VMI00041_Drawings.pdf

PDF 7 MB Posted

Attached to
Sprinkler Protection Upgrades Federal contract opportunity
Solicitation number
GS05P16SVC7088
Issued by
General Services Administration Public Buildings Service Region 5

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Sprinkler Protection Upgrades, newest first.
File Type Posted
Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\02_CAD\G001.dwg, 5/20/2016 8:47:34 PM, asowinski

" B

F 60 to be approved

SIGNAGE

HVAC CONTROLS

and DUPLEX OUTLET

TELE. WALL JACK

PUSH BUTTON

KEY SWITCH or or DIMMERCARD READER LIGHT SWITCH

FIN. FLR.

LINE

by Architect

" S

TD

4"

FIN. FLR.

LINE

ITEM ALIGNMENT

TYPICAL WALL

4" MIN

Door

16" MAX

Mounting Height Schedule

WALL MOUNTED ACCESSORIES

Text. Graphic, and Size

NOTE:

W1 W2 W3 W4

W7W6W5

GRAVEL/STONE

SAND/GRAVEL

(VENEER FINISH)

SHIM MATERIAL

(GRANULAR MATERIAL)

(SUB-BASE MATERIAL)

PLYWOOD/PARTICLE

(NOTE MATERIAL)

(WOOD, METAL, ETC.)

(NOTE MATERIAL)

ACOUSTIC/THERMAL

/SEMI-RIGID

(NOTE MATERIAL)

(MARBLE, STONE)

(GRANITE, ETC.)

(SECTION/ELEVATION)

(NOTE MATERIAL)

WOOD/SOLID SPECIES

(FINISH MATERIAL)

(NOTE MATERIAL)

(CONTINUOUS

BLOCKING)

WOOD

STONE

CONCRETE

(SECTION)

CONC., STONE,

PLASTER

(ELEVATION)

RIGID

BRICK

ALUMINUM, ETC.

STEEL/COPPER, METAL,

(NOTE MATERIAL)

(CONCRETE BLOCK

C.M.U.

BATT OR BLANKET

(NOTE TYPE)

INSULATION

CARPET

INSULATION

ACOUSTIC/THERMAL

(NOTE TYPE)

JOINT FILLER

PLASTER GYPSUM/

CEMENTITIOUS ON

METAL LATH

(NOTE MATERIAL)

GYPSUM WALL

BOARD

BOARD

Material Poche Indications

GROUT SOLID CELLS

C.M.U. - SOLID OR

NOT ALL HEIGHTS SHOWN ARE TYPICAL FOR ALL ITEMS WHERE THEY OCCUR

UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS, (B.F. DENOTES BARRIER FREE REQUIREMENTS)

NOT ALL ITEMS SHOWN ON THIS DRAWING MAY OCCUR ON THIS PROJECT

WATER HEATER

WATER CLOSET

WATERPROOFING

WATER RESISTANT

WELDED WIRE FABRIC

WELDED WIRE MESH

WIDTH, WIDE, WEST

VINYL COMPOSITION TILE

VINYL RESILIENT STRIP

VINYL WALL COVERING

WALL HYDRANT

VAPOR BARRIER

TRANSFORMER

TOWEL & WASTE CABINET

UNLESS OTHERWISE NOTED

TOP & BOTTOM

THROUGH/THOUGHOUT

TOILET PAPER HOLDER

TONGUE AND GROOVE

TOP ELEVATION

TOP OF CURB

TOP OF STEEL

TOP OF CONCRETE

TANGENT POINT

TEMPERATURE, TEMPERED

VAPOR RETARDER

E

FIRE EXTINGUISHER CABINET

FURR

FVC

FD

FLUOR

FTG

FDN

FA

FS

FLD

FHS

FPR

FEC

FL

FURR(ED), (ING)

FIRE VALVE CABINET

FIRE HOSE STATION

FIRE PROOFING

FLOOR(ING)

FLOOR DRAIN

FLUORESCENT

FOUNDATION

FRESH AIR

FOOTING

FAR SIDE

FIELD

MCC

MTD

MULL

MOUNT(ED), (ING)

MOTOR CONTROL CENTER

MULLION

ELECTRIC WATER COOLER

EXPOSED CONSTRUCTION

FOC

FIN

FF

F°

FT

FE

EXT

F

EQUIP

ESC

EXH

EXP CONST

EB

EJ

EMER

ENC

EQ

ELEV

EL

EXTERIOR

FACE OF CONCRETE

FACTORY FINISH

FEET/FOOT

FINISH(ED)

FIRE EXTINGUISHER

DEGREES FAHRENHEIT

ELEVATION

ELEVATOR

EMERGENCY

ENCLOS(E), (URE)

ESCALATOR

EXPANSION BOLT

EXPANSION JOINT

EQUIPMENT

EXHAUST

EQUAL

EA

EW

ELEC

EWC

EF

E

EACH FACE

EACH WAY

ELECTRIC(AL)

EACH

EAST

MEZZ

mm

MIN

MIR

MISC

MISC

MET T.

ML

MON.

MET

MDS

MC

MED

MEM

MILLIMETER(S)

METAL DIVIDER STRIP

METAL THRESHOLD

MISCELLANEOUS

MISCELLANEOUS IRON

MEZZANINE

MINIMUM

MIRROR

METAL LATH

MONITOR(ED)

METAL

MEDICINE CABINET

MEDIUM

MEMBER

SWITCH

SUPPORTS

SUSPENDED

SWITCHBOARD

SWITCHGEAR

SYMMETRY(ICAL)

SUPP

SUSP

SW

SWBD

SWGR

SYM

GP

GWB

GYP L

GALV

GL

g

GRD

GYP

GR

G

GA

GAL

GYPSUM PLASTER

GYPSUM WALL BOARD

GYPSUM LATH

GAGE, GAUGE

GLASS, GLAZING

GRADE, GRADING

GALVANIZED

GRAM

GROUND

GYPSUM

GALLON

OPPOSITEOPP

OA

OH

OD

OPP HD

Oz

OS

ORIG

OUTSIDE DIAMETER

OVERHEAD

OUTSIDE AIR

OUNCE

ORIGINAL

OPPOSITE HAND

OUTSIDE

NATURAL COLOR ANODIZED

NATURALNAT

NOT TO SCALENTS

OFF

O/C

OPG

O

NO (#)

OFFICE

OPENING

ON CENTER(S)

NUMBER

NIC

NRC

NOM

NEG

NCA

NA

N

NOT APPLICABLE

NOT IN CONTRACT

NORTH

NOMINAL

COEFFICIENT

NOISE REDUCTION

NEGATIVE

N

EPDM ETHYLENE PROPYLENE

DIENE MONOMERS

FULLY-ADHEREDFSRS

SHEET ROOFING SYSTEM

MEMB MEMBRANE

REV REVISION(S), REVISED

LHR LEFT HAND REVERSE

DF

DIM

DO

DT

DWG

D/W

DN

DET

DIFF

DIAG

DL

DRINKING FOUNTAIN

DEAD LOAD

DIAMETER

DIFFUSER

DIMENSION

DISHWASHER

DOOR OPENING

DRAIN TILE

DIAGONAL

DOWN

DRAWING

DETAIL

MANUFACTURE(R)MFR

MAT

MAX

MECH

MAR T.

MKB

MAR

MO

MAS

MARKER BOARD

MASONRY OPENING

MARBLE THRESHOLD

MATERIAL(S)

MAXIMUM

MECHANICAL

MARBLE

MASONRY

M

MH

MAG

LLV

L.P.

LV

LOC

LL

LG

LLBB

LLH

LLO

L

LT

LP

LIN

LTG

LOCATE/LOCATION

LOW VOLTAGE

LONG LEG VERTICAL

MAGNETIC

MANHOLE

LOW POINT

LIGHTING PANEL

LINEAR, LINEAL

LONG LEGS BACK

LONG LEG HORIZONTAL

LONG LEG OUTSTANDING

LIVE LOAD

TO BACK

LONG

LENGTH

LIGHT

LIGHTING

STORAGESTOR

STREET

STORM DRAIN

STRUCTURAL

SUPPLY AIR

STRUCT

SD

ST

SA

SEALERSEAL

SHEET

SIMILAR

SERVICE SINK

SINK

SOUTH

SOIL BORING

SPEAKER

SQUARE

SQUARE FOOT (OR STOREFRONT)

STAGGERED

SECTION

SOUND TRANSMISSION CLASS

SPACER, SPACING

SPECIFICATION(S)

SQUARE CENTIMETER

STAINLESS STEEL

SHORT LEG OUTSTANDING

STONE

STEEL

STATION

STANDARD

SPK

SPEC(S)

STAG

SST

STN

STA

STL

STD

SQ

cm

SF

SHT

SIM

STC

SPC

SLO

SECT

SK

SB

S

SS

RIGHT HAND

RISER

ROAD

RIGHT OF WAY

ROOF DRAIN

RIGHT HAND REVERSE

ROOM

ROOF SUMP

ROOFING

RUBBER

SANITARY

SCHEDULE

SCORED JOINT

RECEPTACLE

ROUGH OPENING

SANITARY NAPKIN DISPENSER

SANITARY NAPKIN WASTE

RUB

SAN

SND

SNWR

SCH

SJ

S

RHR

ROW

RFG

RD

RS

RM

RO

RH

R

Rd

INCLUDE(D), (ING)INCL

CARD READERCR

CONCRETE MASONRY UNIT

CONTINUOUS OR CONTINUE

CORRUGATED OR CORRIDOR

CONCEALEDCONCE

D

DPR

DP

CTR

CYL

CTSK

CF

CY

CONST

CONT

CONST JT

CORR

CONTR

CJ

CONC

CMU

CONN

CYLINDER

COUNTERSUNK

CUBIC FOOT

CUBIC YARD

DAMPROOFING

DAMPER

CENTER

CONCRETE

(CONCRETE BLOCK)

CONNECTION

CONSTRUCTION

CONTRACT(OR)

CONTROL JOINT

CONSTRUCTION JOINT

CER

CW

COL

COMB

CHK

COMP

CT

CL

CLOS

CO

CHDK PL

CLG

CEM

CM

C TO C

C°

CPT

CES

CB

CIP

CI

CERAMIC

CERAMIC TILE

COAT HOOK

CLEAR(ANCE)

CLEAN OUT

COLD WATER

COMBINATION

COMPRESS(ED),(ION),(IBLE)

CHECKERED PLATE

COLUMN

CLOSET

CARPET(ED)

CARPET EDGE STRIP

CAST IRON

CATCH BASIN

CENTER TO CENTER

CENTIMETER(S)

CAST-IN-PLACE

DEGREES CENTIGRADE

CEILING

CEMENT

LAB

LAV

LH

LAM

LCC

KO

L kg/m

K

KIT

KSI

kg/cm 2 kg

KV

KW

KVA

KWH

LABORATORY

LEAD COATED COPPER

LAMINATE(D)

LAVATORY

LEFT HAND

KNOCKOUT

KILOVOLT/AMPERE

KILOWATT-HOUR

KILOGRAM PER METER

KILOGRAM PER SQUARE

KIPS PER SQUARE INCH

CENTIMETER

KITCHEN

KIPS

KILOGRAMS

KILOVOLT

KILOWATT(S)

JST

JB

K

J

JT

JC

INTERM

INV

IRR

INT

INFO

INSUL

ICA

ID

JUNCTION BOX

JANITOR'S CLOSET

JOIST

JOINT

INSULATE(D), (ION)

INTEGRAL COLOR

INTERMEDIATE

INSIDE DIMENSION

INTERIOR/INTERNAL

ANODIZED

INVERT

IRRIGATION

INFORMATION

ABOVE REFERENCE FLOOR

ACOUSTICAL TILE (OR ACTIVE)

ADDENDUM

ALTERNATE OR ALTERNATIVE

BLKG

BL

C

CABT

BOT

BLDG

BC

BD

BS

BRG

BM

BETW

BIT

B.F.

BP BP

B

L

BLOCKING

BOTH SIDES

BOTTOM OF CURB

BUILDING LINE

CABINET

BOARD

BOTTOM

BUILDING

BARRIER FREE

BASE PLATE OR

BITUMINOUS

BEARING P

BENCH MARK OR BEAM

BEARING

BETWEEN

L

AB

ANOD

ARCH

ASPH

AUTO

AGG

A/C

ALT

ANCH

AL,ALUM

ACCT

AC

ACT

ADD

ADJ

AP

A

ARF

AFF

AGGREGATE

AIR CONDITIONING

ANCHOR BOLT

ANODIZED

ARCHITECT(URAL)

AUTOMATIC

ALUMINUM

ANCHOR, ANCHORAGE

ASPHALT

ACOUSTICAL

ADJACENT

ACCESS PANEL

ABOVE FINISHED FLOOR

ACCENT

HARDWOODHWD

I

IN(")

HP

HB

HW

HR

HWH

H

HS

HC

HM

HORIZ

HP

HTG

H&V

HVAC

HT

HORSE POWER

HOT WATER HEATER

INCH(ES)

HOSE BIBB

HOT WATER

HOUR

AIR CONDITIONING

HIGH STRENGTH

HOLLOW CORE

HOLLOW METAL

HEATING & VENTILATING

HEATING/VENTILATION/

HIGH

HORIZONTAL

HIGH POINT

HEATING

HEIGHT

H

HDCP

HDWE

HDBD

HANDICAP(PED)

HARDWARE

HARDBOARD

VINYLVIN

PE PASSENGER ELEVATOR

RECEIVING

REFERENCE

REFRIGERATOR

REQUIRED

RESILIENT

RESILIENT TILE

REGISTER

RETURN AIR

RECESS(ED)

RADIUS, RADIATOR, RADIATION

RAINWATER CONDUCTOR

REFLECT(ED), (IVE), (OR)

REINFORCE(D), (ING)

QUARRY TILE

QUARRY TILE BASE

RECVG

REF

REFL

REFR

REG

REINF

REQD

RESIL

REC

RT

RA

RAD

QB

R

RC

QT

PERMANENT

PLASTER

PLASTIC LAMINATE

PLATE

PLUMBING

PLYWOOD

POLISHED

POUND(S)

PREFABRICATE(D)

POLYVINYL CHLORIDE

POUNDS PER CUBIC FOOT

POUNDS PER FOOT

POUNDS PER LINEAL FOOT

POUNDS PER SQUARE FOOT

PRECAST CONCRETE

PCF

PPF

PSF

PLF

PRE-FAB

Q

PC

lb/#

PERM

PLAS

PL

PLBG

PLWD

POL

PVC

PL

WITHOUTW/O

YD

WD

Y

YARD

WOOD

WH

WT

WWF

WWM

W W/

WM

WC

WP

WR

WS

WAIN

WHYD

W

VRS

VCT

VWC

VIT

WEIGHT

WITH

WATER MAIN

WATERSTOP

WAINSCOT

VITREOUS

PAINT(ED) (OR POINT)

PANEL

PARKING

PARTICLE BOARD

PARTITION

PAIR

PHYSICALLY HANDICAPPED

PAPER TOWEL DISPENSER

PAPER TOWEL DISPENSER &

RECEPTACLE COMBINATION

PT

PNL

PTD

PTD/R

PKG

PBD

PARTN

PH

PR

P

VA

VB

VAR

VERT

VEST

UR

V

U

UH

UON

TWC

TRAN

T

TYP

VARNISH

VERTICAL

VESTIBULE

VALVE

URINAL

UNIT HEATER

TREAD

TYPICAL

T&G T&B

TE

TOC

TC

TOS

THRES

THRU

TOIL

TPH

TOL

TEL

TV

TEMP

TERR

THERM

THK

TKB

TP

T

THRESHOLD

TOLERANCE

TOILET

TELEPHONE

TELEVISION

TERRAZZO

THICK(NESS)

THERMOSTAT

TACKBOARD

Abbreviations

VR

ETR EXISTING TO REMAIN

ADDITIONALADD'L

SPECIFIEDSPEC'D

EP EPOXY

R (CONT.)

CHAN CHANNEL

NONCOMB NONCOMBUSTIBLE

FWP FABRIC WRAPPED PANEL

PERPENDICULAR

CHANNEL

LC CENTERLINE

ANGLE

LP

AT

AND

ROUND

PLATE

THE ENTRY DOOR NUMBER SHALL BE THE

SAME AS THE ROOM NUMBER - IF MORE THAN

ONE (1) DOOR IS INDICATED ON THE PLAN FOR

GENERAL NOTE

SHEET NUMBER FROM WHICH DRAWING IS

REFERENCED

SHEET NUMBER WHERE SECTION IS LOCATED

DETAIL NUMBER

DARKENED ARROW INDICATES ELEVATED WALL

SHEET NUMBER WHERE ELEVATION IS LOCATED

REF. FLR.

EL. 00'-0"

DETAIL NUMBER

DETAIL TITLE

DETAIL NUMBER

DRAWING SCALE

ROOM NUMBER

ONE ROOM, EACH DOOR IN THAT AREA

WILL BE IDENTIFIED

Graphic Symbols

Drawing 3/4" = 1'-0"

A5-03

A1-03

KEY NOTE SYMBOL INDICATES WORK AS

A3-02

A8-03

ADD'L SHEET(S) FROM WHICH DRAWING IS

NOTE: ELEVATION SYMBOL USED FOR

INTERIOR & EXTERIOR ELEVATIONS.

REFERENCED

NOTE: SECTION SYMBOL USED FOR

WALL & BUILDING SECTIONS.

A

Line Type Designation

EXISTING ITEM TO REMAIN

EXISTING ITEM TO BE REMOVED

NEW ITEM AS NOTED

LOBBY

100A

Text Symbols

NOTE: SYMBOL INDICATES A SPECIFIC

HEIGHT IN AN ELEVATION OR SECTION VIEW

8'-0"

WALL TYPE SYMBOL INDICATES WALL TYPE DESIGNATION - REFER TO

WALL TYPE DRAWINGS FOR ADD'L INFO. SHEET A1-2

HEIGHT OF FINISHED CEILING ABOVE FINISHED FLOOR

IN AN ELEVATION OR SECTION VIEW

DESCRIBED IN KEYNOTE LIST ON SAME DRAWING

SHEET AS KEYNOTE OCCURS

BRK BRICK

FB FACE BRICK

QUARTERQTR

RUBBER BASE (OR RESILIENT BASE)RB

(OR SPORTS FLOORING)

TT TERRAZZO TILE

VINYL TILE

x'-x

VT

SEALED CONCRETES.CONC

LSWD LINEAR SUSPENDED WOOD CEILING

HEIGHT OF FINISHED CEILING ABOVE FINISHED FLOOR

IN A PLAN VIEW

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607

P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\02_CAD\G002.dwg, 5/20/2016 8:48:07 PM, asowinski

8 8

DN

B103A

B108

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

AREA OF WET FIRE PROTECTION SYSTEM ALTERATIONS -

REFER TO FIRE PROTECTION DRAWINGS. PAINT AND

LABEL NEW PIPING MODIFICATIONS.

EXISTING WET PIPE SPRINKLER SYSTEM TO BE

MAINTAINED W/ SYSTEM ALTERATIONS AS PART OF A

SEPARATE CONSTRUCTION PROJECT. COORDINATE WET

PIPE DISCONNECT AND ALTERATIONS WITH SEPARATE

PROJECT CONTRACTOR AND OWNER'S PROJECT

MANAGER.

NEW NON-RATED MASONRY BLOCK WALL PENETRATION -

CORE WALL AND TOUCH UP WALL FINISH.

NEW MASONRY INFILL AT REMOVED PIPE PENETRATION.

REMOVE AND REPLACE CONC BLOCK WALL

CONSTRUCTION - MATCH EXISTING BLOCK DIMENSION.

TOUCH UP WALL FINISH.

GENERAL NOTES:KEY NOTES (continued):

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N. REFER TO SPECIFICATION FOR

TRACKING SATE DISPOSAL RECORDS TO BE

SUBMITTED.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

7RELOCATED HORIZONTAL FIRE PROTECTION RISER

(MODIFIED) - REFER TO FIRE PROTECTION DRAWINGS.

PAINT AND LABEL NEW PIPES.

NEW FLOOR MOUNTED DRY PIPE FIRE PROTECTION RISER

W/ NITROGEN GENERATOR AND COMPRESSOR ON 4"

CONC PAD - REFER TO FIRE PROTECTION DRAWINGS.

NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE

CEILING (UL DESIGN W-J-1053). CORE EXISTING WALL

FOR PIPE PENETRATION AND FIRE STOPPING

INSTALLATION. TOUCH UP EXPOSED WALL FINISHES IN

UTILITY ROOMS.

NEW 2-HOUR FIRE RATED WALL PENETRATIONS ABOVE

CEILING (UL DESIGN W-J-1053 W/ MODIFICATIONS).

CORE EXISTING MASONRY WALL FOR PIPE PENETRATION

AND FIRE STOPPING INSTALLATION. TOUCH UP EXPOSED

WALL FINISHES IN UTILITY ROOMS/AREAS.

EXISTING 2'x2' ACOUSTICAL LAY-IN CEILING TILE AND GRID

TO BE REMOVED AND REINSTALLED FOR NEW PIPING

INSTALLATION.

AREA OF FIRE PROTECTION SYSTEM ALTERATION TO A

DRY PIPE SYSTEM - REFER TO FIRE PROTECTION

DRAWINGS. PAINT AND LABEL NEW PIPING

MODIFICATIONS.

KEY NOTES:

DN

B103A

B108

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

EXISTING FIRE PROTECTION RISER TO BE REPLACE -

REFER TO FIRE PROTECTION DRAWINGS. PAINT AND

LABEL NEW FIRE PROTECTION RISER AND PIPING.

AREA OF FIRE PROTECTION SYSTEM MODIFICATION -

REFER TO FIRE PROTECTION DRAWINGS. PAINT AND

LABEL NEW FIRE PROTECTION PIPING.

EXISTING PIPING/ELEC BUS DUCT PENETRATIONS TO BE

SEALED W/ FIRE STOPPING. TOUCH UP FINISHES ON

EXPOSED UTILITY ROOMS.

NEW 1-HOUR FIRE RATED MASONRY WALL PENETRATION

(UL DESIGN W-J-1053). CORE EXISTING WALL FOR PIPE

PENETRATION AND FIRE STOPPING INSTALLATION. TOUCH

UP EXPOSED WALL FINISHES.

REMOVE AND RE-INSTALL EXISTING LAY-IN CEILING AND

GRID TO COMPLETE WORK.

GENERAL NOTES:KEY NOTES:

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\03_Archives\08 _ 100% CD\CAD\AJ-1-B2.dwg, 5/23/2016 10:59:16 AM, asowinski

GENERAL NOTES:

EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP

NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.

MODIFIED FIRE PROTECTION RISER - REFER TO FIRE

PROTECTION DRAWINGS / SPECIFICATIONS.

NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE

CEILING (UL DESIGN W-J-1053). CORE EXISTING

WALL FOR PIPE PENETRATION AND FIRE STOPPING

INSTALLATION. TOUCH UP EXPOSED WALL FINISHES

IN UTILITY ROOMS.

NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN

FIELD. PAINT AND LABEL PIPING.

NEW 2'x2' ACCESS PANELS W/ LOCKING LATCH -

POSITION FOR PIPE INSTALLATION/SERVICE.

COORDINATE W/ EXISTING LIGHTING LAYOUT (V.I.F.).

EXISTING GYP BD CEILING. 24" WIDE AREA TO BE

REMOVED AND REPLACED FOR DRAIN PIPE

INSTALLATION. PAINT TO MATCH ADJACENT CEILING

COLOR - MATCH FINISH TEXTURE.

AREA OF FIRE PROTECTION SPRINKLER

MODIFICATIONS - REFER TO FIRE PROTECTION

DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL

NEW PIPING MODIFICATIONS.

NOT USED.

NOT USED.

KEY NOTES:

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP

NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.

MODIFIED FIRE PROTECTION RISER - REFER TO FIRE

PROTECTION DRAWINGS / SPECIFICATIONS.

NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE

CEILING (UL DESIGN W-J-1053). CORE EXISTING

WALL FOR PIPE PENETRATION AND FIRE STOPPING

INSTALLATION. TOUCH UP EXPOSED WALL FINISHES

IN UTILITY ROOMS.

NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN

FIELD. PAINT AND LABEL PIPING.

NEW 2'x2' ACCESS PANELS W/ LOCKING LATCH -

POSITION FOR PIPE INSTALLATION/SERVICE.

COORDINATE W/ EXISTING LIGHTING LAYOUT (V.I.F.).

EXISTING GYP BD CEILING. 24" WIDE AREA TO BE

REMOVED AND REPLACED FOR DRAIN PIPE

INSTALLATION. PAINT TO MATCH ADJACENT CEILING

COLOR - MATCH FINISH TEXTURE.

AREA OF FIRE PROTECTION SPRINKLER

MODIFICATIONS - REFER TO FIRE PROTECTION

DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL

NEW PIPING MODIFICATIONS.

NOT USED.

NOT USED.

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

GENERAL NOTES:KEY NOTES:

1 8

UP

DN

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP

NEW TEST DRAIN INTO NEW DRAIN - REFER TO MECH.

MODIFIED FIRE PROTECTION RISER - REFER TO FIRE

PROTECTION DRAWINGS / SPECIFICATIONS.

NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE

CEILING (UL DESIGN W-J-1053). CORE EXISTING

WALL FOR PIPE PENETRATION AND FIRE STOPPING

INSTALLATION. TOUCH UP EXPOSED WALL FINISHES

IN UTILITY ROOMS.

NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN

FIELD. PAINT AND LABEL PIPING.

NOT USED.

NOT USED.

AREA OF FIRE PROTECTION SPRINKLER

MODIFICATIONS - REFER TO FIRE PROTECTION

DRAWINGS AND SPECIFICATIONS. PAINT AND LABEL

NEW PIPING MODIFICATIONS.

EXISTING 2'x2' ACOUSTICAL LAY-IN CEILING TILE AND

GRID TO BE REMOVED AND REINSTALLED FOR NEW

DRAIN PIPE INSTALLATION.

NOT USED.

GENERAL NOTES:KEY NOTES:

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP NEW

TEST DRAIN INTO NEW DRAIN - REFER TO MECH. / FIRE

PROTECTION.

MODIFIED FIRE PROTECTION RISER - REFER TO FIRE

PROTECTION DRAWINGS / SPECIFICATIONS.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

AREA OF FIRE PROTECTION SPRINKLER MODIFICATIONS -

REFER TO FIRE PROTECTION DRAWINGS AND

SPECIFICATIONS. PAINT AND LABEL NEW PIPING

MODIFICATIONS.

NOT USED.

NOT USED.

GENERAL NOTES:KEY NOTES:

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607 in Architecture, PLC

EXISTING MAIN FIRE SPRINKLER TEST DRAIN. TAP NEW

TEST DRAIN INTO NEW DRAIN - REFER TO MECH.

MODIFIED FIRE PROTECTION RISER - REFER TO FIRE

PROTECTION DRAWINGS / SPECIFICATIONS.

NEW 1-HOUR FIRE RATED WALL PENETRATION ABOVE

CEILING (UL DESIGN W-J-1053). CORE EXISTING WALL

FOR PIPE PENETRATION AND FIRE STOPPING

INSTALLATION. TOUCH UP EXPOSED WALL FINISHES IN

UTILITY ROOMS.

NEW FIRE PROTECTION TEST DRAIN - VERIFY ROUTE IN

FIELD. PAINT AND LABEL PIPING.

EXISTING DRAIN LINE TO REMAIN - REFER TO FIRE

PROTECTION.

NOT USED.

AREA OF FIRE PROTECTION SPRINKLER MODIFICATIONS -

REFER TO FIRE PROTECTION DRAWINGS AND

SPECIFICATIONS. PAINT AND LABEL NEW PIPING

MODIFICATIONS.

NOT USED.

EXISTING EXPOSED CEILING - COORDINATE NEW HANGER

INSTALLATION AND DRAIN PIPE INSTALLATION WITH

EXISTING EQUIPMENT, DUCT WORK, LIGHTING.

GENERAL NOTES:KEY NOTES:

A. ALL DEMOLITION DRAWINGS AND DEMOLITION

DETAILS ARE PROVIDED TO SHOW THE GENERAL

SCOPE OF THE DEMOLITION WORK. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL

DEMOLITION WORK NECESSARY TO ACCOMPLISH

NEW WORK. THE DEMOLITION DRAWINGS AND

DETAILS MAY NOTE TYPICAL ITEMS IN SOME AREAS,

WHICH APPLY IN OTHER AREAS (AND ARE

DESIGNATED WITH DASHED, HIDDEN OR STRUCK

THRU LINES). COORDINATE ALL DEMOLITION WORK

WITH ALL ARCHITECTURAL, MECH. AND ELEC.

DRAWINGS. CONTRACTOR IS RESPONSIBLE TO

REFERENCE ALL DRAWINGS/ SPECIFICATIONS TO

CONFIRM EXTENT OF DEMOLITION WORK.

B. ALL REMOVED ITEMS, WALLS, FLOORS, CEILINGS,

OPENINGS, ETC ARE TO BE PATCHED/REPAIRED AND

PREPPED TO RECEIVE NEW WORK AND/OR

FINISHES.

C. ALL CONSTRUCTION AND DEMOLITION MEANS,

METHODS AND SAFETY PRECAUTIONS SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

D. REMOVE ALL ITEMS PROJECTING FROM EXISTING

WALLS OR FLOORS TO REMAIN (BLOCKING,

SCREWS, FASTENERS, PIPES, CONDUITS,

MOUNTING PLATES, FIXED EQUIPMENT, ETC).

PATCH AND REPAIR FOR NEW FINISH.

E. CONTRACTOR IS RESPONSIBLE FOR FIELD

VERIFYING AND UNDERSTANDING EXISTING

CONDITIONS, PRIOR TO BIDDING

F. CONTRACTOR SHALL PROTECT EXISTING BUILDING

ELEMENTS AND SITE FROM DAMAGE CAUSED BY

CONSTRUCTION OR CONSTRUCTION TRADES.

CONTRACTOR SHALL REPAIR ALL DAMAGED AREAS

(IDENTIFIED BY OWNER OR ARCHITECT) AT NO

ADDITIONAL COST.

G. ASBESTOS AND OTHER HAZARDOUS MATERIALS

WILL BE REMOVED BY OWNER'S ABATEMENT

CONTRACTOR PRIOR TO START OF CONSTRUCTION.

IF ANY SUSPECTED HAZARDOUS MATERIAL IS

ENCOUNTERED, STOP WORK IN THAT AREA AND

IMMEDIATELY INFORM THE ARCHITECT AND OWNER.

H. DISPOSE OF ALL DEMOLITION MATERIALS LEGALLY

OFF-SITE, U.O.N.

I. ALL EQUIPMENT AND FURNISHINGS NOT

SPECIFICALLY NOTED TO BE REMOVED SHALL BE

RELOCATED AND REST OR PROTECTED IN PLACE TO

COMPLETE WORK (V.I.F.)

J. COORDINATE ARCHITECTURAL WORK SCOPE AND

SCHEDULE W/ FIRE PROTECTION AND MECH / ELEC

TRADES.

P:\2015\15-166-GSA PVM Building Sprinkler Protection Upgrds\03_Archives\08 _ 100% CD\CAD\AJ-1-27.dwg, 5/23/2016 10:58:12 AM, asowinski

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

EX

IS

T.

W

ET

EX

IS

T.

W

ET

P

IP

E

SU

PP

LY

EXIST. WET

N.I.C.

N.I.C.

N.I.C.

N.I.C.

APPROXIMATE POINT OF CONNECTION FOR NEW WET PIPE

FEED FOR NEW DRY PIPE SYSTEM.

INCREASE NEW PIPE TO 6" DIAMETER TO ACCOMODATE

NEW DRY PIPE VALVE.

DEMO EXISTING WET PIPE, VALVE, DRAIN AND FLOW SWITCH2

APPROXIMATE LOCATION OF NEW DRY PIPE VALVE, COMPLETE , 3

W/CONTROL VALVE, TAMPER SWITCH, HIGH-LOW AIR SWITCH,

NITROGEN GENERATOR UNIT COMPLETE WITH COMPRESSOR,4

CONNECTION POINT OF NEW DRY PIPE SUPPLY TO EXISTING

LOADING DOCK SUPPLY MAIN. REMOVE GROOVED 90 TO CONNECT.

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

ISOLATION VALVE AND PRV TEST HEADER TO REMAIN.

N.I.C.

CONVERT THE EXISTING WET-PIPE SPRINKLER SYSTEM TO A

BASEMENT LEVEL LOADING DOCK AND ASSOCIATED ROOMS:

FIRE ALARM CONTRACTOR SHALL CONNECT TAMPER

SWITCH ANDPRESSURE SWITCHES TO THE BUILDING'S

FIRE ALARM SYSTEM.

DRY PIPE SPRINKLER SYSTEM FOR THE AREAS INDICATED

IN THE AREA PLAN, IN ADDITION TO PROVIDING A COMPLETE

COORDINATE ALL IMPAIRMENTS TO THE SYSTEM WHILE

PERFORMING PIPING TIE-INS WITH GSA CONTRACT AND

PROJECT MANAGERS.

AND FUNCTIONAL NITROGEN GENERATOR SUPPLY SYSTEM.

ALL NECESSARY TRIM. MIN. CAPACITY REQ'D IS 270 U.S. GAL.

PIPE ROUTING AND CONNECTION POINTS TO BE ADJUSTED BY

F.P. CONTRACTOR AS REQUIRED BY SITE CONDITIONS.

NITROGEN VENT, IF RISER MOUNTED. 120V SINGLE4A

4A

PHASE POWER WHERE REQUIRED.

120V SINGLE PHASE POWER REQUIRED.

DISCONNECT EXISTING SPRINKLER HEAD FROM WET SYSTEM.

FEEDING LOADING DOCK.

PRESSURE ALARM SWITCH, AND ALL NECESSARY TRIM.

CAP OFF IN HEATED CORRIDOR.

AND STORAGE TANK. CONNECT TO DRY PIPE VALVE, INCLUDING

PROVIDE SIGNAGE IN ACCORDANCE WITH GSA REQUIREMENTS

STATING : ISOLATION VALVE TO REMAIN CLOSED EXCEPT

WHEN PERFORMING ANNUAL PRV TESTING. PROVIDE PROOF

COPY TO GSA FOR APPROVAL PRIOR TO SIGNAGE INSTALLATION.

6 INSTALL DRUM DRIP DRAIN ON DROP TO PRV ISOLATION VALVE.

PROVIDE APPROPRIATE ADAPTER AT MAIN DRAIN VALVE

FOR 2.5" FIRE HOSE FOR DISCHARGE TO LOADING DOCK DRAIN.

4A

NEW WET

NE

W

D

RY

OF DPV IS WET.

ALL PIPING

DOWNSTREAM OF

DPV IS DRY/NITROGEN

SUPERVISED.

ALL PIPE UPSTREAM

A COMPLETE TRAINING SESSION BY THE NITROGEN GENERATOR

SYSTEM'S MANUFACTURER'S REPRESENTATIVE SHALL BE

INCLUDED IN THIS PROJECT BEFORE TURNOVER TO THE

OWNER FOR FINAL ACCEPTANCE.

LOADING DOCK F.F.

EX

IS

T.

W

ET

NE

W

W

ET

OPTION NO. 1: ADDITIONAL FIRE PROTECTION PIPING REPLACEMENT

FOR A COMPLETE SYSTEM REPLACEMENT, SPECIFIED IN DIVISION

211315 SPRINKLER SYSTEM MODIFICATIONS IN ROOMS B002 MECH,

B002A MECH, B004 MECH, B004A MECH, B005 MECH, B005A MECH,

B14 STORAGE, AND B48 LOADING DOCK.

HANGERS. REPLACED SYSTEM PIPING SHALL BE DESIGNED, HYDRAULICALLY

CALCULATED AND INSTALLED TO COMPLY WITH NFPA 13, LATEST ED.

INCLUDED IN THIS REPLACEMENT IS ALL SPRINKLERS, FITTINGS AND

FOR PROTECTION OF VESTIBULE.

9 NEW SPRINKLER HEAD CONNECTED TO NEW DRY PIPE SYSTEM.

INSTALL INSPECTOR'S TEST CONNECTION PER NFPA 13, 8.17.4.3.1.

COORDINATE FINAL LOCATION WITH OWNER.

NEW DRY

DN

B103A

B108

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600 F 586.469.3607

B1VPD

VERT. PEN.

CRV

200.40

VERT

B112A

VEST.

TTO

139.60

AMI04747

B115

CORR.

CRH

356.88

BLDG

SU

PP

LY

'-4

6' -4

9'

-6

6' 8'

-3

3' -6

9' -6

6 6

WEST RISER-EVEN FLOORS

EAST RISER-ODD FLOORS

131313 13

10A

10B

DN

B103A

B108

INSTALL A NEW HYDRAULICALLY CALCULATED

WET PIPE SYSTEM COMPLETE WITH NEW

CONTROL VALVE WITH TAMPER SWITCH,

BASEMENT LEVEL ELECTRICAL SWITCHGEAR ROOM:

DEVICE PIPED TO THE BUILDING'S EXPRESS

DRAIN, ALL NEW PIPE, FITTINGS, HANGER

ASSEMBLIES AND SPRINKLER HEADS

EQUIPPED WITH U.L LISTED HEAD GUARDS.

NO NEW PIPING OR SPRINKLER HEADS SHALL

POSITIONED ABOVE, OR RUN OVER THE

ELECTRICAL OR SWITCHGEAR EQUIPMENT.

THE EXISTING SPRINKLER SYSTEM FOR THIS ROOM

IS SHUT OFF, BUT SHALL REMAIN IN PLACE UNTIL

THE NEW SYSTEM HAS BEEN TESTED AND ACCEPTED.

ONCE ACCEPTED, THE OLD EXISTING SYSTEM AND

CONTROL VALVE SHALL BE REMOVED AND CAPPED OFF.

THE NEW SYSTEM CONTROL VALVE SHALL BE

LABELED "NOT-IN SERVICE" UNTIL THE NEW

SYSTEM HAS BEEN TESTED AND ACCEPTED.

ONCE ACCEPTED, THE "NOT-IN-SERVICE"

LABEL SHALL BE REMOVED.

THE DESIGN DENSITY FOR THIS AREA SHALL BE:

.20 GALLONS PER MINUTE OVER 1,500 SQUARE FEET,

ORDINARY HAZARD GROUP 2.

WATER FLOW SWITCH, INSPECTOR'S TEST/DRAIN

FIRE ALARM CONTRACTOR SHALL CONNECT TAMPER

SWITCH AND WATER FLOW SWITCH TO THE BUILDING'S

FIRE ALARM SYSTEM.

All work and material shall conform to NFPA #13, latest ed., and PBS P-100 requirements.

All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved

All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.

All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest ed., and PBS P-100 requirements.

The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance

Side outlet rubber gasketed mechanical tee type fittings are not allowed.

A.

B.

C.

D.

E.

per contact requirements to witness the test.

The end of any new branch line shall have its hanger rod extended to the pipe, or have F.

a surge clip installed.

POINT OF CONNECTION FOR NEW SUPPLY TO BASEMENT

CUT IN NEW GROOVED TEE INTO EXISTING 4" SUPPLY MAIN.

3" GROOVED BUTTERFLY VALVE W/TAMPER SWITCH.2

3" VIC 747 MANIFOLD, W/ WFS AND TEST/ DRAIN 3

CONNECTION ABOVE EXISTING LAY-IN CEILING IN CORRIDOR.

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

ELEVATIONS DENOTED AS [000'-0"] ARE FROM4

BASEMENT FLOOR, AND ARE FOR HYDRAULIC

DESIGN PURPOSES.

SWITCHGEAR ROOM NEW FIRE SPRINKLER SYSTEM.

EXISTING CONTROL VALVE AND WATER FLOW SWITCH,

TO REMAIN UNTIL NEW SYSTEM IS PLACED INTO SERVICE.

ABOVE LAY-IN CEILING IN CORRIDOR.

TIE IN DRAIN TO EXISTING.

COORDINATE LOCATION OF SPRINKLERS AND PIPING TO BE8

SURE ANY AND ALL HVAC ACCESS DOORS/PANELS ARE NOT

OBSTRUCTED.

POINT OF CONNECTION FOR NEW DRAIN LINE5

INTO EXISTING DRAIN LINE.

ELECTRICAL EQUIPMENT, APPROXIMATELY 7'-0" TALL, (VARIES). 6

10 TYPICAL 5.6 K QR UPRIGHT ON 1" SPRIG.

11 TYPICAL CONCRETE BEAM.

12 8" FIRE PROTECTION STANDPIPE.

HVAC DUCTWORK-INSTALL PROTECTION UNDER DUCTWORK OVER 48" WIDE.13

7 DENOTES HYDRAULIC DESIGN NODE.

10A TYPICAL 5.6 K QR UPRIGHT.

10B TYPICAL 5.6 K QR HORIZONTAL SIDEWALL.

BASEMENT LEVEL ELECTRICAL SWITCHGEAR ROOM:

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600

MECH.

CST

912.51

BLDG

13CORA

CORR.

CRH

603.27

BLDG

C1310

CUST.

CST

34.67

BLDG

TE

ST

/D

RA

IN

L

IN

E

2"

DRAIN RISER

DOWN

INSTALL REMOTE INSPECTOR'S TEST/DRAIN

ASSEMBLY AFTER NEW WATER FLOW SWITCH

AND PIPE TO EXISTING BLDG. EXPRESS DRAIN.

CUT IN NEW CHECK VALVE

AFTER EXISTING CONTROL VALVE.

REPLACE EXISTING WATER FLOW SWITCH

WITH ZERO DELAY WATER FLOW SWITCH.

INSTALL AUTOMATIC AIR RELEASE VALVE/S

ELEVATOR MACHINE RM. 1312:

AS NECESSARY TO RELEASE TRAPPED AIR.

FIRE ALARM CONTRACTOR SHALL CONNECT

WATER FLOW SWITCH TO THE BUILDING'S

FIRE ALARM SYSTEM.

CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2

REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3

EXISTING 2" CONTROL VALVE.1

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5

REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.

ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,

VS-SP, NO RETARD TYPE WATER FLOW SWITCH.

A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED

TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.

BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER

MANUFACTURER'S INSTRUCTION.

INSTALL PER MANUFACTURER'S INSTRUCTION.

INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4

All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.

All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved

All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.

All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, 2013 latest edition, and PBS P-100 requirements.

The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance

Side outlet rubber gasketed mechanical tee type fittings are not allowed.

A.

B.

C.

D.

E.

per contact requirements to witness the test.

The end of any new branch line shall have its hanger rod extended to the pipe, or have F.

a surge clip installed.

ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C1310.

EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600

MECH.

MCH

912.51

BLDG

14CORB

CORR.

CRH

603.27

BLDG

14CORC

CORR.

CRH

600.67

BLDG

C1410

CUST.

CST

34.67

BLDG

TE

ST

/D

RA

IN

L

IN

E

2 3

CUT IN NEW CHECK VALVE

AFTER EXISTING CONTROL VALVE.

REPLACE EXISTING WATER FLOW SWITCH

WITH ZERO DELAY WATER FLOW SWITCH,

INSTALL AUTOMATIC AIR RELEASE VALVE/S

ELEVATOR MACHINE RM. 1428:

AS NECESSARY TO RELEASE TRAPPED AIR.

FIRE ALARM CONTRACTOR SHALL CONNECT

WATER FLOW SWITCH TO THE BUILDING'S

FIRE ALARM SYSTEM.

CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2

REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3

EXISTING 2" CONTROL VALVE.1

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5

REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.

ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,

VS-SP, NO RETARD TYPE WATER FLOW SWITCH.

A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED

TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.

BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER

MANUFACTURER'S INSTRUCTION.

INSTALL PER MANUFACTURER'S INSTRUCTION.

All work and material shall conform to NFPA #13, latest edtion, and PBS P-100 requirements.

All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved

All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.

All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest edition, and PBS P-100 requirements.

The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance

Side outlet rubber gasketed mechanical tee type fittings are not allowed.

A.

B.

C.

D.

E.

per contact requirements to witness the test.

The end of any new branch line shall have its hanger rod extended to the pipe, or have F.

a surge clip installed.

INSTALL REMOTE INSPECTOR'S TEST/DRAIN

ASSEMBLY AFTER NEW WATER FLOW SWITCH

AND PIPE TO EXISTING BLDG. EXPRESS DRAIN.

INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4

ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C1410.

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600

CORR.

TTO

229.42

AMI04747

EQUIP. RM.

MCH

990.57

BLDG

C2103

CUST.

CST

33.78

BLDG

UP

DN

CUT IN NEW CHECK VALVE

AFTER EXISTING CONTROL VALVE.

REPLACE EXISTING WATER FLOW SWITCH

WITH ZERO DELAY WATER FLOW SWITCH,

INSTALL AUTOMATIC AIR RELEASE VALVE/S

ELEVATOR MACHINE RM. 2195:

AS NECESSARY TO RELEASE TRAPPED AIR.

INSTALL REMOTE INSPECTOR'S TEST/DRAIN

FIRE ALARM CONTRACTOR SHALL CONNECT

WATER FLOW SWITCH TO THE BUILDING'S

FIRE ALARM SYSTEM.

CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2

REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3

EXISTING 2" CONTROL VALVE.1

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5

REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.

ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,

VS-SP, NO RETARD TYPE WATER FLOW SWITCH.

A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED

TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.

BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER

MANUFACTURER'S INSTRUCTION.

INSTALL PER MANUFACTURER'S INSTRUCTION.

INSTALL NEW TEST/DRAIN ASSEMBLY. TIE IN TO BRANCH LINE,4

All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.

All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved

All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.

All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, latest edition, and PBS P-100 requirements.

The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance

Side outlet rubber gasketed mechanical tee type fittings are not allowed.

A.

B.

C.

D.

E.

per contact requirements to witness the test.

The end of any new branch line shall have its hanger rod extended to the pipe, or have F.

a surge clip installed.

ROUTE TO, AND TIE IN TO EXISTING 2" DRAIN RISER IN C2103.

EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600

EQUIP. RM.

MCH

959.36

BLDG

C2203

CUST.

CST

33.78

BLDG

22CORB

CORR.

CRH

611.51

BLDG

DOWN 1

CUT IN NEW CHECK VALVE

AFTER EXISTING CONTROL VALVE.

REPLACE EXISTING WATER FLOW SWITCH

WITH ZERO DELAY WATER FLOW SWITCH,

INSTALL AUTOMATIC AIR RELEASE VALVE/S

ELEVATOR MACHINE RM. 2241:

AS NECESSARY TO RELEASE TRAPPED AIR.

FIRE ALARM CONTRACTOR SHALL CONNECT

WATER FLOW SWITCH TO THE BUILDING'S

FIRE ALARM SYSTEM.

CUT IN NEW 2" CHECK VALVE AFTER EXISTING CONTROL VALVE.2

REPLACE EXISTING WATER FLOW SWITCH W/NEW POTTER3

EXISTING 2" CONTROL VALVE.1

DENOTES NEW F.P. PIPING

DENOTES EXISTING F.P. PIPING

REPLACE ELBOW TO PENDENT SPRINKLER HEAD WITH NEW TEE. 5

REPLACE SPRINKLER HEAD WITH NEW EQUAL INTO NEW TEE.

ON RISE OF TEE, INSTALL NEW 1/2" NIPPLE, ELBOW, NIPPLE,

VS-SP, NO RETARD TYPE WATER FLOW SWITCH.

A NEW 2"x2"x1" THREADED DUCTILE IRON TEE WILL BE REQUIRED

TO BE CUT IN TO ACCEPT THIS NEW WATER FLOW SWITCH.

BALL VALVE, NIPPLE AND NEW PAV AIR VENT ASSEMBLY PER

MANUFACTURER'S INSTRUCTION.

INSTALL PER MANUFACTURER'S INSTRUCTION.

EXISTING TEST/DRAIN ASSEMBLY.4

All work and material shall conform to NFPA #13, latest edition, and PBS P-100 requirements.

All materials, where applicable, shall be U.L. listed and/or Factory Mutual approved

All new piping shall be hydrostatically tested with water for two hours in Minimum test pressure shall be 200 PSI.

All pipe shall be supported from the concrete building structure utilizing hangers, materials and methods per NFPA #13, 2013 latest edition, and PBS P-100 requirements.

The Government Contracting Officer and/or the GSA FPE/AHJ shall be notified in advance

Side outlet rubber gasketed mechanical tee type fittings are not allowed.

A.

B.

C.

D.

E.

per contact requirements to witness the test.

The end of any new branch line shall have its hanger rod extended to the pipe, or have F.

a surge clip installed.

EXISTING TYPICAL SPRINKLER HEAD TO REMAIN.6

Statement of Intellectual Property

The ideas, concepts, drawings and thoughts conveyed herein are the intellectual property of PARTNERS in Architecture, PLC, 65 Market Street, Mount Clemens, MI, 48043 (P 586.469.3600). This set of drawings, in whole or in part, may not be reproduced, without the written consent of PARTNERS in Architecture, PLC.

This information is protected under U.S. Copyright Law, all rights reserved.

© Copyright 2016

65 MARKET STREET

MOUNT CLEMENS, MI 48043

P 586.469.3600

EX

IS

TI

NG

D

RA

IN

L

IN

E

6 6

7 6

8 8 8

INSTALL A NEW HYDRAULICALLY CALCULATED

WET PIPE SYSTEM COMPLETE WITH NEW

CONTROL VALVE WITH TAMPER SWITCH,

ELECTRICAL SWITCHGEAR RM. 2711:

DEVICE PIPED TO THE BUILDING'S EXPRESS

DRAIN, ALL NEW PIPE, FITTINGS, HANGER

ASSEMBLIES AND SPRINKLER HEADS

EQUIPPED WITH U.L LISTED HEAD GUARDS.

NO NEW PIPING OR SPRINKLER HEADS SHALL

POSITIONED ABOVE, OR…

This is the start of the file's text. The full file is on GovTribe.