VMI00041_Drawings.pdf
PDF 7 MB Posted
- Attached to
- Sprinkler Protection Upgrades Federal contract opportunity
- Solicitation number
- GS05P16SVC7088
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\02_CAD\G001.dwg, 5/20/2016 8:47:34 PM, asowinski
" B
F 60 to be approved
SIGNAGE
HVAC CONTROLS
and DUPLEX OUTLET
TELE. WALL JACK
PUSH BUTTON
KEY SWITCH or or DIMMERCARD READER LIGHT SWITCH
FIN. FLR.
LINE
by Architect
" S
TD
4"
FIN. FLR.
LINE
ITEM ALIGNMENT
TYPICAL WALL
4" MIN
Door
16" MAX
Mounting Height Schedule
WALL MOUNTED ACCESSORIES
Text. Graphic, and Size
NOTE:
W1 W2 W3 W4
W7W6W5
GRAVEL/STONE
SAND/GRAVEL
(VENEER FINISH)
SHIM MATERIAL
(GRANULAR MATERIAL)
(SUB-BASE MATERIAL)
PLYWOOD/PARTICLE
(NOTE MATERIAL)
(WOOD, METAL, ETC.)
(NOTE MATERIAL)
ACOUSTIC/THERMAL
/SEMI-RIGID
(NOTE MATERIAL)
(MARBLE, STONE)
(GRANITE, ETC.)
(SECTION/ELEVATION)
(NOTE MATERIAL)
WOOD/SOLID SPECIES
(FINISH MATERIAL)
(NOTE MATERIAL)
(CONTINUOUS
BLOCKING)
WOOD
STONE
CONCRETE
(SECTION)
CONC., STONE,
PLASTER
(ELEVATION)
RIGID
BRICK
ALUMINUM, ETC.
STEEL/COPPER, METAL,
(NOTE MATERIAL)
(CONCRETE BLOCK
C.M.U.
BATT OR BLANKET
(NOTE TYPE)
INSULATION
CARPET
INSULATION
ACOUSTIC/THERMAL
(NOTE TYPE)
JOINT FILLER
PLASTER GYPSUM/
CEMENTITIOUS ON
METAL LATH
(NOTE MATERIAL)
GYPSUM WALL
BOARD
BOARD
Material Poche Indications
GROUT SOLID CELLS
C.M.U. - SOLID OR
NOT ALL HEIGHTS SHOWN ARE TYPICAL FOR ALL ITEMS WHERE THEY OCCUR
UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS, (B.F. DENOTES BARRIER FREE REQUIREMENTS)
NOT ALL ITEMS SHOWN ON THIS DRAWING MAY OCCUR ON THIS PROJECT
WATER HEATER
WATER CLOSET
WATERPROOFING
WATER RESISTANT
WELDED WIRE FABRIC
WELDED WIRE MESH
WIDTH, WIDE, WEST
VINYL COMPOSITION TILE
VINYL RESILIENT STRIP
VINYL WALL COVERING
WALL HYDRANT
VAPOR BARRIER
TRANSFORMER
TOWEL & WASTE CABINET
UNLESS OTHERWISE NOTED
TOP & BOTTOM
THROUGH/THOUGHOUT
TOILET PAPER HOLDER
TONGUE AND GROOVE
TOP ELEVATION
TOP OF CURB
TOP OF STEEL
TOP OF CONCRETE
TANGENT POINT
TEMPERATURE, TEMPERED
VAPOR RETARDER
E
FIRE EXTINGUISHER CABINET
FURR
FVC
FD
FLUOR
FTG
FDN
FA
FS
FLD
FHS
FPR
FEC
FL
FURR(ED), (ING)
FIRE VALVE CABINET
FIRE HOSE STATION
FIRE PROOFING
FLOOR(ING)
FLOOR DRAIN
FLUORESCENT
FOUNDATION
FRESH AIR
FOOTING
FAR SIDE
FIELD
MCC
MTD
MULL
MOUNT(ED), (ING)
MOTOR CONTROL CENTER
MULLION
ELECTRIC WATER COOLER
EXPOSED CONSTRUCTION
FOC
FIN
FF
F°
FT
FE
EXT
F
EQUIP
ESC
EXH
EXP CONST
EB
EJ
EMER
ENC
EQ
ELEV
EL
EXTERIOR
FACE OF CONCRETE
FACTORY FINISH
FEET/FOOT
FINISH(ED)
FIRE EXTINGUISHER
DEGREES FAHRENHEIT
ELEVATION
ELEVATOR
EMERGENCY
ENCLOS(E), (URE)
ESCALATOR
EXPANSION BOLT
EXPANSION JOINT
EQUIPMENT
EXHAUST
EQUAL
EA
EW
ELEC
EWC
EF
E
EACH FACE
EACH WAY
ELECTRIC(AL)
EACH
EAST
MEZZ
mm
MIN
MIR
MISC
MISC
MET T.
ML
MON.
MET
MDS
MC
MED
MEM
MILLIMETER(S)
METAL DIVIDER STRIP
METAL THRESHOLD
MISCELLANEOUS
MISCELLANEOUS IRON
MEZZANINE
MINIMUM
MIRROR
METAL LATH
MONITOR(ED)
METAL
MEDICINE CABINET
MEDIUM
MEMBER
SWITCH
SUPPORTS
SUSPENDED
SWITCHBOARD
SWITCHGEAR
SYMMETRY(ICAL)
SUPP
SUSP
SW
SWBD
SWGR
SYM
GP
GWB
GYP L
GALV
GL
g
GRD
GYP
GR
G
GA
GAL
GYPSUM PLASTER
GYPSUM WALL BOARD
GYPSUM LATH
GAGE, GAUGE
GLASS, GLAZING
GRADE, GRADING
GALVANIZED
GRAM
GROUND
GYPSUM
GALLON
OPPOSITEOPP
OA
OH
OD
OPP HD
Oz
OS
ORIG
OUTSIDE DIAMETER
OVERHEAD
OUTSIDE AIR
OUNCE
ORIGINAL
OPPOSITE HAND
OUTSIDE
NATURAL COLOR ANODIZED
NATURALNAT
NOT TO SCALENTS
OFF
O/C
OPG
O
NO (#)
OFFICE
OPENING
ON CENTER(S)
NUMBER
NIC
NRC
NOM
NEG
NCA
NA
N
NOT APPLICABLE
NOT IN CONTRACT
NORTH
NOMINAL
COEFFICIENT
NOISE REDUCTION
NEGATIVE
N
EPDM ETHYLENE PROPYLENE
DIENE MONOMERS
FULLY-ADHEREDFSRS
SHEET ROOFING SYSTEM
MEMB MEMBRANE
REV REVISION(S), REVISED
LHR LEFT HAND REVERSE
DF
DIM
DO
DT
DWG
D/W
DN
DET
DIFF
DIAG
DL
DRINKING FOUNTAIN
DEAD LOAD
DIAMETER
DIFFUSER
DIMENSION
DISHWASHER
DOOR OPENING
DRAIN TILE
DIAGONAL
DOWN
DRAWING
DETAIL
MANUFACTURE(R)MFR
MAT
MAX
MECH
MAR T.
MKB
MAR
MO
MAS
MARKER BOARD
MASONRY OPENING
MARBLE THRESHOLD
MATERIAL(S)
MAXIMUM
MECHANICAL
MARBLE
MASONRY
M
MH
MAG
LLV
L.P.
LV
LOC
LL
LG
LLBB
LLH
LLO
L
LT
LP
LIN
LTG
LOCATE/LOCATION
LOW VOLTAGE
LONG LEG VERTICAL
MAGNETIC
MANHOLE
LOW POINT
LIGHTING PANEL
LINEAR, LINEAL
LONG LEGS BACK
LONG LEG HORIZONTAL
LONG LEG OUTSTANDING
LIVE LOAD
TO BACK
LONG
LENGTH
LIGHT
LIGHTING
STORAGESTOR
STREET
STORM DRAIN
STRUCTURAL
SUPPLY AIR
STRUCT
SD
ST
SA
SEALERSEAL
SHEET
SIMILAR
SERVICE SINK
SINK
SOUTH
SOIL BORING
SPEAKER
SQUARE
SQUARE FOOT (OR STOREFRONT)
STAGGERED
SECTION
SOUND TRANSMISSION CLASS
SPACER, SPACING
SPECIFICATION(S)
SQUARE CENTIMETER
STAINLESS STEEL
SHORT LEG OUTSTANDING
STONE
STEEL
STATION
STANDARD
SPK
SPEC(S)
STAG
SST
STN
STA
STL
STD
SQ
cm
SF
SHT
SIM
STC
SPC
SLO
SECT
SK
SB
S
SS
RIGHT HAND
RISER
ROAD
RIGHT OF WAY
ROOF DRAIN
RIGHT HAND REVERSE
ROOM
ROOF SUMP
ROOFING
RUBBER
SANITARY
SCHEDULE
SCORED JOINT
RECEPTACLE
ROUGH OPENING
SANITARY NAPKIN DISPENSER
SANITARY NAPKIN WASTE
RUB
SAN
SND
SNWR
SCH
SJ
S
RHR
ROW
RFG
RD
RS
RM
RO
RH
R
Rd
INCLUDE(D), (ING)INCL
CARD READERCR
CONCRETE MASONRY UNIT
CONTINUOUS OR CONTINUE
CORRUGATED OR CORRIDOR
CONCEALEDCONCE
D
DPR
DP
CTR
CYL
CTSK
CF
CY
CONST
CONT
CONST JT
CORR
CONTR
CJ
CONC
CMU
CONN
CYLINDER
COUNTERSUNK
CUBIC FOOT
CUBIC YARD
DAMPROOFING
DAMPER
CENTER
CONCRETE
(CONCRETE BLOCK)
CONNECTION
CONSTRUCTION
CONTRACT(OR)
CONTROL JOINT
CONSTRUCTION JOINT
CER
CW
COL
COMB
CHK
COMP
CT
CL
CLOS
CO
CHDK PL
CLG
CEM
CM
C TO C
C°
CPT
CES
CB
CIP
CI
CERAMIC
CERAMIC TILE
COAT HOOK
CLEAR(ANCE)
CLEAN OUT
COLD WATER
COMBINATION
COMPRESS(ED),(ION),(IBLE)
CHECKERED PLATE
COLUMN
CLOSET
CARPET(ED)
CARPET EDGE STRIP
CAST IRON
CATCH BASIN
CENTER TO CENTER
CENTIMETER(S)
CAST-IN-PLACE
DEGREES CENTIGRADE
CEILING
CEMENT
LAB
LAV
LH
LAM
LCC
KO
L kg/m
K
KIT
KSI
kg/cm 2 kg
KV
KW
KVA
KWH
LABORATORY
LEAD COATED COPPER
LAMINATE(D)
LAVATORY
LEFT HAND
KNOCKOUT
KILOVOLT/AMPERE
KILOWATT-HOUR
KILOGRAM PER METER
KILOGRAM PER SQUARE
KIPS PER SQUARE INCH
CENTIMETER
KITCHEN
KIPS
KILOGRAMS
KILOVOLT
KILOWATT(S)
JST
JB
K
J
JT
JC
INTERM
INV
IRR
INT
INFO
INSUL
ICA
ID
JUNCTION BOX
JANITOR'S CLOSET
JOIST
JOINT
INSULATE(D), (ION)
INTEGRAL COLOR
INTERMEDIATE
INSIDE DIMENSION
INTERIOR/INTERNAL
ANODIZED
INVERT
IRRIGATION
INFORMATION
ABOVE REFERENCE FLOOR
ACOUSTICAL TILE (OR ACTIVE)
ADDENDUM
ALTERNATE OR ALTERNATIVE
BLKG
BL
C
CABT
BOT
BLDG
BC
BD
BS
BRG
BM
BETW
BIT
B.F.
BP BP
B
L
BLOCKING
BOTH SIDES
BOTTOM OF CURB
BUILDING LINE
CABINET
BOARD
BOTTOM
BUILDING
BARRIER FREE
BASE PLATE OR
BITUMINOUS
BEARING P
BENCH MARK OR BEAM
BEARING
BETWEEN
L
AB
ANOD
ARCH
ASPH
AUTO
AGG
A/C
ALT
ANCH
AL,ALUM
ACCT
AC
ACT
ADD
ADJ
AP
A
ARF
AFF
AGGREGATE
AIR CONDITIONING
ANCHOR BOLT
ANODIZED
ARCHITECT(URAL)
AUTOMATIC
ALUMINUM
ANCHOR, ANCHORAGE
ASPHALT
ACOUSTICAL
ADJACENT
ACCESS PANEL
ABOVE FINISHED FLOOR
ACCENT
HARDWOODHWD
I
IN(")
HP
HB
HW
HR
HWH
H
HS
HC
HM
HORIZ
HP
HTG
H&V
HVAC
HT
HORSE POWER
HOT WATER HEATER
INCH(ES)
HOSE BIBB
HOT WATER
HOUR
AIR CONDITIONING
HIGH STRENGTH
HOLLOW CORE
HOLLOW METAL
HEATING & VENTILATING
HEATING/VENTILATION/
HIGH
HORIZONTAL
HIGH POINT
HEATING
HEIGHT
H
HDCP
HDWE
HDBD
HANDICAP(PED)
HARDWARE
HARDBOARD
VINYLVIN
PE PASSENGER ELEVATOR
RECEIVING
REFERENCE
REFRIGERATOR
REQUIRED
RESILIENT
RESILIENT TILE
REGISTER
RETURN AIR
RECESS(ED)
RADIUS, RADIATOR, RADIATION
RAINWATER CONDUCTOR
REFLECT(ED), (IVE), (OR)
REINFORCE(D), (ING)
QUARRY TILE
QUARRY TILE BASE
RECVG
REF
REFL
REFR
REG
REINF
REQD
RESIL
REC
RT
RA
RAD
QB
R
RC
QT
PERMANENT
PLASTER
PLASTIC LAMINATE
PLATE
PLUMBING
PLYWOOD
POLISHED
POUND(S)
PREFABRICATE(D)
POLYVINYL CHLORIDE
POUNDS PER CUBIC FOOT
POUNDS PER FOOT
POUNDS PER LINEAL FOOT
POUNDS PER SQUARE FOOT
PRECAST CONCRETE
PCF
PPF
PSF
PLF
PRE-FAB
Q
PC
lb/#
PERM
PLAS
PL
PLBG
PLWD
POL
PVC
PL
WITHOUTW/O
YD
WD
Y
YARD
WOOD
WH
WT
WWF
WWM
W W/
WM
WC
WP
WR
WS
WAIN
WHYD
W
VRS
VCT
VWC
VIT
WEIGHT
WITH
WATER MAIN
WATERSTOP
WAINSCOT
VITREOUS
PAINT(ED) (OR POINT)
PANEL
PARKING
PARTICLE BOARD
PARTITION
PAIR
PHYSICALLY HANDICAPPED
PAPER TOWEL DISPENSER
PAPER TOWEL DISPENSER &
RECEPTACLE COMBINATION
PT
PNL
PTD
PTD/R
PKG
PBD
PARTN
PH
PR
P
VA
VB
VAR
VERT
VEST
UR
V
U
UH
UON
TWC
TRAN
T
TYP
VARNISH
VERTICAL
VESTIBULE
VALVE
URINAL
UNIT HEATER
TREAD
TYPICAL
T&G T&B
TE
TOC
TC
TOS
THRES
THRU
TOIL
TPH
TOL
TEL
TV
TEMP
TERR
THERM
THK
TKB
TP
T
THRESHOLD
TOLERANCE
TOILET
TELEPHONE
TELEVISION
TERRAZZO
THICK(NESS)
THERMOSTAT
TACKBOARD
Abbreviations
VR
ETR EXISTING TO REMAIN
ADDITIONALADD'L
SPECIFIEDSPEC'D
EP EPOXY
R (CONT.)
CHAN CHANNEL
NONCOMB NONCOMBUSTIBLE
FWP FABRIC WRAPPED PANEL
PERPENDICULAR
CHANNEL
LC CENTERLINE
ANGLE
LP
AT
AND
ROUND
PLATE
THE ENTRY DOOR NUMBER SHALL BE THE
SAME AS THE ROOM NUMBER - IF MORE THAN
ONE (1) DOOR IS INDICATED ON THE PLAN FOR
GENERAL NOTE
SHEET NUMBER FROM WHICH DRAWING IS
REFERENCED
SHEET NUMBER WHERE SECTION IS LOCATED
DETAIL NUMBER
DARKENED ARROW INDICATES ELEVATED WALL
SHEET NUMBER WHERE ELEVATION IS LOCATED
REF. FLR.
EL. 00'-0"
DETAIL NUMBER
DETAIL TITLE
DETAIL NUMBER
DRAWING SCALE
ROOM NUMBER
ONE ROOM, EACH DOOR IN THAT AREA
WILL BE IDENTIFIED
Graphic Symbols
Drawing 3/4" = 1'-0"
A5-03
A1-03
KEY NOTE SYMBOL INDICATES WORK AS
A3-02
A8-03
ADD'L SHEET(S) FROM WHICH DRAWING IS
NOTE: ELEVATION SYMBOL USED FOR
INTERIOR & EXTERIOR ELEVATIONS.
REFERENCED
NOTE: SECTION SYMBOL USED FOR
WALL & BUILDING SECTIONS.
A
Line Type Designation
EXISTING ITEM TO REMAIN
EXISTING ITEM TO BE REMOVED
NEW ITEM AS NOTED
LOBBY
100A
Text Symbols
NOTE: SYMBOL INDICATES A SPECIFIC
HEIGHT IN AN ELEVATION OR SECTION VIEW
8'-0"
WALL TYPE SYMBOL INDICATES WALL TYPE DESIGNATION - REFER TO
WALL TYPE DRAWINGS FOR ADD'L INFO. SHEET A1-2
HEIGHT OF FINISHED CEILING ABOVE FINISHED FLOOR
IN AN ELEVATION OR SECTION VIEW
DESCRIBED IN KEYNOTE LIST ON SAME DRAWING
SHEET AS KEYNOTE OCCURS
BRK BRICK
FB FACE BRICK
QUARTERQTR
RUBBER BASE (OR RESILIENT BASE)RB
(OR SPORTS FLOORING)
TT TERRAZZO TILE
VINYL TILE
x'-x
VT
SEALED CONCRETES.CONC
LSWD LINEAR SUSPENDED WOOD CEILING
HEIGHT OF FINISHED CEILING ABOVE FINISHED FLOOR
IN A PLAN VIEW
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607
P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\02_CAD\G002.dwg, 5/20/2016 8:48:07 PM, asowinski
8 8
DN
B103A
B108
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
AREA OF WET FIRE PROTECTION SYSTEM ALTERATIONS -
REFER TO FIRE PROTECTION DRAWINGS. PAINT AND
LABEL NEW PIPING MODIFICATIONS.
EXISTING WET PIPE SPRINKLER SYSTEM TO BE
MAINTAINED W/ SYSTEM ALTERATIONS AS PART OF A
SEPARATE CONSTRUCTION PROJECT. COORDINATE WET
PIPE DISCONNECT AND ALTERATIONS WITH SEPARATE
PROJECT CONTRACTOR AND OWNER'S PROJECT
MANAGER.
NEW NON-RATED MASONRY BLOCK WALL PENETRATION -
CORE WALL AND TOUCH UP WALL FINISH.
NEW MASONRY INFILL AT REMOVED PIPE PENETRATION.
REMOVE AND REPLACE CONC BLOCK WALL
CONSTRUCTION - MATCH EXISTING BLOCK DIMENSION.
TOUCH UP WALL FINISH.
GENERAL NOTES:KEY NOTES (continued):
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N. REFER TO SPECIFICATION FOR
TRACKING SATE DISPOSAL RECORDS TO BE
SUBMITTED.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
7RELOCATED HORIZONTAL FIRE PROTECTION RISER
(MODIFIED) - REFER TO FIRE PROTECTION DRAWINGS.
PAINT AND LABEL NEW PIPES.
NEW FLOOR MOUNTED DRY PIPE FIRE PROTECTION RISER
W/ NITROGEN GENERATOR AND COMPRESSOR ON 4"
CONC PAD - REFER TO FIRE PROTECTION DRAWINGS.
NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE
CEILING (UL DESIGN W-J-1053). CORE EXISTING WALL
FOR PIPE PENETRATION AND FIRE STOPPING
INSTALLATION. TOUCH UP EXPOSED WALL FINISHES IN
UTILITY ROOMS.
NEW 2-HOUR FIRE RATED WALL PENETRATIONS ABOVE
CEILING (UL DESIGN W-J-1053 W/ MODIFICATIONS).
CORE EXISTING MASONRY WALL FOR PIPE PENETRATION
AND FIRE STOPPING INSTALLATION. TOUCH UP EXPOSED
WALL FINISHES IN UTILITY ROOMS/AREAS.
EXISTING 2'x2' ACOUSTICAL LAY-IN CEILING TILE AND GRID
TO BE REMOVED AND REINSTALLED FOR NEW PIPING
INSTALLATION.
AREA OF FIRE PROTECTION SYSTEM ALTERATION TO A
DRY PIPE SYSTEM - REFER TO FIRE PROTECTION
DRAWINGS. PAINT AND LABEL NEW PIPING
MODIFICATIONS.
KEY NOTES:
DN
B103A
B108
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
EXISTING FIRE PROTECTION RISER TO BE REPLACE -
REFER TO FIRE PROTECTION DRAWINGS. PAINT AND
LABEL NEW FIRE PROTECTION RISER AND PIPING.
AREA OF FIRE PROTECTION SYSTEM MODIFICATION -
REFER TO FIRE PROTECTION DRAWINGS. PAINT AND
LABEL NEW FIRE PROTECTION PIPING.
EXISTING PIPING/ELEC BUS DUCT PENETRATIONS TO BE
SEALED W/ FIRE STOPPING. TOUCH UP FINISHES ON
EXPOSED UTILITY ROOMS.
NEW 1-HOUR FIRE RATED MASONRY WALL PENETRATION
(UL DESIGN W-J-1053). CORE EXISTING WALL FOR PIPE
PENETRATION AND FIRE STOPPING INSTALLATION. TOUCH
UP EXPOSED WALL FINISHES.
REMOVE AND RE-INSTALL EXISTING LAY-IN CEILING AND
GRID TO COMPLETE WORK.
GENERAL NOTES:KEY NOTES:
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\03_Archives\08 _ 100% CD\CAD\AJ-1-B2.dwg, 5/23/2016 10:59:16 AM, asowinski
GENERAL NOTES:
EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP
NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.
MODIFIED FIRE PROTECTION RISER - REFER TO FIRE
PROTECTION DRAWINGS / SPECIFICATIONS.
NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE
CEILING (UL DESIGN W-J-1053). CORE EXISTING
WALL FOR PIPE PENETRATION AND FIRE STOPPING
INSTALLATION. TOUCH UP EXPOSED WALL FINISHES
IN UTILITY ROOMS.
NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN
FIELD. PAINT AND LABEL PIPING.
NEW 2'x2' ACCESS PANELS W/ LOCKING LATCH -
POSITION FOR PIPE INSTALLATION/SERVICE.
COORDINATE W/ EXISTING LIGHTING LAYOUT (V.I.F.).
EXISTING GYP BD CEILING. 24" WIDE AREA TO BE
REMOVED AND REPLACED FOR DRAIN PIPE
INSTALLATION. PAINT TO MATCH ADJACENT CEILING
COLOR - MATCH FINISH TEXTURE.
AREA OF FIRE PROTECTION SPRINKLER
MODIFICATIONS - REFER TO FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL
NEW PIPING MODIFICATIONS.
NOT USED.
NOT USED.
KEY NOTES:
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP
NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.
MODIFIED FIRE PROTECTION RISER - REFER TO FIRE
PROTECTION DRAWINGS / SPECIFICATIONS.
NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE
CEILING (UL DESIGN W-J-1053). CORE EXISTING
WALL FOR PIPE PENETRATION AND FIRE STOPPING
INSTALLATION. TOUCH UP EXPOSED WALL FINISHES
IN UTILITY ROOMS.
NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN
FIELD. PAINT AND LABEL PIPING.
NEW 2'x2' ACCESS PANELS W/ LOCKING LATCH -
POSITION FOR PIPE INSTALLATION/SERVICE.
COORDINATE W/ EXISTING LIGHTING LAYOUT (V.I.F.).
EXISTING GYP BD CEILING. 24" WIDE AREA TO BE
REMOVED AND REPLACED FOR DRAIN PIPE
INSTALLATION. PAINT TO MATCH ADJACENT CEILING
COLOR - MATCH FINISH TEXTURE.
AREA OF FIRE PROTECTION SPRINKLER
MODIFICATIONS - REFER TO FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL
NEW PIPING MODIFICATIONS.
NOT USED.
NOT USED.
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
GENERAL NOTES:KEY NOTES:
1 8
UP
DN
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP
NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.
MODIFIED FIRE PROTECTION RISER - REFER TO FIRE
PROTECTION DRAWINGS / SPECIFICATIONS.
NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE
CEILING (UL DESIGN W-J-1053). CORE EXISTING
WALL FOR PIPE PENETRATION AND FIRE STOPPING
INSTALLATION. TOUCH UP EXPOSED WALL FINISHES
IN UTILITY ROOMS.
NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN
FIELD. PAINT AND LABEL PIPING.
NOT USED.
NOT USED.
AREA OF FIRE PROTECTION SPRINKLER
MODIFICATIONS - REFER TO FIRE PROTECTION
DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL
NEW PIPING MODIFICATIONS.
EXISTING 2'x2' ACOUSTICAL LAY-IN CEILING TILE AND
GRID TO BE REMOVED AND REINSTALLED FOR NEW
DRAIN PIPE INSTALLATION.
NOT USED.
GENERAL NOTES:KEY NOTES:
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP NEW
TEST DRAIN INTO NEW DRAIN - REFER TO MECH. / FIRE
PROTECTION.
MODIFIED FIRE PROTECTION RISER - REFER TO FIRE
PROTECTION DRAWINGS / SPECIFICATIONS.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
AREA OF FIRE PROTECTION SPRINKLER MODIFICATIONS -
REFER TO FIRE PROTECTION DRAWINGS AND
SPECIFICATIONS. PAINT AND LABEL NEW PIPING
MODIFICATIONS.
NOT USED.
NOT USED.
GENERAL NOTES:KEY NOTES:
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607 in Architecture, PLC
EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP NEW
TEST DRAIN INTO NEW DRAIN - REFER TO MECH.
MODIFIED FIRE PROTECTION RISER - REFER TO FIRE
PROTECTION DRAWINGS / SPECIFICATIONS.
NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE
CEILING (UL DESIGN W-J-1053). CORE EXISTING WALL
FOR PIPE PENETRATION AND FIRE STOPPING
INSTALLATION. TOUCH UP EXPOSED WALL FINISHES IN
UTILITY ROOMS.
NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN
FIELD. PAINT AND LABEL PIPING.
EXISTING DRAIN LINE TO REMAIN - REFER TO FIRE
PROTECTION.
NOT USED.
AREA OF FIRE PROTECTION SPRINKLER MODIFICATIONS -
REFER TO FIRE PROTECTION DRAWINGS AND
SPECIFICATIONS. PAINT AND LABEL NEW PIPING
MODIFICATIONS.
NOT USED.
EXISTING EXPOSED CEILING - COORDINATE NEW HANGER
INSTALLATION AND DRAIN PIPE INSTALLATION WITH
EXISTING EQUIPMENT, DUCT WORK, LIGHTING.
GENERAL NOTES:KEY NOTES:
A. ALL DEMOLITION DRAWINGS AND DEMOLITION
DETAILS ARE PROVIDED TO SHOW THE GENERAL
SCOPE OF THE DEMOLITION WORK. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL
DEMOLITION WORK NECESSARY TO ACCOMPLISH
NEW WORK. THE DEMOLITION DRAWINGS AND
DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,
WHICH APPLY IN OTHER AREAS (AND ARE
DESIGNATED WITH DASHED, HIDDEN OR STRUCK
THRU LINES). COORDINATE ALL DEMOLITION WORK
WITH ALL ARCHITECTURAL, MECH. AND ELEC.
DRAWINGS. CONTRACTOR IS RESPONSIBLE TO
REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO
CONFIRM EXTENT OF DEMOLITION WORK.
B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,
OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND
PREPPED TO RECEIVE NEW WORK AND/OR
FINISHES.
C. ALL CONSTRUCTION AND DEMOLITION MEANS,
METHODS AND SAFETY PRECAUTIONS SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
D. REMOVE ALL ITEMS PROJECTING FROM EXISTING
WALLS OR FLOORS TO REMAIN (BLOCKING,
SCREWS, FASTENERS, PIPES, CONDUITS,
MOUNTING PLATES, FIXED EQUIPMENT, ETC).
PATCH AND REPAIR FOR NEW FINISH.
E. CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING AND UNDERSTANDING EXISTING
CONDITIONS, PRIOR TO BIDDING
F. CONTRACTOR SHALL PROTECT EXISTING BUILDING
ELEMENTS AND SITE FROM DAMAGE CAUSED BY
CONSTRUCTION OR CONSTRUCTION TRADES.
CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS
(IDENTIFIED BY OWNER OR ARCHITECT) AT NO
ADDITIONAL COST.
G. ASBESTOS AND OTHER HAZARDOUS MATERIALS
WILL BE REMOVED BY OWNER'S ABATEMENT
CONTRACTOR PRIOR TO START OF CONSTRUCTION.
IF ANY SUSPECTED HAZARDOUS MATERIAL IS
ENCOUNTERED, STOP WORK IN THAT AREA AND
IMMEDIATELY INFORM THE ARCHITECT AND OWNER.
H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY
OFF-SITE, U.O.N.
I. ALL EQUIPMENT AND FURNISHINGS NOT
SPECIFICALLY NOTED TO BE REMOVED SHALL BE
RELOCATED AND REST OR PROTECTED IN PLACE TO
COMPLETE WORK (V.I.F.)
J. COORDINATE ARCHITECTURAL WORK SCOPE AND
SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC
TRADES.
P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\03_Archives\08 _ 100% CD\CAD\AJ-1-27.dwg, 5/23/2016 10:58:12 AM, asowinski
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
EX
IS
T.
W
ET
EX
IS
T.
W
ET
P
IP
E
SU
PP
LY
EXIST. WET
N.I.C.
N.I.C.
N.I.C.
N.I.C.
APPROXIMATE POINT OF CONNECTION FOR NEW WET PIPE
FEED FOR NEW DRY PIPE SYSTEM.
INCREASE NEW PIPE TO 6" DIAMETER TO ACCOMODATE
NEW DRY PIPE VALVE.
DEMO EXISTING WET PIPE, VALVE, DRAIN AND FLOW SWITCH2
APPROXIMATE LOCATION OF NEW DRY PIPE VALVE, COMPLETE , 3
W/CONTROL VALVE, TAMPER SWITCH, HIGH-LOW AIR SWITCH,
NITROGEN GENERATOR UNIT COMPLETE WITH COMPRESSOR,4
CONNECTION POINT OF NEW DRY PIPE SUPPLY TO EXISTING
LOADING DOCK SUPPLY MAIN. REMOVE GROOVED 90 TO CONNECT.
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
ISOLATION VALVE AND PRV TEST HEADER TO REMAIN.
N.I.C.
CONVERT THE EXISTING WET-PIPE SPRINKLER SYSTEM TO A
BASEMENT LEVEL LOADING DOCK AND ASSOCIATED ROOMS:
FIRE ALARM CONTRACTOR SHALL CONNECT TAMPER
SWITCH ANDPRESSURE SWITCHES TO THE BUILDING'S
FIRE ALARM SYSTEM.
DRY PIPE SPRINKLER SYSTEM FOR THE AREAS INDICATED
IN THE AREA PLAN, IN ADDITION TO PROVIDING A COMPLETE
COORDINATE ALL IMPAIRMENTS TO THE SYSTEM WHILE
PERFORMING PIPING TIE-INS WITH GSA CONTRACT AND
PROJECT MANAGERS.
AND FUNCTIONAL NITROGEN GENERATOR SUPPLY SYSTEM.
ALL NECESSARY TRIM. MIN. CAPACITY REQ'D IS 270 U.S. GAL.
PIPE ROUTING AND CONNECTION POINTS TO BE ADJUSTED BY
F.P. CONTRACTOR AS REQUIRED BY SITE CONDITIONS.
NITROGEN VENT, IF RISER MOUNTED. 120V SINGLE4A
4A
PHASE POWER WHERE REQUIRED.
120V SINGLE PHASE POWER REQUIRED.
DISCONNECT EXISTING SPRINKLER HEAD FROM WET SYSTEM.
FEEDING LOADING DOCK.
PRESSURE ALARM SWITCH, AND ALL NECESSARY TRIM.
CAP OFF IN HEATED CORRIDOR.
AND STORAGE TANK. CONNECT TO DRY PIPE VALVE, INCLUDING
PROVIDE SIGNAGE IN ACCORDANCE WITH GSA REQUIREMENTS
STATING : ISOLATION VALVE TO REMAIN CLOSED EXCEPT
WHEN PERFORMING ANNUAL PRV TESTING. PROVIDE PROOF
COPY TO GSA FOR APPROVAL PRIOR TO SIGNAGE INSTALLATION.
6 INSTALL DRUM DRIP DRAIN ON DROP TO PRV ISOLATION VALVE.
PROVIDE APPROPRIATE ADAPTER AT MAIN DRAIN VALVE
FOR 2.5" FIRE HOSE FOR DISCHARGE TO LOADING DOCK DRAIN.
4A
NEW WET
NE
W
D
RY
OF DPV IS WET.
ALL PIPING
DOWNSTREAM OF
DPV IS DRY/NITROGEN
SUPERVISED.
ALL PIPE UPSTREAM
A COMPLETE TRAINING SESSION BY THE NITROGEN GENERATOR
SYSTEM'S MANUFACTURER'S REPRESENTATIVE SHALL BE
INCLUDED IN THIS PROJECT BEFORE TURNOVER TO THE
OWNER FOR FINAL ACCEPTANCE.
LOADING DOCK F.F.
EX
IS
T.
W
ET
NE
W
W
ET
OPTION NO. 1: ADDITIONAL FIRE PROTECTION PIPING REPLACEMENT
FOR A COMPLETE SYSTEM REPLACEMENT, SPECIFIED IN DIVISION
211315 SPRINKLER SYSTEM MODIFICATIONS IN ROOMS B002 MECH,
B002A MECH, B004 MECH, B004A MECH, B005 MECH, B005A MECH,
B14 STORAGE, AND B48 LOADING DOCK.
HANGERS. REPLACED SYSTEM PIPING SHALL BE DESIGNED, HYDRAULICALLY
CALCULATED AND INSTALLED TO COMPLY WITH NFPA 13, LATEST ED.
INCLUDED IN THIS REPLACEMENT IS ALL SPRINKLERS, FITTINGS AND
FOR PROTECTION OF VESTIBULE.
9 NEW SPRINKLER HEAD CONNECTED TO NEW DRY PIPE SYSTEM.
INSTALL INSPECTOR'S TEST CONNECTION PER NFPA 13, 8.17.4.3.1.
COORDINATE FINAL LOCATION WITH OWNER.
NEW DRY
DN
B103A
B108
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600 F 586.469.3607
B1VPD
VERT. PEN.
CRV
200.40
VERT
B112A
VEST.
TTO
139.60
AMI04747
B115
CORR.
CRH
356.88
BLDG
SU
PP
LY
'-4
6' -4
9'
-6
6' 8'
-3
3' -6
9' -6
6 6
WEST RISER-EVEN FLOORS
EAST RISER-ODD FLOORS
131313 13
10A
10B
DN
B103A
B108
INSTALL A NEW HYDRAULICALLY CALCULATED
WET PIPE SYSTEM COMPLETE WITH NEW
CONTROL VALVE WITH TAMPER SWITCH,
BASEMENT LEVEL ELECTRICAL SWITCHGEAR ROOM:
DEVICE PIPED TO THE BUILDING'S EXPRESS
DRAIN, ALL NEW PIPE, FITTINGS, HANGER
ASSEMBLIES AND SPRINKLER HEADS
EQUIPPED WITH U.L LISTED HEAD GUARDS.
NO NEW PIPING OR SPRINKLER HEADS SHALL
POSITIONED ABOVE, OR RUN OVER THE
ELECTRICAL OR SWITCHGEAR EQUIPMENT.
THE EXISTING SPRINKLER SYSTEM FOR THIS ROOM
IS SHUT OFF, BUT SHALL REMAIN IN PLACE UNTIL
THE NEW SYSTEM HAS BEEN TESTED AND ACCEPTED.
ONCE ACCEPTED, THE OLD EXISTING SYSTEM AND
CONTROL VALVE SHALL BE REMOVED AND CAPPED OFF.
THE NEW SYSTEM CONTROL VALVE SHALL BE
LABELED "NOT-IN SERVICE" UNTIL THE NEW
SYSTEM HAS BEEN TESTED AND ACCEPTED.
ONCE ACCEPTED, THE "NOT-IN-SERVICE"
LABEL SHALL BE REMOVED.
THE DESIGN DENSITY FOR THIS AREA SHALL BE:
.20 GALLONS PER MINUTE OVER 1,500 SQUARE FEET,
ORDINARY HAZARD GROUP 2.
WATER FLOW SWITCH, INSPECTOR'S TEST/DRAIN
FIRE ALARM CONTRACTOR SHALL CONNECT TAMPER
SWITCH AND WATER FLOW SWITCH TO THE BUILDING'S
FIRE ALARM SYSTEM.
All work and material shall conform to NFPA #13, latest ed., and PBS P-100 requirements.
All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved
All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.
All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest ed., and PBS P-100 requirements.
The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance
Side outlet rubber gasketed mechanical tee type fittings are not allowed.
A.
B.
C.
D.
E.
per contact requirements to witness the test.
The end of any new branch line shall have its hanger rod extended to the pipe, or have F.
a surge clip installed.
POINT OF CONNECTION FOR NEW SUPPLY TO BASEMENT
CUT IN NEW GROOVED TEE INTO EXISTING 4" SUPPLY MAIN.
3" GROOVED BUTTERFLY VALVE W/TAMPER SWITCH.2
3" VIC 747 MANIFOLD, W/ WFS AND TEST/ DRAIN 3
CONNECTION ABOVE EXISTING LAY-IN CEILING IN CORRIDOR.
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
ELEVATIONS DENOTED AS [000'-0"] ARE FROM4
BASEMENT FLOOR, AND ARE FOR HYDRAULIC
DESIGN PURPOSES.
SWITCHGEAR ROOM NEW FIRE SPRINKLER SYSTEM.
EXISTING CONTROL VALVE AND WATER FLOW SWITCH,
TO REMAIN UNTIL NEW SYSTEM IS PLACED INTO SERVICE.
ABOVE LAY-IN CEILING IN CORRIDOR.
TIE IN DRAIN TO EXISTING.
COORDINATE LOCATION OF SPRINKLERS AND PIPING TO BE8
SURE ANY AND ALL HVAC ACCESS DOORS/PANELS ARE NOT
OBSTRUCTED.
POINT OF CONNECTION FOR NEW DRAIN LINE5
INTO EXISTING DRAIN LINE.
ELECTRICAL EQUIPMENT, APPROXIMATELY 7'-0" TALL, (VARIES). 6
10 TYPICAL 5.6 K QR UPRIGHT ON 1" SPRIG.
11 TYPICAL CONCRETE BEAM.
12 8" FIRE PROTECTION STANDPIPE.
HVAC DUCTWORK-INSTALL PROTECTION UNDER DUCTWORK OVER 48" WIDE.13
7 DENOTES HYDRAULIC DESIGN NODE.
10A TYPICAL 5.6 K QR UPRIGHT.
10B TYPICAL 5.6 K QR HORIZONTAL SIDEWALL.
BASEMENT LEVEL ELECTRICAL SWITCHGEAR ROOM:
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600
MECH.
CST
912.51
BLDG
13CORA
CORR.
CRH
603.27
BLDG
C1310
CUST.
CST
34.67
BLDG
TE
ST
/D
RA
IN
L
IN
E
2"
DRAIN RISER
DOWN
INSTALL REMOTE INSPECTOR'S TEST/DRAIN
ASSEMBLY AFTER NEW WATER FLOW SWITCH
AND PIPE TO EXISTING BLDG. EXPRESS DRAIN.
CUT IN NEW CHECK VALVE
AFTER EXISTING CONTROL VALVE.
REPLACE EXISTING WATER FLOW SWITCH
WITH ZERO DELAY WATER FLOW SWITCH.
INSTALL AUTOMATIC AIR RELEASE VALVE/S
ELEVATOR MACHINE RM. 1312:
AS NECESSARY TO RELEASE TRAPPED AIR.
FIRE ALARM CONTRACTOR SHALL CONNECT
WATER FLOW SWITCH TO THE BUILDING'S
FIRE ALARM SYSTEM.
CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2
REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3
EXISTING 2" CONTROL VALVE.1
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5
REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.
ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,
VS-SP, NO RETARD TYPE WATER FLOW SWITCH.
A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED
TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.
BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER
MANUFACTURER'S INSTRUCTION.
INSTALL PER MANUFACTURER'S INSTRUCTION.
INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4
All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.
All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved
All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.
All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, 2013 latest edition, and PBS P-100 requirements.
The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance
Side outlet rubber gasketed mechanical tee type fittings are not allowed.
A.
B.
C.
D.
E.
per contact requirements to witness the test.
The end of any new branch line shall have its hanger rod extended to the pipe, or have F.
a surge clip installed.
ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C1310.
EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600
MECH.
MCH
912.51
BLDG
14CORB
CORR.
CRH
603.27
BLDG
14CORC
CORR.
CRH
600.67
BLDG
C1410
CUST.
CST
34.67
BLDG
TE
ST
/D
RA
IN
L
IN
E
2 3
CUT IN NEW CHECK VALVE
AFTER EXISTING CONTROL VALVE.
REPLACE EXISTING WATER FLOW SWITCH
WITH ZERO DELAY WATER FLOW SWITCH,
INSTALL AUTOMATIC AIR RELEASE VALVE/S
ELEVATOR MACHINE RM. 1428:
AS NECESSARY TO RELEASE TRAPPED AIR.
FIRE ALARM CONTRACTOR SHALL CONNECT
WATER FLOW SWITCH TO THE BUILDING'S
FIRE ALARM SYSTEM.
CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2
REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3
EXISTING 2" CONTROL VALVE.1
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5
REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.
ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,
VS-SP, NO RETARD TYPE WATER FLOW SWITCH.
A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED
TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.
BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER
MANUFACTURER'S INSTRUCTION.
INSTALL PER MANUFACTURER'S INSTRUCTION.
All work and material shall conform to NFPA #13, latest edtion, and PBS P-100 requirements.
All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved
All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.
All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest edition, and PBS P-100 requirements.
The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance
Side outlet rubber gasketed mechanical tee type fittings are not allowed.
A.
B.
C.
D.
E.
per contact requirements to witness the test.
The end of any new branch line shall have its hanger rod extended to the pipe, or have F.
a surge clip installed.
INSTALL REMOTE INSPECTOR'S TEST/DRAIN
ASSEMBLY AFTER NEW WATER FLOW SWITCH
AND PIPE TO EXISTING BLDG. EXPRESS DRAIN.
INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4
ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C1410.
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600
CORR.
TTO
229.42
AMI04747
EQUIP. RM.
MCH
990.57
BLDG
C2103
CUST.
CST
33.78
BLDG
UP
DN
CUT IN NEW CHECK VALVE
AFTER EXISTING CONTROL VALVE.
REPLACE EXISTING WATER FLOW SWITCH
WITH ZERO DELAY WATER FLOW SWITCH,
INSTALL AUTOMATIC AIR RELEASE VALVE/S
ELEVATOR MACHINE RM. 2195:
AS NECESSARY TO RELEASE TRAPPED AIR.
INSTALL REMOTE INSPECTOR'S TEST/DRAIN
FIRE ALARM CONTRACTOR SHALL CONNECT
WATER FLOW SWITCH TO THE BUILDING'S
FIRE ALARM SYSTEM.
CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2
REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3
EXISTING 2" CONTROL VALVE.1
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5
REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.
ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,
VS-SP, NO RETARD TYPE WATER FLOW SWITCH.
A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED
TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.
BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER
MANUFACTURER'S INSTRUCTION.
INSTALL PER MANUFACTURER'S INSTRUCTION.
INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4
All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.
All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved
All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.
All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest edition, and PBS P-100 requirements.
The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance
Side outlet rubber gasketed mechanical tee type fittings are not allowed.
A.
B.
C.
D.
E.
per contact requirements to witness the test.
The end of any new branch line shall have its hanger rod extended to the pipe, or have F.
a surge clip installed.
ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C2103.
EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600
EQUIP. RM.
MCH
959.36
BLDG
C2203
CUST.
CST
33.78
BLDG
22CORB
CORR.
CRH
611.51
BLDG
DOWN 1
CUT IN NEW CHECK VALVE
AFTER EXISTING CONTROL VALVE.
REPLACE EXISTING WATER FLOW SWITCH
WITH ZERO DELAY WATER FLOW SWITCH,
INSTALL AUTOMATIC AIR RELEASE VALVE/S
ELEVATOR MACHINE RM. 2241:
AS NECESSARY TO RELEASE TRAPPED AIR.
FIRE ALARM CONTRACTOR SHALL CONNECT
WATER FLOW SWITCH TO THE BUILDING'S
FIRE ALARM SYSTEM.
CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2
REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3
EXISTING 2" CONTROL VALVE.1
DENOTES NEW F.P. PIPING
DENOTES EXISTING F.P. PIPING
REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5
REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.
ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,
VS-SP, NO RETARD TYPE WATER FLOW SWITCH.
A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED
TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.
BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER
MANUFACTURER'S INSTRUCTION.
INSTALL PER MANUFACTURER'S INSTRUCTION.
EXISTING TEST/DRAIN ASSEMBLY.4
All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.
All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved
All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.
All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, 2013 latest edition, and PBS P-100 requirements.
The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance
Side outlet rubber gasketed mechanical tee type fittings are not allowed.
A.
B.
C.
D.
E.
per contact requirements to witness the test.
The end of any new branch line shall have its hanger rod extended to the pipe, or have F.
a surge clip installed.
EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6
Statement of Intellectual Property
The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.
This information is protected under U.S. Copyright Law, all rights reserved.
© Copyright 2016
65 MARKET STREET
MOUNT CLEMENS, MI 48043
P 586.469.3600
EX
IS
TI
NG
D
RA
IN
L
IN
E
6 6
7 6
8 8 8
INSTALL A NEW HYDRAULICALLY CALCULATED
WET PIPE SYSTEM COMPLETE WITH NEW
CONTROL VALVE WITH TAMPER SWITCH,
ELECTRICAL SWITCHGEAR RM. 2711:
DEVICE PIPED TO THE BUILDING'S EXPRESS
DRAIN, ALL NEW PIPE, FITTINGS, HANGER
ASSEMBLIES AND SPRINKLER HEADS
EQUIPPED WITH U.L LISTED HEAD GUARDS.
NO NEW PIPING OR SPRINKLER HEADS SHALL
POSITIONED ABOVE, OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .