civilians. It promises to ensure that airway passengers reach their destination safely. The mission statement also highlights the efficacy of the aerospace system and makes it the best in the world.
The contracting activity is the General Services Administration (GSA) Federal Acquisition
Service (FAS) Information Technology Category (ITC), Office of Acquisition Operations, Interagency Contracts, 1800 F Street NW Washington, DC 20405. This document serves as a justification for other than full and open competition in accordance with FAR 6.302-1, “Only one
DocuSign Envelope ID: 40E82FAF-8419-4495-9D07-EED38DE5B45A responsible source and no other supplies or services will satisfy agency requirements”; justified and approved in accordance with FAR 6.303 and 6.304.
2. NATURE AND/OR DESCRIPTION OF THE ACTION BEING APPROVED
The action being approved is to extend the GS06T11BND0010 contract and any active Task or
Service Orders with Cox for 27 months, from its current expiration date of February 28, 2024 through May 31, 2026. This extension is necessary so that the agencies served by this contract will be able to conclude their transition to their competitively awarded Enterprise Infrastructure
Solutions (EIS) task orders (see Table 2, in Section 6). Additionally, this extension will align this contract’s expiration date with the expiration dates of GSA’s other legacy telecommunications contracts ending on May 31, 2026.
3. DESCRIPTION OF THE SUPPLIES OR SERVICES REQUIRED TO MEET THE
AGENCY’S NEEDS (including the estimated value)
The extension of the Region 6 LSA contract, GS06T11BND0010, is required to provide services for the agencies in the charts below that receive telecommunications services provided by Cox.
Specifically, this is for the sole purpose of providing additional time for these agencies to complete their transition to their previously awarded task orders under the EIS contract. The contract extension is not intended to be used for the order of new services.
Contract Ceiling: $10,000,000.00 Shared Ceiling among nine (9) Region 6 LSA
Contracts (ceiling increase required, see Section 7)
Expenditure to Date: $818,249.12
Monthly Cost: $5,030.04
Duration: 27 Months
Total Value of Extension: $135,811.08
LSA Region 6, GRITS II Contract: GS06T11BND0010
Contractor: Cox
Requiring Agency
Active Service
Instance Records
(SIRs) for Agency
Agency's Anticipated Date for
100% Disconnected
DHS
318 05/31/2026
DOT/FAA 301 05/31/2026
Table 1: Service Transition Dates
4. IDENTIFICATION OF THE STATUTORY AUTHORITY PERMITTING OTHER THAN FULL
AND OPEN COMPETITION
The statutory exception to full and open competition is issued under 41 U.S.C. 3304(a)(1) as implemented by FAR 6.302-1, “Only one responsible source and no other supplies or services will satisfy agency requirements”.
5. DEMONSTRATION THAT THE PROPOSED CONTRACTOR’S UNIQUE
QUALIFICATIONS OR THE NATURE OF THE ACQUISITION REQUIRES USE OF
AUTHORITY CITED
5.a. Cox is the only contractor that can provide these services to these specific agencies for this particular timeframe. Cox is currently the incumbent contractor for each of the agencies listed above and is providing the listed services. Agencies have awarded their Enterprise
Infrastructure Solutions (EIS) task orders in accordance with FAR part 16.505 and are well into their transition off of this Cox contract and onto their EIS task orders. This extension is necessary to provide enough time for the physical transition of services to the EIS task orders.
Other contractors provide the same type of service, however, it is not possible to transition the services to any other contractor faster than to the EIS contractor. Competing and awarding an additional contract or task order would create a transition inside of the transition to EIS and would seriously stall agencies’ progress in fully transitioning from this contract to EIS. As such, Cox is the only contractor source who can continue to serve as the incumbent provider to these agencies while the agencies complete the process of transitioning to their new contracts.
5.b. Specific Demonstration
5.b.1 EIS Task Order Awards
As noted in section 1, user agencies DHS and DOT require an extension of this contract. DHS and DOT have already awarded EIS task orders using competitive procedures. Both of these user agencies are transitioning from services provided on this contract to their competitively awarded EIS task orders.
Department of Homeland Security (DHS) specifically the following components:
Federal Law Enforcement Training Center (FLETC)
- FLETC Task Order 1 #70LGLY22FSSB00007 (FLETC TO1), was competed and awarded to
Verizon Federal on EIS Contract GS00Q17NSD3009 on December 15, 2021 to provide Data.
- FLETC Task Order 2 #70LGLY22FSSB00011 (FLETC TO2), was competed and awarded to
MetTel on EIS Contract GS00Q17NSD3007 on January 13, 2022 to provide Voice.
Immigration and Customs Enforcement (ICE)
- ICE Task Order 1 #70CTD021FR0000018 (ICE TO1) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 for DHS HQ Core Data on January 6, 2021.
- ICE Task Order 2 #70CTD022FR0000092 (ICE TO2) also competed and awarded the DHS
ICE Traditional Voice Requirements on Task Order to Granite Telecom on EIS Contract
GS00Q17NSD3004 on August 1, 2022.
Transportation Security Agency (TSA) & Federal Air Marshall’s Service (FAMS)
- TSA Task Order #70T03022F7667N027 (TSA TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on August 1, 2022.
U.S. Coast Guard (USCG)
- USCG Task Order #HC101321F0196 (USCG TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on August 26, 2021.
Department of Transportation (DOT)
Federal Aviation Administration (FAA)
- FAA Task Order TO# 693KA8-21-F-00083 (FAA TO) was competed and awarded to AT&T on
EIS Contract GS00Q17NSD3000 on February 12, 2021
5.b.2 Impact of not extending, and forcing user agencies to recompete the services currently provided on the subject contract
The extension of this contract is to support active Service Instance Records (SIRs) for user agencies so that there is not a break in service as they transition to their new EIS task orders. A
SIR typically includes information such as the customer's account number, the type of service
(i.e, analog line, Primary Rate Interface, Centrex line) that has been provisioned, the date and time the service was activated, and any other relevant details that may be needed to manage the service instance.
For example, in the case of a phone service, the SIR might include information about the customer's phone number, the type of plan they are on, and any usage limits or restrictions that apply to their account. Telecommunications service providers use SIRs to keep track of the services they are providing to their customers, to manage billing and invoicing, and to troubleshoot any issues that may arise with the service. SIRs are often integrated with other systems and databases, such as billing systems and network management systems, to provide a comprehensive view of the customer's service experience.
As part of each agency’s transition process, each SIR must first be assessed for implementation of the new service. Most SIRs will then need on-site evaluation of the facilities, wiring, interfaces and configurations to determine the required changes. Where equipment is aging or incompatible, replacement devices need to be ordered (with delayed delivery times due to chip-shortages), installed, and reconfigured.
There are currently over 520,000 active SIRs remaining on all legacy contracts supporting DHS missions, including 318 SIRs on GS06T11BND0010. DOT currently has over 228,000 active
SIRs remaining on all legacy contracts supporting DOT missions, including 301 SIRs on
GS06T11BND0010.
The 318 active SIRs provided on this contract support telecommunications for the following
DHS components and their ability to successfully perform their duties without disruption to their missions:
● FLETC’s mission is to train all those who protect the homeland, and therefore, its training audience also includes state, local, and tribal departments throughout the
U.S. Additionally, FLETC's impact extends outside our Nation's borders through international training and capacity-building activities.
● ICE's primary mission is to protect national security, public safety and the integrity of the U.S. borders through the criminal and civil enforcement of federal laws governing border control, customs, trade and immigration.
● TSA & FAMS protect the nation's transportation systems to ensure freedom of movement for people and commerce.
● USCG is the Nation's premiere maritime first responder, minimizing loss of life and property by searching for and rescuing persons in distress.
The 301 active SIRs for the DOT, FAA provided by this contract, provides POTS (Plain Old
Telephone Services) to FAA sites located in Wichita Kansas. Termination of these services will result in these sites not having the ability to communicate outside of the facilities. Without these services, the FAA facilities will be without phone services which will result in safety, health and security risks. Additionally, loss of services could result in having to shut down an FAA Facility, or in a worst case scenario an Air Traffic Facility having to be shut down because it can not perform its duty in protecting the air space. Shutting down an Air Traffic Facility would result in a major rerouting of planes, the potential for tremendous flight cancellations, shifting responsibilities for directing air traffic to other facilities, and could potentially have great financial impact.
DHS and DOT have all prepared task order solicitations that defined their requirements and then released those solicitations for fair opportunity in accordance with FAR 16.505. Proposals from EIS vendors were received and evaluated on the basis of cost and technical merit resulting in the award of new EIS task orders to transition all active SIRs off of the current contract. They are in the midst of transitioning to EIS. Additional time is required to complete these massive transition efforts. The fastest, most efficient and only feasible way to successfully transition to the competitively awarded EIS task orders is for the user agencies to be able to focus on the current transition and GSA extending this contract to allow transition completion. If GSA does not extend, and requires the user agencies to reprocure these services on a different contract, the only option the agencies would have is to award sole source contracts to the incumbent contractors because transitioning to another contractor is virtually impossible at this stage. This action would result in a transition within the original transition and would be a tremendous distraction from accomplishing the government's goal while wasting time, resources, and tax-payer money. User agencies estimate that if GSA does not extend, reprocurement efforts
(including creation of solicitation packages, through award and potential protest resolution) for their whole agency would add an additional 12-36 months to their current estimated date for completing transition (May 31, 2026).
To maintain these services, agencies would be required to engage immediately with the incumbent contractors currently providing these services to begin negotiating terms. Agencies would need to craft and obtain approval of justifications for other than full and open competition and begin sole source negotiations, including multiple acquisition packages, solicitations, negotiation of terms, and awards. The newly awarded interim solution contracts might allow for an administrative or back-office transition, which is a transition where the current provider is transitioning the same services from one contract to another to change contract and account numbers. While the administrative transition provided by the interim contract solution could afford agencies further runway to transition legacy services to the originally awarded EIS Task
Orders, it would also represent a complete duplication of the transition effort. The agencies would be conducting a transition inside a transition, performing extensive administrative transition efforts, while conducting the larger transition to the already awarded EIS Task Orders.
Additionally, transitioning to an interim solution would not reduce the timeline to EIS, and in fact, would likely delay the transition of agencies to their competitively awarded EIS task orders.
Based on the factors above, having agencies award interim solution contracts to maintain services is duplicative, administratively burdensome, and cost prohibitive. As both Government and EIS Contractor resources are pulled away to support the interim solutions contract administrative transition, the main EIS transition will become secondary, and progress will stall, further increasing risk on the agency’s services and primary transition activities. This would be a tremendously inefficient and wasteful exercise.
5.b.3 User Agency Justification Factors
This additional time is needed for many different reasons. Each agency identified different justification factors that contributed to delays in transition from GS06T11BND0010.
DHS
DHS cited COVID-19 pandemic delays, supply chain disruptions, complexities related to modernizing services, delays related to Protest(s), and delayed award of EIS task orders as contributing factors to delays in transition from contract GS06T11BND0010. Additionally, over a year-and-a-half was spent collecting EIS requirements across DHS in an effort to implement a department-wide solicitation. After months of additional discussion, this strategy was modified so that components were to conduct individual EIS Solicitations. In late March 2020, the DHS components began developing their own EIS Strategy.
The COVID-19 pandemic presented barriers to transition for DHS that could not have been planned for or avoided. The effects of the pandemic continue to cause disruptions to the supply chain and were a major factor for several DHS components. Prior to COVID-19, telecommunication and network services could be provisioned by contractors faster than post-
COVID orders. For instance, a 50 MB Internet Protocol Solution (IPS) in the Continental U.S.
(CONUS) could be delivered in as little as 39 calendar days or as long as 550 days. The average was approximately 169 calendar days. The global chip shortage resulted in delays in the delivery of Cisco 8000 series routers taking up to 12 months in some instances. Service-
Related Equipment (SRE) or Service Enabled Devices (SED) impacted by chip, chassis, or other equipment delays entail 6–12-months of additional time. Delivery of a complete 50 MB solution is now taking 319 calendar days, on average. Additionally, after the award of EIS task orders, site surveys were required. However, workforce shortages due to COVID-19 significantly impacted the Local Exchange Carrier (LEC) support provided to the agency. As a result, there were delays in scheduling site surveys, actual circuit installations, and coordination amongst government local points of contact who were no longer physically located at the sites in some cases. This required the agency and EIS contractor to adjust in scheduling access, escort, deliveries, site surveys and inside wiring/construction, as necessary.
Transforming to a modernized service while transitioning presents an additional set of challenges for the DHS components and for the EIS contractors. This means that the agency is not simply reprocuring the services they previously purchased. Instead the service is converted during the transition, such as to replace a legacy service with a newer technology, improved functionality, or expanded reach. Technical complexities due to modernizing include the transitioning of traditional broadband services into a modernized solution.
An example of complexities related to modernizing: In one instance a DHS component is modernizing and transforming via the EIS transition. The DHS component is faced with modernizing their headquarters phone system and field circuit technology type. Additionally, a difficult-to-upgrade tie line is modernizing to a point-to-point telecommunications circuit. The EIS contractor and the DHS component originally planned to transition the current headquarters phone system, circuits, and tie lines as-is; however, DHS later discovered the Local Exchange
Carrier (LEC) would no longer support the circuit technology in use. At the DHS component headquarters, the contractor offered an alternative solution dependent upon access arrangements which the LEC declined to deliver. The DHS component and contractor are now moving forward with an alternative solution, while requiring multiple stakeholder reviews. This significantly lengthened the overall delivery timeline.
Another example of complexities related to modernizing for another DHS component that is modernizing a nationwide mission critical network system with a traditional hub-spoke topology, essentially a central component that’s connected to multiple networks. Due to the unique multicast requirement, the current network design is not compatible with the component's primary operational network which uses a multipoint technology to form a full mesh network. As a result, a complex configuration of static routing ensures end-to-end communications. When the component transitions a Sector Command Center, all static tunnels need to be reconfigured.
In some cases, upwards of 80+ static tunnels need reconfiguration. It is imperative that during transition efforts, the nationwide system is not degraded to avoid risk of “loss of life.”
There were several protests that affected the award of key EIS task orders in the transition of service from this contract. The USCG TO was protested resulting in a delayed start of the transition for over 230 days. There were two primary protests and five supplemental protests of the TSA TO resulting in a 4-month delay. And finally the post-award protests of USM TO 1 resulted in a 212 day delay that affected USM, CISA, ICE, OBIM and FPS.
Due to the COVID-19 pandemic delays, supply chain disruptions, complexities related to modernizing services, delays related to Protest(s), and delayed award of EIS task orders, DHS requires additional time to minimize impacts to operations for the transition of services. For these reasons, current services from the Cox must be retained longer to avoid interruption of
DHS’ mission execution.
DOT, FAA
DOT, FAA cited complexities related to modernizing services as the major justification factor contributing to delays in transition from contract GS06T11BND0010. Transforming to a modernized service while transitioning presents an additional set of challenges for the user agencies and for the EIS contractors. This means that the agency is not simply reprocuring the services they previously purchased. Instead the service is converted during the transition, such as to replace a legacy service with a newer technology, improved functionality, or expanded reach. Technical complexities due to modernizing include the transitioning of traditional broadband services into a modernized solution. The need to modernize is most evident in the discontinuation of Time Division Multiplex (TDM). TDM is a method of putting multiple data streams in a single signal by separating the signal into many segments, each having a very short duration. TDM services are based on copper wire and circuit switching; this is a legacy service that is being retired in all sectors due to regulatory changes impacting the entire telecommunications industry nationwide. Technology resources have evolved and as a result, it is not sustainable for telecommunications carriers to maintain increasingly expensive and less safe options such as TDM when there are more cost-efficient services available. The discontinuation of TDM forces modernization and increases costs and creates delays due to the industry-wide limitations of resources and the need to perform technical revalidation in order to effectively transition.
In the transition of services from the Networx, WITS 3, and LSA legacy contracts to the EIS contract, the FAA has experienced major complications in modernizing services. There were lengthy discussions with the contractor about the best way to transform/modernize all services;
either begin transform/modernize right away at award or perform a ”like for like” transition initially and then modernize services later in a second transition (also on the EIS task order).
After 8 months of discussion with the EIS contractor, FAA and the contractor agreed to modernize all services at award in order to avoid the FAA having to perform two transitions on the EIS task order, and also prevent the FAA from being in a position of losing services because of the discontinuation of legacy services like TDM. The financial impacts were also a major factor in this decision because during initial transition non-recurring costs (NRC) costs are waived, however the contractor would not guarantee they would honor that commitment during a second transition.
Most FAA services are POTS (Plain Old Telephone Service) lines or PRI (Primary Rate
Interface) services. FAA’s original transformation planning wanted the contractor to propose the most optimal solution on a site-by- site basis by leveraging new technology to combine services into as few solutions as possible rather than replace POTS with dial tone and PRI with IP Flex.
FAA expected the contractor to outline a plan that would leverage the IP Flex to combine different types of services.
FAA has an EIS Task Order, however the EIS contractor has to subcontract to multiple contractors in order to provide FAA with “the last mile” of service. Notices to discontinue TDM services are not being forecasted ahead of time by the existing providers. When issued, FAA and the EIS contractor have to shift focus to “put out these fires” to avoid losing service. In order to do that, FAA needs to transform that disconnected service to modern technology which requires either that the correct interfaces are up to date or that ports/cards are available to facilitate a PRI handoff. Due to the complexities related to modernizing services, FAA requires additional time to minimize impacts to operations for the transition of services. For these reasons, current services from the Cox must be retained longer to avoid interruption of FAA’s mission execution.
6. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE SOLICITED
FROM AS MANY SOURCES AS PRACTICABLE INCLUDING WHETHER A NOTICE WAS
OR WILL BE PUBLICIZED AS REQUIRED BY SUBPART 5.2 AND, IF NOT, WHICH
EXCEPTION UNDER 5.202 APPLIES.
This contract was competed in accordance with FAR Part 15 and originally resulted in nine (9) multiple award IDIQ contracts. It was synopsized in accordance with FAR Part 5.2 at that time.
Additionally, the follow-on vehicle to provide the services under this IDIQ contract is EIS.
Transition planning dictates that all agencies using Networx, WITS 3, and Local
Telecommunications contracts will transition to EIS contracts or another vehicle. EIS was also synopsized in accordance with FAR Part 5.2 and awards were conducted with full and open competition in accordance with FAR Part 15 and resulted in nine EIS IDIQ Contracts. Cox is not one of the EIS contract holders. Table 2 below provides the dates when each agency awarded their EIS task order(s) and to whom:
Agency EIS Task Order Award Date EIS Contractor
DHS - FLETC TO1 12/15/2021 Verizon
DHS - FLETC TO2 01/13/2022 MetTel
DHS - ICE TO1 01/06/2021 AT&T
DHS - ICE TO2 08/01/2022 Granite
DHS - TSA TO 08/01/2022 AT&T
DHS - USCG TO 08/26/2021 AT&T
DOT - FAA TO 02/12/2021 AT&T
Table 2: EIS Task Order Award Dates
7. DETERMINATION BY THE CONTRACTING OFFICER THAT THE ANTICIPATED COST
TO THE GOVERNMENT WILL BE FAIR AND REASONABLE
The anticipated cost of this 27 month extension is approximately $135,811.08 based on the current total monthly invoicing on this contract. As DHS and DOT continue to progress in transitioning to EIS this number decreases GSA does not anticipate any significant increase in modern telecommunications CLIN prices for this extension. Our analysis indicates that commercial prices for modern telecommunications services have been consistently falling, making it unlikely that contractors will be able to justify any pricing increases for many services.
Although some older technology services are becoming more expensive, unless a contractor primarily offers these older services, the net effect of these price increases is likely to be offset by the pricing on more modern services. In previous extensions, while there were some price increases, when taken on average, across the contracts, total pricing fell.
Every year GSA updates its commercial telecommunications pricing database using numerous sources. Each month this database is used to calculate the savings recognized by agencies using our telecommunications contracts by comparing prices paid to these commercial prices.
We recently updated the commercial price database for FY23. For comparison purposes only, we ran the fourth quarter FY22 savings using both the FY22 and FY23 commercial prices.
Because FY23 commercial prices had fallen across the board, the overall Q4FY22 savings percentage fell by several percentage points when using the new FY23 commercial prices.
While there are some commercial prices that have increased, these services do not constitute a significant enough portion of the services purchased from GSA to counteract the price decreases on other services.
This Region 6 LSA with Cox has a shared contract ceiling with the other Region 6 LSA contracts. The originally awarded nine (9) Region 6 LSA contracts have a shared ceiling amount of $10,000,000 and to support the extension of the Region 6 LSAs, this shared ceiling will increase by $10,000,000 to a final shared ceiling of $20,000,000.
8. DESCRIPTION OF MARKET RESEARCH CONDUCTED AND THE RESULTS (see part
10) OR A STATEMENT OF THE REASON MARKET RESEARCH WAS NOT CONDUCTED.
GSA conducts market research for network and telecommunication services on a regular basis throughout the year. The research includes assessing vendors' business practices and pricing strategies across the industry. GSA leverages the business intelligence gathered to inform business decisions related to contract establishment and administration as part of its normal business practices. The market research and business intelligence which included customer agency input, industry expertise, and professional publications were leveraged for this effort in order for GSA to make informed decisions about extending the reference contract.
9. OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND OPEN
COMPETITION, such as: When 6.302-1 is cited for follow-on acquisitions as described in
6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.
GSA has been working across the Federal community to assist agencies in transitioning into the competitively awarded EIS program. Transition is a long, complex process spanning multiple years. While a number of agencies have or will complete their transitions on time, several require more time. The purpose of this sole source award is to provide such agencies with additional time to complete their transition. GSA is continuing to work with these agencies and has asked OMB to provide assistance in ensuring greater progress with transition. GSA remains committed to ensuring all Federal agencies transition from the Networx and LSA contracts to EIS.
It would be a duplication of cost and effort to compete a contract to support these agencies requirements when the new contracts have already been competed and awarded (EIS). The purpose of this extension is to allow for that transition to continue and be completed.
Additionally, it is not feasible - nor possible for a different contractor to compete for, be awarded and transition the specific services currently utilized by agencies. Such an effort would require each of these agencies to devote the personnel and resources currently working on transition to the EIS task orders to switch to working on the same effort to award and then transition the existing services to a bridge contract. These same personnel and resources would then have to be immediately switched to implement a completely duplicative transition from the bridge contract to the EIS task orders. Agencies’ schedules for transitioning inventory from this contract to EIS task orders will not allow another transition from a bridge contract.
As mentioned above, the purpose of this extension is not intended to be used for agencies to order new services. All agencies are required to sign a Memorandum of Understanding (MOU) with GSA in order to remain on the Networks Authorized User List (NAUL) and to use the
Networx, Washington Interagency Telecommunications System 3 (WITS 3), and LSA contracts through 31 May 2026. In accordance with the MOU, during this period, “... the Agency will not order any new services or changes and relocation of existing services on any of the expiring
Networx, WITS 3, and Local Service telecom contracts. The only orders the Agency may submit are those to disconnect service. In the event of exigencies that may require the Agency to order service on the expiring contracts, there are six scenarios under which the Agency may request
GSA waive the prohibition:
1. Disaster relief activities;
2. Activities necessary by law, the Constitution, for safety of human life, or for protection of property;
3. Law enforcement operations;
4. Protective functions of the U.S. Secret Service;
5. Counter-terrorism or intelligence-gathering or -dissemination capabilities;
6. Matters related to diversity, equity, inclusion, and accessibility."
10. A LISTING OF SOURCES, IF ANY, THAT EXPRESSED, IN WRITING, AN INTEREST IN
THE ACQUISITION
All interested parties participated in the competition of the EIS contracts by submitting a proposal and nine of them have EIS contracts to continue this work. This extension provides agencies with additional time to complete their transition from this contract to the EIS contracts.
11. A STATEMENT OF ACTIONS, IF ANY, THE AGENCY MAY TAKE TO REMOVE OR
OVERCOME ANY BARRIERS TO COMPETITION BEFORE ANY SUBSEQUENT
ACQUISITION FOR THE SUPPLIES OR SERVICES REQUIRED
The EIS multiple award IDIQ contracts are the follow-on contracts to provide the services currently provided under this contract. GSA conducted a FAR Part 15 full and open competition to award the EIS IDIQ contracts to replace all its legacy telecommunications contracts, inclusive of GS06T11BND0010. On July 31, 2017, GSA awarded the Enterprise Infrastructure Solutions
(EIS) contract to nine (9) contractors. Cox was not awarded an EIS contract. The agencies listed in the Table 1 under Section 3 have all awarded or are in the process of awarding their
EIS task orders to replace those services listed. All EIS task orders are subject to FAR Part
16.505 fair opportunity procedures. This extension is required to provide agencies the extra time required for them to transition those services off of this contract to their EIS task order or soon to be awarded task order.
Customer agencies are responsible for their transition from the legacy contracts to EIS and are in various stages of completing transition. GSA has provided significant assistance to agencies in the years since the award of EIS to aid in each phase of the transition. Agencies planning on using the Networx, WITS 3, and LSA contracts extension periods are required to sign a MOU with GSA acknowledging that during the additional time period, agencies will have responsibility to transition all remaining services to EIS or another acquisition solution or implement a contingency plan by May 31, 2026.
GSA has had limited information and visibility into agencies’ transition progress in the past. The
MOU for agencies using extensions from June 1, 2024 through May 31, 2026 requires increased transparency and monitoring on agency transition status. Increased visibility will encourage agencies to transition faster and allow agencies to recognize earlier that contingency plans must be implemented by the customer agency to avoid disconnects after May 31, 2026.
GSA is not a mandatory source for the telecom services and agencies have the option to choose the procurement vehicle that best suits their needs. GSA does not have the authority to hold agencies accountable to meet the agencies’ transition plan deadlines, however, GSA has no intention of considering further extension of this contract. Any further sole source procurement needs will be executed by customer agencies’ Contracting Officers if needed.
Lastly, to minimize or eliminate the need for non competitive extensions in the future, GSA will apply transition lessons learned to all EIS follow on procurement activities.
12. CERTIFICATIONS AND APPROVALS
TECHNICAL PERSONNEL CERTIFICATION:
I certify that the supporting data for this Justification for Other than Full and Open
Competition, was the responsibility of technical or requirements personnel (e.g., verifying the Government’s minimum needs or schedule requirements or other rationale for other than full and open competition). The supporting data provided and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.
___________________________ Date: _______________________
GSA Technical Representative
CONTRACTING OFFICER CERTIFICATION AND APPROVAL:
I certify that this Justification for Other than Full and Open Competition, in accordance with
FAR 6.302-1, is accurate and complete to the best of my knowledge and belief, and that a brand name is justified and reasonably available.
7/18/2023
GSA Contracting Officer
Approvals:
Competition Advocate for ITC
7/19/2023
7/19/2023
Certificate Of Completion Envelope Id: 40E82FAF841944959D07EED38DE5B45A Status: Completed
Subject: Complete with DocuSign: #10 GS06T11BND0010 (Cox) Region 6.pdf
Source Envelope:
Document Pages: 14 Signatures: 3 Envelope Originator:
Certificate Pages: 2 Initials: 0 Will Moore
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC) Dublin, Edinburgh, Lisbon, London
1800F F St NW
Washington DC, DC 20405 will.moore@gsa.gov
IP Address: 76.243.4.222
Record Tracking Status: Original
7/18/2023 7:48:04 PM
Holder: Will Moore will.moore@gsa.gov
Location: DocuSign
Security Appliance Status: Connected Pool: FedRamp
Storage Appliance Status: Connected Pool: US General Services Administration Location: DocuSign
Signer Events Signature Timestamp William Moore will.moore@gsa.gov
US General Services Administration
Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style
Using IP Address: 76.243.4.222
Sent: 7/18/2023 7:51:26 PM
Viewed: 7/18/2023 7:51:36 PM
Signed: 7/18/2023 7:51:45 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Jenni Lewis jenni.lewis@gsa.gov
Supervisory Contract Specialist
US General Services Administration
Security Level: Email, Account Authentication (None)
Signature Adoption: Pre-selected Style
Using IP Address: 74.105.85.106
Sent: 7/18/2023 7:51:46 PM
Viewed: 7/19/2023 2:06:38 PM
Signed: 7/19/2023 2:06:44 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Marquita Washington marquita.washington@gsa.gov
Director, Governance Division
US General Services Administration
Security Level: Email, Account Authentication (None)
Signature Adoption: Pre-selected Style
Using IP Address: 96.70.174.213
Sent: 7/19/2023 2:06:46 PM
Viewed: 7/19/2023 9:05:10 PM
Signed: 7/19/2023 9:05:18 PM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 7/18/2023 7:51:26 PM
Certified Delivered Security Checked 7/19/2023 9:05:10 PM
Signing Complete Security Checked 7/19/2023 9:05:18 PM
Completed Security Checked 7/19/2023 9:05:18 PM
Payment Events Status Timestamps
| 2023-07-19T13:20:29-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .