Group 9 Roadway Improvements Project.pdf
PDF 325 KB Posted
- Attached to
- Group 9 Roadway Improvements
- Solicitation number
- ES 2026-04
- Issued by
- Wake County, North Carolina
About this file
This is a project description document for the Group 9 Roadway Improvements project administered by a North Carolina local government jurisdiction. The project encompasses multiple roadway and sidewalk improvement initiatives across distinct locations within the municipality. The first component involves sidewalk improvements along Lynn Street through Valley Drive, utilizing existing sidewalk infrastructure. The second major component focuses on Avent Ferry Road improvements extending from Glencastle Way to Gorman Street, which includes the realignment of the Athens Drive intersection. The third component consists of sidewalk construction along Cobblestone Court from the existing midstreet sidewalk to Ridge Road, where a new 5-foot sidewalk will be constructed with associated traffic management measures. Work across all locations includes grading, drainage, paving, curb and gutter installation, ADA-compliant ramps, pavement marking, and erosion control measures.
The document does not provide specific information regarding pricing terms, contract duration, renewal options, bidding deadlines, site visit schedules, or pre-bid conferences. No details regarding project funding sources, budget allocations, incumbent contractors, set-asides, or award timelines are included in the available project description materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .