KEATING FEDERAL BUILDING PRISONER ELEVATOR & HOLDING CELLS RNY-00195
KENNETH B. KEATING FEDERAL BUILDING & COURTHOUSE PBS REGION 2
SECURITY REGULATIONS
015410-1
SECTION 015410 - SECURITY REGULATIONS
PART 1 – GENERAL
1.1 SECURITY REQUIREMENTS
A. LOG BOOK
All contract workers shall sign in and out in the Contractor’s Log Book, on a daily basis. The Contractor’s Log Book shall be located on the project site and maintained by the Project Superintendent. This log book is and shall remain the property of the GSA. The log book shall be turned in to the GSA PM or Building Manager upon completion. This is an item that GSA will inspect and shall be made available to GSA upon request.
Note: For purposes of this section, "contract workers" means employees of both the prime contractor and any subcontractors, who will be working on the Government site in performance of the contract.
B. SUITABILITY CLEARANCE REQUIREMENTS (Non-classified contract(s))
The following sections below apply to temporary, long-term and short-term contract workers.
1. "Temporary Contractors" are contractors who will be on the job site for 10 days or less during the course of the contract. Temporary contractors will not need to complete a security clearance to perform work on the contract. Temporary Contractors shall be escorted at all times while in non-public space and under the positive control and supervision of a Government Employee or Contractor with an active PIV card. Contractor employees will not be labeled as "temporary" in order to avoid having the contractor obtain the appropriate security clearance required for the work they will perform on the contract.
2. A "Short Term Contractor" will be on the project 6 months or less and will apply for a SAC check. The contractor will submit the CIW, will complete the fingerprint and photograph (enrollment) requirement, and submit the OF-306 form to OMA to upload to the OPM Portal. Once the contract employee has completed the clearance process and all documents (CIW, Fingerprinted, Photographed, OF-306) have been accepted by OPM, the contract employee may access the facility as a visitor, and must comply with normal facility access control procedures, including sign-in, temporary badging, etc. The contract employee will be escorted in non-public areas of the facility. Once the Special Agency Check (SAC) letter is received, the contractor will no longer require an escort.
3. A “Long Term Contractor" is hired to work for longer than 6 months. All contract employees requiring routine access to Federally controlled facilities for more than 6 months or any access to Government information systems ( Long term contract employees) shall undergo a suitability determination before a PIV identification card is issued. The contractor will complete the EQIP process submitting the CIW, enrollment, completing the EQIP questionnaire and receiving an Enter on Duty determination prior to being allowed to work on the project. Once the contract employee receives his Enter on Duty determination, he can access the facility as a visitor until his PIV card has been obtained. Once the Enter on Duty letter is received, the contract employee shall obtain their PIV card from the MSO credentialing access station and enter the facility as a government employee.
4. Failure of a long term contract employee to receive a favorable suitability determination shall result in their immediate removal from the contract and they shall not be allowed to work on any GSA contract.
5. The Contracting Officer or his/her designated representative shall provide the Contractor with required forms for obtaining necessary clearances. The Contractor shall be required to cause such completed forms to be returned to the Government for processing no later than fifteen (15) days following those initial forms and instructions being provided by the Government.
015410-2
6. The Contracting Officer or his/her designated representative shall ensure that the CIW completed for each applicant correctly reflects whether that applicant is a Short or Long- Term contractor by ensuring that the appropriate Type of Investigation Required selection is reflected in Block 4 of the CIW prior to submitting to OMA for security clearance initiation.
7. The Contractor shall be responsible for planning and scheduling work in such a manner as to account for security clearance and facility access requirements.. The Contractor shall also be responsible to assure that employees and subcontractors hired to work on the contract complete all security clearance requirements in a timely and proactive manner. Difficulties encountered by the Contractor in assuring that an adequate number of employees and subcontractors have completed the security clearance requirements shall not be an excuse to the Contractor's ability to perform work under the Contract.
8. Escorts are defined as employees and contractors who have received a favorable initial suitability decision and possess valid identification credentials (either a current PIV card or temporary badge and I-9 document).Escorts must maintain positive control (eye sight) of anyone under their supervision. Failure to comply will result in removal of individuals from the work site.
1.2 HSPD-12 SECURITY AND CREDENTIALING REQUIREMENTS
A. PART 1 - SECURITY REQUIREMENTS AND PERSONAL IDENTITY
VERIFICATION AND CREDENTIALING PROCEDURES FOR CONTRACTORS
(NON-CLASSIFIED CONTRACT(S))
1. The General Services Administration (GSA) reserves the right to verify the identities of
Contractor personnel with routine, unaccompanied access to GSA facilities or Information Technology (IT) systems and networks, to make contract employment suitability determinations based on background investigations, and control access to GSA facilities and IT systems and networks based on the suitability determinations. The term ‘Contractor’ refers to the General/Prime Contractor Company or lessor on a GSA contract and any related Subcontractor(s) company and Vendor(s). The term ‘Contractor Personnel’ refers to any Contractor personnel supporting GSA contracts. The Contractor and their Contractor Personnel shall comply with the GSA Personal Identity Verification (PIV) procedures outlined below, that implement Homeland Security Presidential Directive- 12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and the Federal Information Processing Standards Publication (FIPS PUB) Number 201, as amended. HSPD-12 requires Federal agencies to issue standardized PIV credentials to Federal employees and contractors and use the credentials for access to Federal facilities and IT networks and systems. GSA branded the PIV card that GSA issues to its personnel as the GSA Access Card. The GSA Access Card enables routine, unescorted access to GSA facilities and IT systems and networks.
2. In accordance with FAR 52.204-9 (Personal Identity Verification of Contractor Personnel
(Jan 2011). the Contractor shall account for all GSA credentials issued to Contractor Personnel in connection with the performance under this contract. The Contractor Personnel shall immediately return credentials issued by GSA under any of the following conditions, as stipulated in FAR 52204-9:
All Contractor Personnel who will perform work on a GSA contract and will require routine access to GSA facilities or IT systems and networks may be required to obtain a GSA Access Card. The GSA Contracting Officer or their Designated Representative and/or the Security Officer will define routine access. Contractors must receive a favorable result on their Federal Bureau of Investigation (FBI) Fingerprint Check and GSA must have initiated a minimum of a National Agency Check with Written Inquiries (NACI) before GSA can issue an Access Card to them. GSA will revoke the Access Card for a Contractor who receives an unfavorable final suitability determination based on the NACI or higher background
015410-3 investigation. GSA may also remove the Contractor from the GSA contract and restrict access to GSA facilities and IT systems and networks if the Contractor receives an unfavorable final suitability determination.
A. GSA has full and complete control over granting, denying, withholding or terminating suitability determinations for Contractor Personnel supporting GSA contracts. GSA may authorize and grant temporary suitability to Contractor Personnel. A temporary or preliminary suitability determination by GSA does not guarantee that GSA will grant a favorable final suitability determination. A favorable temporary, preliminary or final suitability determination by GSA shall not prevent, preclude, or bar GSA from withdrawing or terminating a suitability determination.
B. HSPD-12 establishes the minimum background requirements for GSA to issue an
Access Card. GSA may require Contractor Personnel to obtain a higher background investigation level than the minimum required background investigation for an Access Card based on the Contractor Personnel’s contract employment job duties.
C. Contractor Personnel may be required to submit additional personnel information to other Government Agencies affected by the contract work and based on working within that Agency’s space.
3. GSA may require Contractor Personnel who need less than routine access to GSA facilities or IT systems and networks to receive a favorable result on a National Agency Check (NAC) to access GSA facilities or IT systems and networks. The GSA Contracting Officer or their Designated Representative and/or the Security Officer will define the level of access to GSA facilities or IT systems and networks from a favorable NAC and will define how long the access is valid. Contractor Personnel that are not required to receive a favorable suitability determination may be required to be escorted at all times while in non-public GSA space.
4. The Contractor shall account for all GSA credentials issued to Contractor
Personnel in connection with the performance under this contract. The Contractor Personnel shall immediately return credentials issued by GSA under any of the following conditions:
A. When the Contractor Personnel is no longer required for contract performance.
B. Upon completion of the Contractor Personnel’s employment.
C. Upon contract completion or termination.
D. If the Contractor Personnel is removed from the contractor based on an unfavorable determination on any suitability check.
5. The Contracting Officer may delay final payment or execute an equitable adjustment under the contract, if the Contractor and their Contractor Personnel fail to comply with the requirements set forth in this specification.
6. Contractor shall insert these requirements in all subcontracts. It shall be the responsibility of the Contractor to return all credentials issued by GSA in accordance with the terms set forth in this specification.
B. PART 2 – FEDERAL DEBT REDUCTION AND OVERSIGHT OF FEDERAL FUNDS
1. The GSA has a fiduciary responsibility to provide oversight of federal funding. The Contractor will work with the GSA to reduce expenditures, and assure oversight of federal tax dollars when requesting background checks. In order to reduce expenses and ensure prudent use of federal funds, the Contractor will make every effort to pre-screen or interview prospective personnel to help ensure they are suitable for employment, and are able to pass a
015410-4 background check prior to submitting employee applications to GSA.
2. The Contractor company shall assign and dedicate a single Point of Contact (POC) for the overall control, management, and oversight of all suitability investigation applications for its Contractor employees. The Contractor POC is responsible for collecting all of the Contractor employee background investigation documents and submitting them to the Contracting Officer or their Designated Representative to ensure the completion of the background investigation request. The Contractor POC shall follow the method identified by the GSA Contracting Officer or their Designated Representative and/or the Security Officer to submit the background investigation documents to GSA. The Contractor POC must provide follow-up and monitoring to ensure that the Contractor Personnel who needs an investigation responds to requested information and completes all required forms within the prescribed times allowed so as not to delay the project schedule or project completion date.
3. The Adjudicating Office of the Office of Personnel Management may forward a written notification to contractor personnel for clarification information that pertains to the background investigation requesting additional information or supporting documentation. The POC shall ensure the Contractor responds to such inquiries so as not to cause delay, or consider submitting an alternate applicant so as not to cause delay with the project schedule or project completion date.
C. PART 3 - ADJUDICATION AUTHORITY
1. GSA and the Office of Personnel Management (OPM) or any other named designee, will be responsible for conducting the HSPD-12 background investigations, and credentialing of Contractor Personnel. GSA has the final authority to process the HSPD-12 background investigations, as directed by the OPM.
D. PART 4 - -PROCESSING OF HSPD-12 INVESTIGATIONS AND CREDENTIAL
PROCEDURES
1. Submission of Forms: All Contractor Personnel requiring facility or IT system and network access may be responsible to fill out and complete security HSPD-12 forms and fingerprint cards or electronic fingerprint scans prior to being allowed access. GSA will provide detailed instructions on the HSPD-12 process, the forms to be submitted, and the handling of the forms after the contract has been awarded. Depending on the level of responsiveness and timeliness of individual Contractor personnel, a maximum of fifteen (15) days is expected for the completion and submission of all forms by the applicant for review through the GSA. More importantly, however, the Contractor and the single Contractor Point of Contact (POC) managing all Contractor Personnel has the responsibility to submit applications in a timely fashion so as not to delay any project activities or the overall project schedule. Complete submissions of all suitability investigation forms are required to be provided for all applicants a minimum, thirty (30) days prior to access being required without the need for a HSPD-12 credential or sixty (60) days prior to access being required when a HSPD-12 credential is required. Access requirements by Contractor Personnel shall be based on the contract time performance requirements, and the planned activities on the approved project schedule. The Contracting Officer or their Designated Representative and/or Security Officer will notify the Contractor POC in writing if any Contractor Personnel receive an unfavorable decision on their background investigation, and effective immediately; the individual will no longer be allowed to work on the project. The Contractor Personnel shall be responsible for planning and scheduling its work in such a manner as to account for the facility or IT access requirements.
Difficulties encountered by the Contractor Personnel in gaining access when required by not fulfilling application requirements in a timely manner shall not be an excuse for Contractor non-performance under the contract, or the granting of any time extensions.
015410-5
A. Throughout the life of the contract, the Contractor shall be responsible to follow these same procedures for any new Contractor personnel who will require access to GSA’s space or IT systems and networks.
B. Throughout the life of the contract, the Contractor shall maintain a listing of current/active personnel and their subcontractors’ personnel that have received a favorable suitability investigation and/or have a GSA credential. The Contractor shall provide the Contracting Officer or their Designated Representative, an updated listing of current/active personnel or subcontractors’ personnel when requested.
2. Unsuitable Personnel: If the Contracting Officer receives an unsuitable report on any
Contract Personnel after the processing their application, or if the GSA finds a prospective Contractor Personnel to be unsuitable or unfit for their assigned duties the Contractor POC shall be advised immediately by the Contracting Officer or their Designated Representative and/or the Security Officer that the Contractor Personnel cannot continue to work or be assigned to work under the contract. The Contractor must then take action to remove the Contractor Personnel from the GSA contract.
3. Criteria for Eligibility: Refer to GSA Order 9732.1 or 5 CFR 731 which outlines the disqualifying and mitigating factors for personnel acceptance.
4. Prior Background Investigation: Contractor Personnel background investigations obtained through this process may be acceptable if the investigation can be validated to be equal to or higher level than required of the contract, and there is no break in service from when the suitability was provided. The Contracting Officer or their Designated Representative and/or the Security Officer in consultation with the OPM will determine whether there is a break in service and whether a prior background investigation meets GSA’s requirements to grant access to GSA facilities and IT systems and networks. GSA requires the Contractor Personnel to submit required background investigation documents for GSA to determine whether a prior investigation meet’s GSA requirements to grant access to GSA facilities and IT systems and networks.
5. Identification Credential: The following paragraphs describes GSA’s requirements for
Contractor Personnel to display GSA credentials, follow GSA building screening procedures, and follow procedures to report lost GSA credentials.
A. Contractor Personnel with GSA credentials shall be required to comply with all applicable access security screening procedures applicable to Government or other personnel possessing similar credentials, or as determined by the building practices as defined by the Facility Security Committee.
B. All Contractor Personnel possessing credentials (Access Card, other agency- issued PIV credentials, or other credentials) shall visibly display their credentials at all times while in the building(s) where work is being performed.
C. The Contractor shall be responsible for ensuring that all GSA identification credentials are returned to the GSA when Contactor Personnel are no longer employed, providing service under the contract, the contract ends or the Contractor Personnel is removed as a result of an unfavorable determination on any suitability check.
D. The Contractor Personnel shall notify the GSA when credentials are lost. If the Contractor Personnel is determined to be negligent, the Contractor may be responsible for reimbursing the Government for its cost in issuing a replacement credential.
SECURITY REGULATIONS
015410-6
E. PART 5 - GSA ACCESS CARD: CONTRACTOR’S TRAVEL COSTS
1. Contractor personnel who require routine access to GSA-controlled facilities and/or access to GSA IT systems must receive a preliminary favorable HSPD-12 security background investigation, before receiving a GSA Access Card.
2. Following a favorable HSPD-12 security background investigation, Contractor Personnel may be required to enroll and activate a GSA credential card at a designated location. The credential card is also a photo Identification card, which includes biometric information. The following information is provided to assist the Contractor in estimating the costs that may be associated with this requirement. The Contractor Personnel will be expected to utilize the nearest credentialing site to their offices or place of contract performance. The credentialing station may be a mobile station in the area, or as a fixed station whose location(s) can be located through the following source: http://www.fedidcard.gov/centerlocator.aspx.
Credentialing centers that are listed as “Open to all Agency personnel” are open to all customer agencies including GSA Contractors. Credentialing centers that are listed as “For use by personnel from this Agency only” mean that they are only open to personnel of that specific agency that is hosting that credentialing center. Currently a minimum of two visits to a credentialing center may be required to enroll and activate the GSA credential. The first visit is to enroll for the credential, and the second visit may be required to pick-up and activate the credential. Travel distance to a credentialing center will vary based on availability of enrollment and activation stations identified in the link above. Additional visits to a credentialing center may also be required if the card holder needs to recertify their credential certificate (every 2.5 years), or when the employee will need to renew their GSA credential that has expired (every 5 years). Additional visits may also be required for lost or damaged credentials needing replacement.
3. If a GSA credential card is required, the Contractor would be responsible for all travel and labor costs associated with fingerprinting to meet the background investigation along with the credential card enrollment and activation steps to meet HSPD-12 requirements unless stated otherwise elsewhere in the contract. Travel costs may be comprised of mileage, vehicle rental, or other modes of transportation, per diem, and lodging. These costs are considered reasonable to the extent that they do not exceed, on a daily basis, the maximum rates in effect at the time of travel, as set forth in the Federal Travel Regulation, Chapter 301 – Temporary Duty (TDY) Travel Allowances, which can be accessed at the following website:
http://www.gsa.gov/ftr. Information on Privately Owned Vehicle (POV) Mileage Reimbursement Rates can be accessed at the following website: http://www.gsa.gov/travelpolicy.
4. Any annual training requirements associated with IT access that may be required for continued use of the GSA credential is expected to be completed within a timely fashion. Otherwise, the Contractor Personnel’s access may be revoked and the credential taken away.
F. PART 6 - ADDITIONAL SECURITY ITEMS:
1. Additional background checks may be required by other Federal Agencies, as part of the security clearance procedures.
2. The Government shall furnish the contractor with a copy of suitability determinations and expiration dates for all contract workers. The Government and contractor shall concurrently keep track of expiration dates for the clearances (including clearances issued under previous contracts) of all contract workers. Approximately six (6) months prior to the expiration date of any person's clearance, the contractor shall initiate a new clearance by furnishing a set of fingerprint cards (2 cards or electronic) and personal history statement to the GSA Contracting Officer or Designated Representative and providing the Contracting Officer with the names of those individuals submitted for new clearance. The Contracting Officer or Designated Representative shall notify the contractor of the results of the clearance, including the new expiration date.
http://www.fedidcard.gov/centerlocator.aspx http://www.gsa.gov/ftr http://www.gsa.gov/ftr http://www.gsa.gov/travelpolicy
015410-7
Note: The Government may require the removal of a contract worker whose existing security clearance has expired and who has not yet received new clearance.
Therefore, it is incumbent upon the contractor to actively keep track of the expiration dates of clearances for all contract workers (including subcontract employees) and to submit, in a timely manner, a new set of security forms.
3. Upon request, the contractor shall submit to the Contracting Officer an updated list of contract workers (including employees of both the prime and subcontractors) performing work at the Government site. The contractor shall annotate the names of workers added since the previously submitted list, and shall also list those individuals no longer working on the contract.
Note: The contractor shall return to the GSA Property Manager's Office the ID badges of all individuals (including subcontractor employees) no longer working on the contract.
4. The Government may require the removal of an employee from the worksite for either suitability or security reasons. The contractor shall comply with these requests and provide replacement personnel immediately. Disciplinary actions resulting from nonperformance or deficient performance of contract work shall be handled by the contractor. The Government, however, retains the right to require the permanent removal of an employee should his/her performance so warrant and, in such case, the Government shall provide the contractor with specific reasons for removal, in writing.
Note: The Contracting Officer’s representative shall make all determinations regarding the removal of an employee from the worksite. In the event of a dispute, the Contracting Officer shall make the final decision. Written notification of employee removal will not constitute direction to the contractor to terminate individual employment.
5. The contractor shall comply with all security regulations to include those found in 41 CFR 101-
20.3, 18 USC, and local security policies. At the Government's discretion, the contractor may not be permitted to enter into secured places or to work after hours without being escorted by authorized Government personnel. Keys to electrical closets and telephone rooms may be obtained from the Property Manager's office only after permission has been granted by GSA.
6. All accidents, injuries, damage to Government property, hazardous conditions, breaches of security, and crimes which involve employees of the contractor shall be reported to the GSA PM, the local GSA Property Management office, and DHS/FPS at the FPS Megacenter at 877- 437-7411.
ALL OF THE AFOREMENTIONED SECURITY REQUIREMENTS ARE SUBJECT TO
CHANGE BASED ON REVISED GSA, DHS/FPS, AND/OR TENANT AGENCY
REQUIREMENTS, ELEVATED THREAT LEVELS, AND EMERGENCY CONDITIONS.
G. IDENTIFICATION / BUILDING PASS
1. The Government shall issue identification badges (temporary or permanent, depending on the duration of the work/project) to all contract workers. The Contractor shall see that each contract worker has a "GSA/Contractor" ID badge before being allowed to work on the Government site.
2. The Contractor shall make his employees available for the processing of photo identification badges, when required by the Government, on a schedule to be coordinated by the COR. The Government shall issue the badges after a favorable security report has been received on the employees. Government personnel shall take the pictures, and furnish the equipment and material to make the identification badges. Contractor employees shall sign each badge at the time of photographing.
015410-8
3. All contract workers shall wear the ID badge on the outermost garment, so as to be easily visible for inspection by security and/or other Federal personnel. All contract workers shall carry valid personal identification (e.g., driver’s license, company ID) on their person at all times. The Contracting Officer's Representative (COR) or designee shall periodically verify the ID badge of contractor employees with their personal identification.
4. The contractor shall return all Government-issued ID badges to the COR as contract workers cease their employment on the contract and when the contract expires. The contractor is responsible to return the badges of subcontractor employees in addition to those of its own employees. Final payment shall not be made until all ID badges have been returned and/or accounted for.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 015410
| 1.1 SECURITY REQUIREMENTS |
| B. SUITABILITY CLEARANCE REQUIREMENTS (Non-classified contract(s)) |
| 1.2 HSPD-12 SECURITY AND CREDENTIALING REQUIREMENTS |
| 4. The Contractor shall account for all GSA credentials issued to Contractor Personnel in connection with the performance under this contract. The Contractor Personnel shall immediately return credentials issued by GSA under any of the following condi... |
| B. PART 2 – FEDERAL DEBT REDUCTION AND OVERSIGHT OF FEDERAL FUNDS |
| C. PART 3 - ADJUDICATION AUTHORITY |
| D. PART 4 - -PROCESSING OF HSPD-12 INVESTIGATIONS AND CREDENTIAL PROCEDURES |
| B. Throughout the life of the contract, the Contractor shall maintain a listing of current/active personnel and their subcontractors’ personnel that have received a favorable suitability investigation and/or have a GSA credential. The Contractor shall... |
| C. The Contractor shall be responsible for ensuring that all GSA identification credentials are returned to the GSA when Contactor Personnel are no longer employed, providing service under the contract, the contract ends or the Contractor Personnel is... |
| F. PART 6 - ADDITIONAL SECURITY ITEMS: |
| Note: The Government may require the removal of a contract worker whose existing security clearance has expired and who has not yet received new clearance. Therefore, it is incumbent upon the contractor to actively keep track of the expiration dates o... |
| ALL OF THE AFOREMENTIONED SECURITY REQUIREMENTS ARE SUBJECT TO CHANGE BASED ON REVISED GSA, DHS/FPS, AND/OR TENANT AGENCY REQUIREMENTS, ELEVATED THREAT LEVELS, AND EMERGENCY CONDITIONS. |