RFI_6.30.2016.pdf
PDF 20 KB Posted
- Attached to
- Child Care Center Renovation Federal contract opportunity
- Solicitation number
- GS-05-P-16-GC-C-7002
About this file
Updated RFI's and answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GENERAL_NOTE.pdf | ||
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| Sign_in_Sheet.pdf | ||
| RFP_CCC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GREAT LAKES REGION
Acquisition Management Division
Chicagoland Construction Contracting Team 230 S. Dearborn Street, Suite 3600
Chicago, IL 60604
Addressing Recent RFI’s
Solicitation No. GS-05-P-16-GC-C-7002 Renovation of Child Care Center
536 S. Clark Street Chicago, Illinois
Q1. Can you please tell me the manufacturers of the existing:
1. Fire Alarm System
Honeywell
2. Security System
There is no building wide security system and the childcare system will be self contained.
Q.2 Will the Heating Water System be drained previous to this project beginning?
Drawings indicate that valves are to be installed in the ¾” lines – do valves currently exist?
If not, should we include freezing the pipes to the baseboard heating unit that is being removed?
The system can be drained prior to work on it. The valves do not exist.
Q3. Who does the fire alarm system in the building? Info needed since new devices are to be added.
Honeywell
Q.4. For the security cabling and devices – Can our electrician do that work or do we need to use a specific GSA vendor?
Electrician is allowed.
File details come from the government source that posted it. Updated .