SSAs_SmithGroup_Specs.pdf

PDF 317 KB Posted

Attached to
SSA 6th Floor Front-End Interview Construction, Space Reduction Federal contract opportunity
Solicitation number
GS-05-P-16-SC-C-7004
Issued by
General Services Administration Public Buildings Service Region 5

About this file

VOLUME 2 - GSA - SmithGroup Specs

View the file

Other files for this federal contract opportunity

Other files attached to SSA 6th Floor Front-End Interview Construction, Space Reduction, newest first.
File Type Posted
Panel_2.2.jpg JPG image
Panel_1.jpg JPG image
Panel_1.1.jpg JPG image
6th_floor_light_fixtures_and_occupancy_sensors_.pdf PDF
Panel_2.jpg JPG image
SSA_6th_Floor_RFI's.docx DOCX document
2012-10-15_09-55-55_5.jpg JPG image
Panel_2.1.jpg JPG image
SF_30_2.pdf PDF
SF_30.pdf PDF
Pre_Bid_Sign_in_sheet.pdf PDF
Preproposal_Meeting_Agenda_SSA_6th_Floor.pdf PDF
SOLICITATION_CLARIFICATION.pdf PDF
Volume_1_-_GS-05P-16-SC-C-7004.pdf PDF
Volume_3_-_GS-05P-16-SC-C-7004.pdf PDF
Volume_2_-_GSA_A-E_Specs.pdf PDF
GSA527-99a.pdf PDF
SF1442-14a.pdf PDF
Volume_2_-_GSA_A-E_DRWGs.pdf PDF
SF_24-98_Bid_Bond.pdf PDF
SSAs_SmithGroup_DWGs.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE PAGE 00001 - 1

00001.doc saved 8.28.2014 2:22 PM printed 8.28.2014 2:22 PM

SOCIAL SECURITY ADMINISTRATION SMITHGROUP

IWS/LAN NATIONAL INSTALLATION 28145.025

INDIANAPOLIS DOWNTOWN, IN

OFFICE CODE 455

PROPERTY OF THE UNITED STATES GOVERNMENT

UNAUTHORIZED COPYING, DISSEMINATION, OR

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

Social Security Administration IWS/LAN National Installation

PROJECT MANUAL

Field Office Name: INDIANAPOLIS DOWNTOWN, IN

Office Code Number: 455

Office Address: 575 N. Pennsylvania Street Indianapolis, IN 46204

Task Order Number: 13B4

SmithGroup, Inc.

ARCHITECTS - ENGINEERS - PLANNERS

500 GRISWOLD

SUITE 1700

DETROIT, MICHIGAN 48226

PROJECT NO.: 28145.025

SUBMITTAL: Construction Documents ISSUED: August 27, 2014

TABLE OF CONTENTS AND LIST OF DRAWINGS 00003 - 1

00003.doc saved 8.28.2014 2:22 PM printed 8.28.2014 2:22 PM

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SECTION 00003

TABLE OF CONTENTS AND LIST OF DRAWINGS

DOCUMENT/SECTION TITLE

00001 Title Page 00003 Table of Contents and List of Drawings

CONDITIONS OF THE CONTRACT

SPECIFICATIONS

Division 16 16010 Basic Electrical Requirements 16010 Appendix A – Pre-Travel Work Verification Form 16030 Testing 16080 Electrical Alterations 16110 Conduit, Wireways, and Accessories 16120 Wire, Cables, and Accessories 16140 Wiring Devices and Miscellaneous Equipment 16190 Supporting Devices 16195 Electrical Identification 16450 Grounding 16470 Surge Protective Devices 16710 Telecommunications Cabling 16720 Telecommunications Cable Testing

LIST OF DRAWINGS

ELECTRICAL

C1 Cover Sheet E1 Electrical Symbols, Schedules, Details, and General Notes E2 Existing Conditions Power Plan Zone 1 E3 Existing Conditions Power Plan Zone 2 E4 Existing Conditions Power Plan Zone 3 E5 Existing Conditions Communications Plan Zone 1 E6 Existing Conditions Communications Plan Zone 2 E7 Existing Conditions Communications Plan Zone 3 E8 New Work Power Plan Zone 1 E9 New Work Power Plan Zone 2 E10 New Work Power Plan Zone 3 E11 New Work Communications Plan Zone 1 E12 New Work Communications Plan Zone 2 E13 New Work Communications Plan Zone 3 E14 Panel Schedules E15 Riser Diagram, Schedules, and Details

END OF SECTION

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 1

16010.doc saved 8.28.2014 2:23 PM printed 8.28.2014 2:23 PM

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SECTION 16010 / 26 05 00

BASIC ELECTRICAL REQUIREMENTS

INDEX

PART 1 - GENERAL

1.02 REFERENCES

1.03 PRODUCT DATA

1.04 AS-BUILT DOCUMENTS

1.05 FINAL PAYMENT

1.06 QUALITY ASSURANCE

1.07 MAINTENANCE

PART 2 - PRODUCTS

2.01 MANUFACTURERS

2.02 PRODUCT OPTIONS

2.03 PRODUCT LISTING AND LABELING

PART 3 - EXECUTION

3.01 INSTALLATION

3.02 FIELD QUALITY CONTROL

PART 1 - GENERAL

1.1 GENERAL REQUIREMENTS

A. General

1. Nothing in this Section is intended to limit types and amounts of temporary Work required, and no omission from this Section will be recognized as an indication by the Contracting Officer that such temporary activity is not required for successful completion of the Work and compliance with requirements of Contract Documents.

B. Design Intent

1. The Contract documents indicate and specify the electrical design intent. The Contract drawings are schematic and diagrammatic and are not intended to indicate construction details and routing unless specifically indicated. The specifications establish minimum performance, and product and installation requirements.

2. In addition to the specified and indicated performance and quality requirements, furnish products and perform installation work consistent with the design intent and necessary to the provision of complete operating electrical and IWS/LAN systems.

3. No changes to the design intent will be permitted without prior written approval from SSA Headquarters in Baltimore, Maryland.

C. Definitions

1. "Provide" shall mean "furnish and install".

2. "Shown" and "indicated" shall mean appearing on the Drawings.

3. "Replace" shall mean to put new in place of.

4. "Per" shall mean "in accordance with the requirements of".

5. "SSA" shall mean "Social Security Administration".

D. Schedule of Work

1. Unless otherwise instructed, perform Work in and about the existing building during normal SSA business hours and, if needed, weekends.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 2

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

2. Perform work in a manner which will cause as little inconvenience to SSA and the building owner's occupancy and use of the facilities as practicable.

3. At the end of each workday return areas of the building in which alterations or new Work has been performed to the condition in which left by SSA and the building owner.

4. Within 14 calendar days after date of receipt of notice to proceed and prior to start of the Project, submit a complete construction schedule including alteration work, new work, submittal schedule, and field acceptance testing schedule.

E. Sequencing of Work

1. Perform the work without interruption to Owner's existing computer system and as indicated in the Project Description on the Drawings.

F. Fire Hazards

1. Take necessary actions to eliminate possible fire hazards and to prevent damage to construction Work, building materials, equipment, and other property.

2. No welding, flame cutting or other operations involving the use of flame, arcs or sparking devices will be allowed without adequate protection and concurrence of the Contracting Officer. Remove combustible and flammable material from the immediate working area or, if removal is impossible, protect such materials with suitable noncombustible shields to prevent sparks, flames or hot metal from reaching them.

G. Flammable Materials

1. Bring no more than one-half day's supply of flammable liquids such as oil, gasoline, paint and paint solvent into the building at any one time. Confine flammable liquids having a flash point of 43 degrees C (110 degrees F) or below, which must be brought into the building, in Underwriters-Laboratories-labeled safety cans. Store the bulk supply of flammables at least 22.9 meters (75 feet) from the building and other combustible materials. Spigots on drums containing flammable liquids are prohibited on the Project site. Equip drums with approved vented pumps.

2. Locate only one day's working supply of flammable building materials inside the building.

3. Remove oil-soaked rags, papers, and other combustible debris from the building at the close of each day's Work. Store materials and equipment stored in cardboard cartons, wood crates or other combustible containers in an orderly manner and accessibly located. Locate fire fighting equipment of approved types in the immediate vicinity of any materials or equipment stored in this type of crate or carton.

4. Do not pour gasoline, benzene and other combustible materials into sewers, manholes, or traps.

5. Flame-proof tarpaulins and other materials used for temporary enclosures, coverings and protection.

H. Temporary Construction

1. Provide temporary construction as required by the Contract Documents and further needed to perform the Work, and dispose of such facilities at completion of the Contract, unless otherwise specified or requested by written direction of the Contracting Officer.

I. Electrical Power and Light

1. The Owner will furnish at a designated source and pay for electrical power for the Work.

2. Provide labor, equipment and materials required to make connections to Owner's power source and to provide temporary electrical power and light at location of Work as needed.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 3

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

3. Provide temporary equipment and wiring for power, lighting and distribution requirements which complies with applicable provisions of governing laws, codes and ordinances.

4. Maintain temporary wiring and related equipment so as not to constitute a hazard to persons or property.

J. Heat and Ventilation

1. Provide cold weather protection and temporary heat and ventilation as required during construction to protect the Work from freezing and frost damage.

2. In areas where the Work is being conducted, maintain the temperature as specified for particular materials, but not less than 10 degrees C (50 degrees F). Do not allow temperature to reach a level that will cause damage to any portion of the Work, including materials stored in the building which may be subject to damage by low temperatures.

K. Ventilation

1. Provide adequate ventilation as required to maintain reasonable interior building air conditions and temperatures, to prevent accumulation of excess moisture, and to remove construction fumes.

L. Protection

1. Provide adequate and proper protection to the existing building and premises occupied by the Owner during the execution and completion of the Work in such manner that the Owner's operations may be carried on with a minimum of interference, interruption and inconvenience during the construction operations.

2. Repair any damage done to existing work caused by Work under the Contract.

3. Remove temporary protection and enclosures when no longer required or at the direction of the

Contracting Officer.

M. Temporary Enclosures

1. Isolate Owner's occupied areas from areas where demolition and alterations will be done, with temporary, dustproof and weatherproof enclosures as conditions may require and as directed by the Contracting Officer.

2. Protect openings made in existing roofs, floors, and other construction with coverings and barricades to prevent accidents. Provide coverings which are weatherproof if in the exterior of building.

3. Maintain temporary enclosures in place until they are no longer required or until completion of construction and then remove them from the job site. Repair any damage done to existing work caused by the construction and removal of temporary partitions, coverings and barricades.

N. Roof Protection and Repair

1. Provide temporary roof protection needed for the Work, including temporary walk-ways and other temporary supporting structures, for moving and setting equipment. Locate such protection to bear on building structural members and at no point on roof deck alone. Construct the protection to properly distribute and support applied loads.

2. While performing Work on the roof, make regular inspections with the Contracting Officer to note damage. Repair damage to the satisfaction of the Owner.

O. Glass Protection

1. Exercise precaution for the protection of glass. Replace glass broken, scratched, or otherwise damaged with the same material.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 4

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

1.02 REFERENCES

A. American National Standards Institute (ANSI)

1. C2 - National Electrical Safety Code.

B. National Electrical Contractors Association (NECA)

1. Standard of Installation.

C. National Fire Protection Association (NFPA)

1. 70 - National Electrical Code.

1.03 PRODUCT DATA

1. Contracting Officer will accept Product Data only from the Contractor.

2. Submit product data and other specified submittals for the entire project.

3. Submit information substantiating that the products comply with the specified regulatory, testing, code, and standards requirements; including independent testing agency requirements, such as Underwriters Laboratories Inc., and industry standards organization requirements, such as the National Electrical Manufacturers Association.

4. Schedule Product Data submittals for inter-related items at the same time. Allocate not less than two weeks, plus applicable mailing times, to each submittal for processing by the Contracting Officer.

B. Descriptions And Submittals

1. Clearly mark and identify model numbers, ratings, performance characteristics and other pertinent data on submittals. Bind together and clearly identify information pertaining to a specific product. Where printed materials describe more than one product or model, clearly identify which is to be furnished.

C. Product Data

1. Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.

2. Submit Product Data in the form of 6 copies of each submittal.

D. Title Block

1. Identify the cover sheets for Product Data with a title block containing the following:

a. Project title including field office name, address and office code number.

b. Date.

c. Contracting Officer's name and Project number, including Contract package identifier.

d. Engineer's name (SmithGroup) and Project number, including Contract package identifier.

e. Contractor's name and project number.

f. Name of manufacturer, supplier, subcontractor or other such organization furnishing the submittal.

E. Submittal

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 5

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

1. Transmit Product Data using submittal forms acceptable to the Contracting Officer.

2. For resubmittal, follow same general procedure as initial submittal.

F. Review

1. Submittals will be reviewed by Contracting Officer's appropriate personnel, each of whom will mark the stamp on each submittal "Approved" or "Disapproved", representing the results of his or her review and directing Contractor's next action with that submittal.

2. The Contract time will not be extended for the required resubmittal of Product Data nor delay by Contractor in submitting or resubmitting Product Data.

1.04 AS-BUILT DOCUMENTS

1. Maintain one copy of the following:

a. Drawings

b. Specifications

c. Addenda.

d. Approved Shop Drawings.

e. Change Orders and other Modifications.

f. Field test records.

2. Such documents shall be known as "As-Built Documents", and shall be marked by the Contractor to reflect an accurate and up-to-date record of actual construction of the Work as it progresses.

3. Label each As-Built Document, "As-Built Document", in highly visible printed letters.

4. Store the As-Built Documents in files or on racks as appropriate, and apart from documents used for construction.

5. Maintain the As-Built Documents in clean, dry, legible condition.

6. Do not use the As-Built Documents for construction purposes.

7. Make the As-Built Documents readily available for reference by the Contracting Officer and

Engineer.

8. Contractor is fully and totally responsible for the accuracy and completeness of the As-Built

Documents.

B. Recording

1. Record all instances where actual field construction differs from the Work as shown on the

Drawings, and identify origin of change.

2. Keep the As-Built Documents up-to-date concurrent with the progress of the Work. Updating shall be performed, with the concurrence of the Contracting Officer:

a. Prior to concealment of Work;

b. When directed by the Contracting officer; and

c. Not less than every two weeks.

C. As-Built Drawings

1. Make drawing changes on a set of blue-line prints.

2. Carefully draw information and letter notes of explanation on the As-built Drawings. If, in the

Contracting Officer's or Engineer's opinion, the as-built indications are not legible or are otherwise unsatisfactory for the purpose, make new As-Built Drawings to accomplish the desired result to the satisfaction of the Contracting Officer or Engineer.

3. In the case of a Change Memorandum issuance, replace the As-Built Drawings with the revised drawings incorporating the Contract Modifications.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 6

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

4. The following items are representative, but not all-inclusive, of the information which shall be recorded on the As-Built Drawings:

a. Power distribution system, including distribution equipment and each conduit and wire size installed.

b. Final layout and circuiting for power and IWS/LAN wiring devices, surface raceways and related equipment, including each conduit and wire size.

c. Changes in plan, sections, elevations and details, such as shifts in location of walls, doors, and windows.

d. Final location and arrangement of underground utilities and connections to existing utilities, including electric and data.

e. Supporting and mounting details.

D. Completion

1. Submit the As-Built Drawings to the SSA Office Manager prior to the site inspection and testing visit by the Engineer. Identify each drawing as "As-Built Drawing" or "Document" and a notation made on the drawing certifying its completeness.

E. Pre-Travel Work Verification Form

1. Complete Pre-Travel Work Verification Form in Appendix A and fax as directed on the form.

1.05 FINAL PAYMENT

1. Final payment will not be released to the Contractor until the As-Built Drawings have been verified by SSA's Electrical Engineer and the Work has been tested and inspected.

1.06 QUALITY ASSURANCE

A. Regulatory Requirements

1. Comply with the applicable requirements of ANSI C2 and NFPA 70 as minimum standards of products and installation work. Furnish products and perform installation work which exceed the standards of ANSI C2 and NFPA 70 when specified or indicated.

2. Comply with applicable requirements of city, county, and state laws, ordinances and regulations including modifications and supplements to ANSI C2 and NFPA 70.

3. Comply with the applicable requirements of U.S. Department of Labor, Occupational Safety and Health Administration Standards (OSHA).

1.07 MAINTENANCE

1. Retain portable and detachable portions of the installation such as tools, tool kits, instruction books, wiring diagrams, service manuals, operating handles and keys until the completion of work.

2. Furnish keys to the SSA Field Office Manager together with any duplicates which may have been made. Securely wire keys for each lock together and plainly tag and mark the keys to indicate the lock number or piece of equipment they operate. Also indicate the physical location of the lock by building name or number, panel number, or room name or number.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 7

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

3. Provide wiring diagrams, instruction books, installation books, and service manuals to the SSA Field Office Manager. Clearly identify each item as to which product it applies and the equipment location.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

1. Provide products, for which quantities of two or more are to be furnished, from the same manufacturer and of the same product or model series.

2. Provide product components designed to be used together and which are physically and electrically compatible. Where component products are added to existing assemblies, provide products which electrically match existing (e.g.: provide circuit breakers added to existing panelboards with voltage, AIC rating, and mounting style matching existing).

3. Provide products which do not contain any amounts of polychlorinated biphenyl (PCB) compounds.

4. Provide products which do not contain any amounts of asbestos.

2.02 PRODUCT OPTIONS

A. Products are generally specified by reference standard (reference to a standard specification, method of testing, trade association standard, or other similar standard) and/or by manufacturer's name and product model number or trade name.

1. When specification is by reference standard only, the Contractor may select any product by any manufacturer meeting the standard.

2. When only one manufacturer's product is specified, such is the basis of the Contract without substitution or exception.

3. When two or more manufacturers' products are specified, they shall be considered as being equally acceptable, and the Contractor has the option of using any product named. No substitutions will be allowed.

2.03 PRODUCT LISTING AND LABELING

A. Provide listed and labeled product for which listings and labelings exist by Underwriters Laboratories Inc.

(UL), Factory Mutual (FM), or similar independent testing organizations recognized by the authorities having jurisdiction. For products for which there are no such listings and labelings, provide listed and labeled components of those products, for which component listing and labelings exist.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Wiring Installation

1. Install wiring for power feeders and branch circuits and communications systems in separate raceways unless otherwise indicated.

B. NECA Compliance

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 8

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

1. Install products in accordance with NECA's Standard of Installation unless otherwise specified or indicated.

C. Wet, Damp, or Dry Location Work

1. Provide products as appropriate for wet, damp, or dry locations as defined by NFPA 70.

D. Manufacturer Installation Instructions

1. Install equipment in accordance with the manufacturer's installation instructions and recommendations.

E. Fire and Smoke Barrier Penetrations

1. Drill wall and floor openings for penetrations as needed.

2. Install raceways and electrical equipment, which penetrate fire-rated or smoke barrier surfaces, in a manner which maintains the surface rating or barrier intent.

F. Field Painting

1. In a manner satisfactory to the Contracting Officer, touch-up or refinish factory-applied paints or finishes which are chipped, defaced, scratched, or in any other way disturbed due to handling, installation, or general construction work.

3.02 FIELD QUALITY CONTROL

A. Field Tests

1. Permit Engineer and Contracting Officer to observe field tests. Provide minimum three working days notice of field test.

2. Schedule tests in coordination with Contracting Officer's requirements.

BASIC ELECTRICAL REQUIREMENTS 16010 / 26 05 00 - 9

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

APPENDIX A - PRE-TRAVEL WORK VERIFICATION FORM

The following MUST accompany this form in electronic format only: CAT 6 Test results (Microsoft Excel or Word format) for all data drops.

The following MUST accompany this form in electronic or hard copy format: cut-sheets for the Patch Panel, Cable and Connector.

Office Name: __________________________ Date:_______________

Office Code No.: ______________________

Region: _______________________________

LAN Code: _____________________________

Form Prepared by:______________________

Phone No.:_____________________________

Cell Phone: ___________________________

Names of SSA office personnel assigned to assist with testing:_______________________________

Phone No. (During business hours): ____________________After business hours:_______________________

GSA REPRESENTATIVE

Contact Person:____________________

Phone No.:_________________________ Cell Phone No.:____________________

ELECTRICAL CONTRACTOR

Company Name:_______________________ Contact Person:_____________________

Phone No.:__________________________ Cell Phone No.:_____________________

Are the "As-Built" drawings, prepared by contractor, in the possession of the SSA Office Manager:

Yes/No (circle one) Note: This form should not be sent unless the manager has the drawing to hand over to SMITHGROUP upon arrival.

Name of electrician available to meet with SmithGroup during certification:

Circle latest Change Memorandum number received: None/ CM#1/ CM#2/ CM#3/ CM#4.

COMMUNICATIONS CONTRACTOR: (or same as Electrical):

Contact Person:_____________________

Phone No.:__________________________

Cell Phone No.:_____________________

Is a complete summary test report and all cut-sheets attached with this Pre-travel form? Yes/No (circle one)

Name of communications contractor available to meet with SmithGroup during certification:

Other comments:

PLEASE HAVE THE CONTRACTOR PERFORMING THE WORK COMPLETE THIS FORM, FAX THE COMPLETED FORM, E-MIAL THE TEST RESULTS AND FAX THE CUT-SHEETS TO CASSANDRA ARROYO AT 410-966-1759 or CASSANDRA.ARROYO@SSA.GOV. VISITS WILL BE SCHEDULED ONCE ORM RECEIVES THIS FORM, CAT 6 TEST RESULTS, AND CUT SHEETS. SMITHGROUP MAY FOLLOW UP WITH QUESTIONS. SMITHGROUP/Office of Realty Management, REVISION – 8/12/10.

TESTING 16030 / 26 01 00 - 1

16030.doc

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SECTION 16030 / 26 01 00

TESTING

INDEX

PART 1 - GENERAL

1.01 SUMMARY

1.02 REFERENCES

1.03 DEFINITIONS

1.04 QUALITY ASSURANCE

1.05 EXAMINATION

1.06 SUBMITTALS

1.07 PROJECT CONDITIONS

1.08 SEQUENCING AND SCHEDULING

PART 2 - NOT USED

PART 3 - EXECUTION

3.01 ACCEPTANCE TESTING METHODS

3.02 EQUIPMENT TO BE TESTED

3.03 EQUIPMENT TESTING TO BE WITNESSED BY SSA’S ELECTRICAL ENGINEER

3.04 SITE INSPECTION AND TESTING CHECKLIST

1.01 SUMMARY

A. Section Includes

1. Provide material, equipment, labor and technical supervision to perform and complete the electrical field acceptance tests for the electrical equipment and distribution systems specified.

2. Refer to Section 16720 / 27 15 00 for testing requirement of telecommunications cabling.

A. InterNational Electrical Testing Association (NETA)

1. ATS - Acceptance Testing Specifications

1.03 DEFINITIONS

A. Acceptance Tests

1. Defined as those tests and inspections required to determine that the equipment involved may be energized for operational tests.

1.04 QUALITY ASSURANCE

A. Testing Laboratory Qualifications

TESTING 16030 / 26 01 00 - 2

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

1. Independent testing company regularly engaged in the business of electrical acceptance testing, similar to the inspections and tests specified, with a minimum of two years experience.

2. Testing under this Section may be performed by the installing Contractor, provided qualifications as specified are met.

3. Provide at least one on-site test leader who is a certified NETA (InterNational Electrical Testing Association) or NICET (National Institute for Certification in Engineering Technologies) test technician. Provide other test personnel who have had a minimum two years of supervised field experience in acceptance testing.

B. Industry Standards

1. Perform tests per the standards of the industry such as IEEE (Institute of Electrical and Electronics Engineers, Inc.), NEMA (National Electrical Manufacturers Association), ANSI (American National Standards Institute), NETA (InterNational Electrical Testing Association), and ICEA (Insulated Cable Engineers Association), and as specified.

1.05 EXAMINATION

A. Verification of Conditions

1. Review Project electrical documents and ascertain the extent of the Project testing and the conditions and parameters involved in the Work.

2. Prior to testing, visually inspect equipment to determine that there is no physical damage, loose bolts or missing parts and the equipment is supplied in agreement with the Contract Documents and properly installed and connected.

3. Report immediately to the Contracting Officer any system, material, or workmanship which is found defective or not in compliance with the Specifications.

1.06 SUBMITTALS

A. Test Report Submittals

1. Incorporate a record of inspections and tests into a test report.

2. Bind and certify the test report.

3. Furnish two copies of the complete report to the Contracting Officer no later than fourteen days after completion of Project.

4. Include in the test report the following:

a. Project name, including field office address and code number.

b. Equipment tested.

c. Tests performed.

d. List of test equipment used and calibration dates.

e. Test results.

e. Conclusions and recommendations, if any.

5. Where adjustments, modifications, or repairs are made to equipment in order to meet the equipment and/or system specifications, indicate the "as left" condition in the test report.

6. Report test results for each separate piece of equipment on test forms designed for the purpose. Include on the test forms the following:

a. Nameplate catalog number, serial number, and rating.

TESTING 16030 / 26 01 00 - 3

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

b. Desired performance or performance range.

c. Measured performance.

1.07 PROJECT CONDITIONS

A. Environmental Requirements

1. Correct test results to 20 degrees C. (68 degrees F). Report both the actual ambient temperature test readings and the calculated, corrected to temperature, test values.

2. Do not test any equipment when the insulation temperature is below 0 degrees C (32 degrees F).

3. Do not test any equipment where the relative humidity is above 70 percent. Deviations to this requirement will only be approved by the Contracting Officer if the testing laboratory can demonstrate that the higher humidity will not affect the test or that the higher humidity can be accounted for adequately in interpreting the test results.

1.08 SEQUENCING AND SCHEDULING

1. Schedule tests in cooperation with other affected Contract work. Obtain approval from the Contracting Officer for the testing schedule. Give three days notice prior to testing, unless otherwise necessary or specified.

PART 2 - NOT USED

3.01 ACCEPTANCE TESTING METHODS

1. Provide necessary test equipment and be responsible for setting-up test equipment, wire checks of factory wiring and any other preliminary work in preparation for the electrical acceptance tests.

2. Maintain applicable test instrumentation within rated accuracy.

3. Perform tests which do not exceed the manufacturer's recommended limit for the equipment being tested.

4. Where required for the validity of tests or safety of equipment and personnel, isolate equipment to be tested from the system.

B. Insulation Resistance Test

1. Perform test with a voltage source capable of providing a constant direct voltage for the time intervals as specified below.

2. The magnitude of applied direct voltage depends upon the voltage system to which the equipment is connected, as follows:

System Voltage Test Voltage 150 and under 500 151 - 600 1000

TESTING 16030 / 26 01 00 - 4

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

3. Hold 1000 volt and 500 volt insulation resistance tests for a minimum of one minute or until the reading reaches a constant value for 15 seconds unless specified otherwise.

4. Apply tests from phase to ground with the other phases grounded. Test each phase in a similar manner.

5. Check phase matching and phase identification immediately prior to energizing equipment.

3.02 EQUIPMENT TO BE TESTED

1. Provide field acceptance tests for the following equipment:

a. Busway

b. Grounding Systems

c. Panelboards

d. Transformers

e. Power Wire and Power Cable under 600 volts (feeders)

f. Power Wire and Power Cable under 600 volts (branch circuits)

3.03 EQUIPMENT TESTING TO BE WITNESSED BY SSA’s ELECTRICAL ENGINEER

1. Perform the following tests in the presence of SSA’s electrical engineer (Regional

Engineer or SIT Engineer). Provide needed equipment and on-site supervision throughout the tests and correct deficiencies as directed by the Contracting Officer.

2. Perform tests properly dressed for arc flash protection consistent with NFPA 70E and OSHA regulations.

B. Power Wiring Test

1. Isolated ground panelboard inspection.

a. See below for required procedure.

2. Normal panelboard inspection.

3. Transformer inspection (if applicable).

4. Branch Circuit and Receptacle Inspection and Testing.

5. IWS/LAN connector and Cable Inspection.

C. Isolated Ground Verification

1. Test Equipment: Fluke 87 Multimeter or similar.

2. Procedure

a. Step 1: Coordinate with office manager for the best time to perform this test (early morning, lunch, etc.).

b. Step 2: Verify that no plugstrips, copier machines, extraneous power supplies, or other unauthorized devices are plugged into isolated ground receptacles.

c. Step 3: Set Fluke meter to Ohmic scale.

d. Step 4: Instruct the contractor to remove the separately derived ground conductor (i.e. incoming isolated ground conductor) from the IG panel isolated bus.

TESTING 16030 / 26 01 00 - 5

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

e. Step 5: Connect the Fluke red probe to the isolated ground bus and the black probe to the equipment ground bus. The reading should be infinity or "OL" (overload).

f. Step 6: With the separately derived ground conductor still disconnected proceed to the furniture system and check each wall outlet and each furniture circuit zone between the IG outlet ground prong and equipment ground (equipment ground may be at a standard duplex prong or direct contact to exposed metal parts of the furniture system). The reading should be infinity or "OL" (overload).

g. Step 7: If Step 5 passes and Step 6 results in an ohmic reading; the short is probably the result of an improperly connected isolated ground conductor at the furniture system wiring harness connection.

3. Troubleshooting

a. If step 5 results in an Ohmic reading, the test has failed. Conduct the following trouble shooting procedure with the separately derived ground still disconnected.

b. Step 1: Instruct the contractor to remove one IG branch conductor at a time from the IG panelboard with the ohmmeter connected between IG bus and EG bus.

(Note: Do not reconnect conductors to bus until all the failed conductors and/or bus have been identified.)

c. Step 2: Continue to remove conductors until meter reads infinity or overload.

1) If after all isolated ground conductors have been removed, the meter does not read infinity or overload then the IG bus is shorted to the panel.

d. Step 3: Instruct the contractor to mark and test the isolated grounding conductor(s) which have been removed from the IG bus until all shorts are found and isolated.

e. Step 4: Instruct the contractor to correct the shorted isolated ground conductor.

Retest by connecting ohmmeter between the conductor and the equipment ground bus. Reading should be infinity or "OL" (overload).

D. Data Cable Test

1. Refer to Section 16720 for testing requirements.

3.04 SITE INSPECTION AND TESTING CHECKLIST

A. The checklists included in the attached appendix will be used by SSA's electrical engineer for site inspection and testing.

TESTING 16030 / 26 01 00 - 6

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

APPENDIX A

SITE INSPECTION AND TESTING CHECKLIST

SITE NAME: ______________ OFFICE CODE NO.: _______

Questions that are applicable to this site must be answered 'yes' or 'no.' All 'no' answers should be qualified by a comment in the space provided below.

A. ISOLATED GROUND PANELBOARD INSPECTION YES NO

GENERAL

1. Do panelboard short circuit rating, amperage, voltage, phasing and number of poles comply with the construction documents and specifications?

2. Is panelboard mounted plumb and rigid?

3. Are circuit breakers bolt-on type per specification?

4. Are all circuit breakers securely fastened?

5. Are all circuit breakers sized per panel schedule on construction documents?

6. Does the panelboard have the same number of spare circuit breakers and spaces as shown on panelboard schedule?

7. Are all circuit breakers numerically labeled?

8. Is panelboard provided with nameplate per construction documents?

9 Is panelboard equipped with properly documented circuit directory?

10. Is panelboard properly grounded per construction documents and specification?

GROUNDING

11. Did the IG panel pass the isolated ground test for a “clean” ground for all circuits?

CONDUCTORS

12. Are there individual phase, neutral and isolated ground branch circuit conductors for each circuit?

13. Are phase, neutral and isolated ground conductors labeled with circuit numbers?

14. Are all feeders sized per construction documents?

15. Are all feeders and branch circuit conductors copper per specification?

16. Are the feeders and branch circuits properly color coded per specification?

17. Has a common branch circuit equipment ground been installed with each homerun?

TVSS

18. Is a TVSS unit as specified, installed as close as possible to IG panelboard?

19. Is the unit rated for 200 kA per phase/100 kA per mode?

20. Does the unit have an audible alarm with silencing switch?

21. Does the unit have surge-event operations counter?

22. Does the unit have a set of dry contacts for remote monitoring?

23. Is a 30amp, minimum, breaker provided in the IG panelboard for service to the TVSS unit?

COMMENTS

TESTING 16030 / 26 01 00 - 7

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SITE NAME: ______________ OFFICE CODE NO.: _______

Questions that are applicable to this site must be answered 'yes' or 'no.' All 'no' answers should be qualified by a comment in the space provided below.

B. NORMAL PANELBOARD INSPECTION YES NO

GENERAL

1. If applicable, does new panelboard rating, voltage, phasing and number of poles comply with the construction documents and specification?

2. Is panelboard mounted plumb and rigid?

3. Are circuit breakers bolt-on type per specification?

4. Are all circuit breakers securely fastened?

5. Are all circuit breakers sized per panel schedule on construction documents?

6. Are 20-amp, 2-pole breakers or 20-amp single-pole breakers with approved handle ties provided for each pair of circuits feeding systems furniture?

7. Does the panelboard have the same number of spare circuit breakers and spaces as shown on panelboard schedule?

8. Are all circuit breakers numerically labelled?

9. Is panelboard provided with nameplate per construction documents?

10. Is panelboard equipped with properly documented circuit directory?

11. Is panelboard properly grounded per construction documents and specification?

BUS BARS

12. Is the panelboard equipped with an equipment ground bus bar per construction documents?

>Is bus bar securely mounted to housing?

CONDUCTORS

13. Are the workstation no. 1 and no. 2 receptacles on different circuits?

14. Are two general purpose circuits provided to each workstation power feed?

15. Are all feeders sized per construction documents?

16. Are the feeders and branch circuit conductors copper per specification?

17. Are all feeders and branch circuits properly color coded per specification?

18 Has a common branch circuit equipment ground been installed with each homerun?

COMMENTS________________________________________________________________________

TESTING 16030 / 26 01 00 - 8

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

SITE NAME: ______________ OFFICE CODE NO.: _______

Questions that are applicable to this site must be answered 'yes' or 'no.' All 'no' answers should be qualified by a comment in the space provided below.

C. TRANSFORMER INSPECTION (IF APPLICABLE) YES NO

1. Does new transformer rating, phasing and type comply with construction documents and specification?

2. Is transformer mounted so as to provide adequate space for air circulation?

3. Is transformer grounded per construction documents and specifications?

4. Are transformer neutral and ground terminals bonded together for each existing and new transformer? (Verify this by measuring the phase-to-phase and neutral-to-ground voltages for each transformer at a downstream panel.

D. CIRCUIT/RECEPTACLE INSPECTION AND TESTING

1. Does new and existing circuiting comply with the contractor-provided 'as-built'.

2. Are isolated ground receptacles wired per schematic shown on detail sheet?

3. Are isolated ground receptacles (including systems furniture) identified with typed labels indicating circuit number?

4. If applicable, are wiring jumpers installed for convenience receptacles in modular furniture?

5. Do the ratings of new isolated ground and convenience receptacles comply with specification?

6. If applicable, are base feeds properly located and secured per drawings?

7. If applicable, are overhead junction boxes labeled with panel and circuit number?

8. After testing all isolated ground receptacles, have all problems been resolved by contractor?

TESTING 16030 / 26 01 00 - 9

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

SITE NAME: ______________ OFFICE CODE NO.: _______

Questions that are applicable to this site must be answered 'yes' or 'no.' All 'no' answers should be qualified by a comment in the space provided below.

E. IWS/LAN CONNECTOR AND CABLE INSPECTION YES NO

1. Have all cables and jacks been tested by the Contractor to confirm Category 6 performance?

2. Have a representative number of cables been tested during the SIT to confirm Cat 6 performance?

3. Have all cable/jack problems been resolved by contractor?

4. Are all cable and jack types as specified? (plenum or non-plenum) – circle the applicable.

5. Are all jacks wired per T568A or T568B configuration?

6. Is there specified cable slack at each jack, and in the cable tray in the Data

Communication Room (DCR)?

7. Are all cables labeled per drawings and specifications?

8. Has cable tray been provided and securely fastened in place?

9. Is grounding conductor provided and installed per specification with appropriate lug to serve LAN equipment?

10. Has the modular patch panel and LAN equipment rack been provided?

11. Have all LAN equipment racks as specified been provided?

12. If applicable, is LAN rack label available for IWS/LAN installer?

TESTING 16030 / 26 01 00 - 10

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SITE NAME: ______________ OFFICE CODE NO.: _______

Questions that are applicable to this site must be answered 'yes' or 'no.' All 'no' answers should be qualified by a comment in the space provided below.

F. MODULAR FURNITURE ITEMS (if applicable) Yes NO

1. Have all power poles, furniture breaks and furniture receptacles been provided and installed by modular furniture contractor?

G. OTHER ISSUES

1. Is the work SUBSTANTIALLY COMPLETE given the deficiencies herein listed?

2. Has the Contractor provided accurate As-builts?

3. Has the Contractor provided a Cat 6 cable test report on CD compatible with Microsoft Excel?

ELECTRICAL ALTERATIONS 16080 / 26 05 79 - 1

16080.doc

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

SECTION 16080 / 26 05 79

ELECTRICAL ALTERATIONS

INDEX

PART 1 - GENERAL

1.01 SUMMARY

1.02 DEFINITIONS

1.03 SUBMITTALS

1.04 SEQUENCING AND SCHEDULING

PART 2 - NOT USED

PART 3 - EXECUTION

3.01 GENERAL

3.02 PATCHING

3.03 CUTTING

3.04 CONNECTIONS TO EXISTING WORK

3.05 CLEANING

1. The work required consists of furnishing labor, materials, equipment and services necessary for removal of materials and equipment as indicated and specified and classification thereof as defined. It also consists of work necessary for protection of existing building, maintaining SSA's and the building owner's operations and accomplishing new work.

1.02 DEFINITIONS

A. "Abandon"

1. Disconnect item from existing system connections. Plug or cap openings in item and former connections to system. Leave item in place.

B. "Remove"

1. Disconnect item from existing system. Permanently plug or cap openings of system and extract the item from its position. Dispose of supports, debris, and other items left behind. Leave existing system to remain, in first class condition. Dispose of the item as directed in compliance with the specified Classifications.

2. After materials and equipment are removed, inspect the structure to remain in place and notify the Contracting Officer of defects uncovered. Repair of such defects and other additional work required by the Contracting Officer will be compensated by Contract adjustment in accordance with the conditions of the Contract.

C. "Relocate"

ELECTRICAL ALTERATIONS 16080 / 26 05 79 - 2

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

1. This term may be applied to any material or equipment removed under this alteration operation, including incidental parts, pieces or attachments, which meets the requirements of the applicable Section of the Specifications, subject to the approval of the Contracting Officer. Carefully remove, thoroughly clean, and finished as specified in the applicable Section of the Specifications, then install as specified for new material.

2. When procedure of the Work prevents the immediate reinstallation of items specified or indicated as "relocate"; protect, transport and store such items until such time as reinstallation is possible. When ready for the reinstallation, remove the items from storage and reinstall in new locations.

3. In lieu of relocating an existing item, the Contractor may provide a new item, subject to the Contracting Officer's approval, and classify the item to be relocated as trash.

D. "Salvage"

1. Useful material or equipment which will not be reused as part of the Project. Dismantle material and equipment to useful sizes, shapes or components and deliver to the Contracting Officer on the site, set up or packaged for storage as directed by the Contracting Officer or as specified. Place on wood skids for ease of handling. Removal of paint, degreasing or cleaning, except that required for normal handling, is not required.

Material and equipment salvaged from the operation remains the property of the Owner.

E. "Trash"

1. Unusable or unsalvageable material such as broken or worn out equipment, fixtures or devices, old conduit, wire, and cable. Remove from the premises as the work progresses, and legally dispose of trash off the site.

1.03 SUBMITTALS

A. Schedule and Method

1. Before the start of the Project, present an alteration schedule indicating the timing and method proposed to maintain service during the construction period for review and approval by the Contracting Officer.

1.04 SEQUENCING AND SCHEDULING

A. Interruption to SSA's and Building Owner's Activities

1. Interference with SSA's and the building owner's activities is not permitted. Accomplish scheduling of removals, abandonment, relocation and alteration of existing facilities with the approval of the Contracting Officer before beginning any phase of the work.

2. Maintain existing electrical and communications systems and other facilities in operation.

When temporary disruption of such services is found to be necessary during the course of alteration work, such disruption is allowed only by permission of, and at such time as may be designated by the Contracting Officer

PART 2 - NOT USED

ELECTRICAL ALTERATIONS 16080 / 26 05 79 - 3

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed

3.01 GENERAL

A. Prior to beginning Work, survey existing construction, including structure, finish and equipment, adjacent to Work to be removed. Submit a written report of defects found in such work to the Contracting Officer.

B. Prior to cutting existing construction, investigate the presence of active utilities, including electrical conduits, telecommunication lines, and piping, which may be damaged by such cutting.

3.02 PATCHING

A. Where finish materials are removed for replacement by new materials, prepare the substrate as needed to receive the new finish materials.

B. Where openings in existing walls or partitions are to be closed, including openings left by removal of telepower poles, close the openings with new materials to match existing materials, including wall finish where exposed. Patch such openings which occur in fire rated partitions to maintain the fire resistance rating.

C. Where items which penetrate existing ceilings are removed, such as telepower poles, close the openings with new materials to match existing materials, including suspension system.

D. Replace fireproofing material which has been removed from structural steel members with approved material to maintain the existing fire resistance rating.

3.03 CUTTING

A. Cut and patch existing construction as needed for demolition and alteration work.

B. Cut the work using methods that are least likely to damage work to be retained or adjoining work.

Where possible, review proposed procedures with the original installer; comply with original installer's recommendations.

C. Where cutting is required, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut through concrete and masonry using a cutting machine such as a Carborundum saw or core drill to insure a neat hole.

D. Cut holes and slots neatly to minimum size required with minimum disturbance of adjacent work.

To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces. Cover openings when not in use.

E. By-pass utility services such as pipe and conduit, before cutting, where such utility services are shown or required to be removed, relocated or abandoned. Cut-off conduit and pipe in walls or

ELECTRICAL ALTERATIONS 16080 / 26 05 79 - 4

DISTRIBUTION OF THESE DOCUMENTS IS PROHIBITED

Do not remove this notice

Properly destroy documents when no longer needed partitions to be removed. After by-pass and cutting, cap, valve or plug and seal tight remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.

F. Remove abandoned electrical services and equipment where such items are in existing construction to be removed.

G. Support, temporarily, electrical services and equipment, which are attached to walls or other structures to be removed, and which are to remain in service. Remove temporary supports when permanent support is in place and so directed.

3.04 CONNECTIONS TO EXISTING WORK

A. Make proper and approved connections of new Work to existing construction and all necessary adjustments of either or both as required to produce a complete and workmanlike job.