Greenbelt Water Authority - Final Well Drilling Specifications.pdf
PDF 11 MB Posted
- Attached to
- North Well Field Final Drilling Package
- Solicitation number
- GMA23670
- Issued by
- Travis County, Texas
About this file
This is an invitation to bid and contract document package issued by the Greenbelt Municipal and Industrial Water Authority for the North Well Field Final Drilling Package (GMA23670), a state-funded project to drill and test up to four permanent public water supply wells located approximately 10 miles north of the existing Greenbelt Reservoir in Texas. The project involves furnishing labor, materials, supplies, and equipment to complete drilling, installation, and testing of between two and four permanent water supply wells based on 2025 test hole investigation findings. Specific work items include mobilization, site preparation, surface casing installation, pilot borehole drilling, geophysical logging, borehole reaming, casing and screen installation, gravel pack and filter placement, grouting, well development, pumping tests, water quality analysis, video surveys, and equipment relocation. The Authority anticipates phased construction, potentially stopping after completion and testing of the first two wells (Well No. 3 and Well No. 5) pending aquifer testing results. A non-mandatory pre-bid conference will be held virtually with details posted to Civcastusa.com. Sealed bids must be delivered by 2:00 p.m. on August 15, 2026, with public opening and reading at 3:00 p.m. the same date. Bids will remain subject to acceptance for 60 days from opening, with contract award expected to the lowest responsible offeror. The project requires substantial completion within a contractor-proposed timeframe and final completion within 30 days thereafter.
The Authority's budget for the project is $3,000,000, with unit pricing established for individual line items covering drilling depths, casing diameters, and testing hours. Bid security of five percent of the proposed contract price is required in the form of a bid bond, cashier's check, or certified check. The project is contingent upon release of funds from the Texas Water Development Board (TWDB) and is partially funded through the Clean Water State Revolving Fund or Drinking Water State Revolving Fund, requiring compliance with federal laws including the American Iron and Steel Act, Build America Buy America (BABA) Act, and Davis Bacon Wage Act. The selected contractor must comply with prevailing wage requirements established per Texas Government Code Chapter 2258, provide performance and payment bonds equal to 100 percent of the contract price, and maintain a maintenance bond of five percent of contract price for one year beyond project approval. Contractor must obtain commercial general liability insurance with minimum limits of $2,000,000 general aggregate/$3,000,000 per occurrence, pollution liability insurance, and name the Authority and Design Professional (Freese and Nichols, Inc.) as additional insureds. Liquidated damages are assessed at $500 per day for delays beyond the contractor-proposed substantial and final completion dates. The contractor must provide monthly Build America Buy America Act certifications, Davis Bacon wage certifications, and comply with all TWDB documentation requirements as a condition of funding.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
Greenbelt North Well Field
Final Drilling Package
GMA23670
July 2026
Design Professional Seals 00 01 07 - 1
GMA23670 – North Well Field Final Drilling Package
00 01 07 DESIGN PROFESSIONAL SEALS
Specification Sections Sealed
Division 01
Division 31
Freese and Nichols, Inc.
Texas Registered Engineering
Firm F-2144
Specification Sections Sealed
33 11 13 “Potable Water Supply Wells”
Daniel B. Stephens
Texas Registered Engineering
Firm F-286
END OF SECTION
7/8/26
08/31/26
Table of Contents 00 01 10 - 1
GMA23670 � North Well Field Final Drilling Package
00 01 10 TABLE OF CONTENTS
Section Title
Division 00 Procurement and Contracting Requirements
00 01 01 Project Cover Sheet
00 01 07 Design Professional Seals
00 01 10 Table of Contents
00 11 16 Invitation to Bid
00 21 13 Instructions to Offerors
00 41 13 Bid Form
00 41 16 Bid Form Exhibit A
00 43 13 Bid Bond
00 45 01 Vendor Compliance with Reciprocity on Non-Resident Bidders
00 45 03 Conflict of Interest Questionnaire
00 45 04 State Sales Tax Requirements
00 52 00 Agreement
00 61 13 Performance Bond
00 61 16 Payment Bond
00 61 19 Maintenance Bond
00 61 20 Maintenance Bond Requirements
00 73 16 Insurance Requirements
00 73 17 Texas Workers� Compensation Insurance
00 73 43 Wage Rate Requirements
00 73 46 Wage Determination Schedule
00 74 00 Special Conditions for Texas Water Development Board
00 74 00.01 Certificate of Compliance with American Iron and Steel Requirements (TWDB-1106A)
00 74 00.02 Monthly Build America, Buy America (BABA) Act Certificate (TWDB-1110-A)
00 74 00.03 Final Build America, Buy America Act Certification Compliance Submittal by Owner
(TWDB-1110-B)
00 74 00.04 Contractor�s Act of Assurance (TWDB ED-103)
00 74 00.05 Contractor�s Act of Assurance Resolution (TWDB ED-104)
00 74 00.06 Monthly Davis Bacon Wage Rate Certification (TWDB DB-0154)
00 91 00 Addendum
Division 01 General Requirements
01 11 00 Summary of Work
01 29 00 Application for Payment Procedures
01 29 01 Measurement and Basis for Payment
01 30 00 Contract Administration
01 31 00 Project Management and Coordination
01 33 06 Graphic Documentation
01 34 00 Buy American Requirements
01 35 00 Special Procedures
Table of Contents 00 01 10 - 2
Section Title
01 40 00 Quality Management
01 57 00 Temporary Controls
01 60 00 Product Requirements
01 74 23 Final Cleaning
Division 31 Earthwork
31 11 00 Clearing and Grubbing
31 37 00 Rock Riprap
Division 33 Utilities
33 11 13 Potable Water Supply Wells
Appendices
Appendix A Texas Water Development Board Guidance Documents
END OF SECTION
Invitation to Bid 00 11 16 - 1
GMA23670 � North Well Field Final Well Drilling Package
00 11 16 INVITATION TO BID
ARTICLE 1 � GENERAL NOTICE
1.01 The Greenbelt Municipal and Industrial Water Authority (Owner) is requesting Bids for the construction of the following Project:
North Well Field Final Drilling Package
GMA23670
1.02 Description of the Work
A. This project is a state funded project to drill up to four permanent public water wells at a private property approximately 10 miles north of the existing Greenbelt Reservoir.
1.03 The Owner�s Budget for the Project is $3,000,000. The Project is apart of overall improvements to include permanent wells and transmission line and requests an expedited construction schedule. The Project is to be complete and eligible for final payment 30 days after the date for
Substantial Completion.
ARTICLE 2 � EXAMINATION AND PURCHASE OF DOCUMENTS
2.01 Advertisement and bidding information for the Project can be found at the following procurement website:
www.Civcastusa.com
2.02 Prospective Offerors must register with the procurement website as a plan holder, even if the
Contract Documents are obtained from a plan room or other site. All official notifications, Addenda, and other documents will be offered only through the procurement website.
2.03 The Contract Documents may be downloaded from the procurement website by prospective
Offerors registered as plan holders. Offerors are responsible for ensuring that a complete set of documents, as defined in Section 00 52 13 �Agreement,� are used in the preparation of their
Bids. The documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download does not confer a license or grant permission or authorization for any other use. Authorization to download documents includes the right for
Offerors to print documents for their sole use, provided they pay all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.04 The procurement website will be updated periodically with Addenda, lists of interested parties, reports, or other information relevant to submitting a Bid for the Project.
2.05 Printed copies of the Contract Documents, Technical Data, and other information may be examined free of charge at the following address:
Greenbelt Municipal and Industrial Water Authority
4610 State Hwy 70, Clarendon, TX 79226
Clarendon, TX 79226
Hours Available for Viewing: 8 am � 5 pm
Invitation to Bid 00 11 16 - 2
ARTICLE 3 � PRE-BID CONFERENCE
3.01 A pre-bid meeting will be provided virtually. The date and time for the meeting will be posted to
Civcastusa.com at a later date.
ARTICLE 4 � QUESTIONS REGARDING BIDDING PROCESS OR SOLICITATION DOCUMENTS
4.01 Questions are to be submitted using the question and answer process on the procurement website. Responses to questions posted on the procurement website will be posted for the benefit of all Offerors. A response will be posted for questions submitted until 12:00 p.m. 1 week prior to the bid opening date.
4.02 A response to a question posted on the procurement website that requires modification of the
Contract Documents will be made by Addenda. Modifications to the Contract Documents prior to the award of the Contract can only be made by Addenda. Only answers in Addenda posted on the procurement website will be binding. Oral and other interpretations or clarifications will be without legal effect.
ARTICLE 5 � BID SECURITY
5.01 Offerors must submit an acceptable Bid Security with their Bids as a guarantee that the
Successful Offeror will enter into a contract for the Project with the Owner within 15 days of
Notice of Award of the Contract. The Bid Security must be payable to Greenbelt Municipal and
Industrial Water Authority in the amount of 5 percent of the proposed Contract Price. The
Successful Offeror must execute the Contract and bonds on the forms provided in the Contract
Documents and provide evidence of insurance as required by the Contract Documents.
5.02 Bid Security must be in the form of a bid bond. The bid bond may be submitted on the form provided in Section 00 43 13 �Bid Bond� or Offerors may provide their surety�s standard penal sum bid bond form. The bid bond must reference the Owner and the Project by name as identified in this Section.
5.03 Bid Security may be in the form of a bid bond, a cashier�s check, or certified check. Checks must be made out to Greenbelt Municipal and Industrial Water Authority. The bid bond may be submitted on the form provided in Section 00 43 13 �Bid Bond� or Offerors may provide their surety�s standard penal sum bid bond form. The bid bond must reference the Owner and Project by name as identified in this Section.
ARTICLE 6 � DELIVERY OF BIDS
6.01 Sealed Bids must be delivered to the Owner at the address below no later than 2 p.m. on August
15th, 2026 to be accepted. The Bids will be publicly opened and read aloud at 3 p.m. this date including the names of the Offerors and their Bids. Bids received after this time will be returned unopened. Address Bids to the Owner as follows:
Greenbelt Municipal and Industrial Water Authority
Attn: Bid � North Well Field Aquifer Test (GMA23670)
P.O. Box 665
Clarendon, TX 79226
Invitation to Bid 00 11 16 - 3
6.02 All Bids delivered less than 30 minutes before the time designated in Paragraph 6.01 must be delivered to the following address:
Greenbelt Municipal and Industrial Water Authority
Attn: Bid � North Well Field Aquifer Test (GMA23670)
4610 State Highway 70
Clarendon, TX 79226
ARTICLE 7 � AWARD OF CONTRACT
7.01 It is the intent of the Owner to award this Contract to the lowest responsible Offeror. The
Owner reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating bid prices, to reject any or all Bids, and/or waive formalities. Bids will remain subject to acceptance and may not be withdrawn within 60 days from the date on which Bids are opened. The Authority may be held for up to 60 days before awarding the contract. All responsive bidders will be held responsible for submitting the necessary bid security and following the TWDB requirements set forth in the provided specifications.
ARTICLE 8 � OTHER CONTRACT REQUIREMENTS
8.01 This contract is contingent upon release of funds from the Texas Water Development Board. Any contract(s) awarded under this invitation for bids is/are expected to be funded in part by financial assistance from the Texas Water Development Board (TWDB). Neither the
Environmental Protection Agency (EPA) or the State of Texas, nor any of their departments, agencies, or employers, are or will be a party to this Invitation for Bids or any resulting contracts.
8.02 The following federal laws and bid requirements will be required as apart of any ensuing contract(s):
A. American Iron and Steel (AIS) Act
B. Build America, Buy America (BABA) Act
C. Bid Bond/Guarantee, equivalent to five percent of the bid price
D. David Bacon Wage Act
E. State Revolving Fund procurement guidance
F. Equal Employment Oppurtunity (EEO)
G. Debarment and Suspension Certification
8.03 The Funding Agency requires specific conditions and reporting as a condition for providing this funding. The conditions and reporting forms of the Funding Agency are included in the Contract
Documents in Section 00 74 00 �Special Conditions for TWDB Funded Projects.�
8.04 Selected Contractor will be required to pay the prevailing wage rates established for this Project in accordance with the Contract Documents and Tex. Gov�t Code Chapter 2258.
8.05 Performance and payment bonds will be required for this Project.
8.06 For TWDB related information, refer to specification 00 74 00.
Instructions to Offerors 00 21 13 - 1
00 21 13 INSTRUCTIONS TO OFFERORS
ARTICLE 1 � DEFINED TERMS
1.01 The terms used in these Instructions to Offerors have the meanings assigned to them in the
General Conditions and Supplementary Conditions.
ARTICLE 2 � RECEIPT OF BIDS
2.01 Refer to Section 00 11 16 �Invitation to Bid� for information on receipt of Bids.
ARTICLE 3 � COPIES OF CONTRACT DOCUMENTS
3.01 Obtain a complete set of the Contract Documents as indicated in Section 00 52 00 �Contract.�
3.02 Use complete sets of Contract Documents in preparing Bids. Offeror assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract
Documents.
3.03 Owner makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use.
ARTICLE 4 � QUALIFICATIONS STATEMENT
4.01 Not Used.
ARTICLE 5 � EXAMINATION OF THE CONTRACT DOCUMENTS AND THE SITE
5.01 Examine the Contract Documents, the Site, and other information readily available before submitting a Bid.
A. Examine the Contract Documents and supplemental data:
1. Carefully study the Contract Documents.
2. Carefully study supplemental information, including Technical Data, record drawings from previous projects, available utility maps, reports, and studies referenced or made available to the Offeror.
3. Promptly notify the Construction Manager of all conflicts, errors, ambiguities, or discrepancies that the Offeror discovers in the Contract Documents, Addenda, and supplemental information.
4. Determine that the Contract Documents, Addenda, and supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work to the degree necessary to prepare a Bid for the Project.
5. Make observations and investigations, correlate knowledge and observations with the requirements of the Contract Documents, and consider these in preparation of a Bid for the Project.
B. Become familiar with all federal, state, and local Laws and Regulations that may affect cost, progress, or the completion of Work.
Instructions to Offerors 00 21 13 - 2
C. Visit the Site to become familiar with any general, local, or Site conditions that may affect the cost, progress, or performance of the Work in any manner. Coordinate access to private property through the Owner.
D. Subsurface exploration is not allowed.
E. The submission of a Bid will constitute an incontrovertible representation by the Offeror that the Offeror has complied with every requirement of this Article, and that without exception the Bid is premised on the following:
1. Work will be completed in accordance with the Contract Documents for the Contract
Price within the Contract Times;
2. Offeror has given the Construction Manager written notice of all conflicts, errors, ambiguities, and discrepancies that the Offeror has discovered in the Contract
Documents, Addenda, and the related supplemental data;
3. Written resolutions provided by the Construction Manager are acceptable to the
Offeror; and
4. Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work.
ARTICLE 6 � PRE-BID CONFERENCE
6.01 A non-mandatory pre-bid conference will be held at the time and location indicated in
Section 00 11 16 �Invitation to Bid.�
ARTICLE 7 � INTERPRETATIONS AND ALTERNATE BIDS
7.01 Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data to the Construction Manager using the procurement website as indicated in Section 00 11 16 �Invitation to Bid.�
7.02 Submit any offer of alternate terms and conditions or offer of Work not in strict compliance with the Contract Documents to the Construction Manager no later than 10 days after the date
Project is advertised. Construction Manager and Design Professional will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted. A Bid submitted with clarifications or taking exceptions to the Contract Documents, except as modified by Addenda, will be considered non-responsive.
7.03 Offeror may submit a separate and additional Bid if the Offeror includes exceptions or the
Offeror wishes to make a Bid that is not in accordance with the terms and conditions of the
Contract Documents, or for Work that is not in strict compliance with the Contract Documents.
Describe the intent and substance of the changes in the additional Bid in adequate detail so they are clearly understood. Alternate Bids will not be considered in the evaluation of the Bids. Upon selection of the Bid of the lowest responsible Offeror, and after the award of the Contract, the
Construction Manager may issue a Request for a Change Proposal if Owner chooses to accept any Bid alternates.
7.04 Addenda may be issued to clarify, correct, or change the Contract Documents, Addenda, or the related supplemental data as deemed advisable by the Owner or Designer.
Instructions to Offerors 00 21 13 - 3
ARTICLE 8 � BID SECURITY
8.01 Offerors must submit an acceptable bid bond, cashier�s check, or certified check as Bid Security with their Bids as required by Section 00 11 16 �Invitation to Bid.� The acceptable bid bond must be issued by a surety legally authorized to do business in Texas and meet the requirements of the General Conditions. Cashier�s or certified checks must be made payable to the Greenbelt
Municipal and Industrial Water Authority and are to be effective on the day Bids are submitted and valid for a period of at least 60 days from the date the check is issued.
8.02 Owner may annul the Notice of Award and retain the Bid Security of the apparent Successful
Offeror upon Offeror�s failure to execute and deliver the Agreement or Amendments to the
Agreement. Agreements and Amendments include all required TWDB documentation.
8.03 Bid Securities are to remain in effect until the Contract is executed. Bid bonds will become void when the Contract is awarded, or all Bids are rejected. Cashier�s or certified checks will be returned by the Owner when the Contract is executed, or all Bids are rejected.
ARTICLE 9 � CONTRACT TIMES
9.01 The Project must be completed no later than the dates indicated in Section 00 11 16 �Invitation to Bid.� Offeror is to enter in the number of days proposed to Substantially Complete the Project and to complete the Work required for final payment in accordance with the General Conditions in Section 00 41 16 �Bid Form Exhibit A.� These dates will be used to calculate the Substantial
Completion and Final Completion dates from the date of the Notice to Proceed and will be used to define the Contract Times. Liquidated damages as defined in the Agreement will start to accrue after these dates.
ARTICLE 10 � LIQUIDATED DAMAGES, RETAINAGE, AND INTEREST
10.01 Provisions for liquidated damages and the payment of retainage and interest are set forth in the
Agreement.
ARTICLE 11 � PREPARATION OF THE BID FORM
11.01 The Bid Form is included with the Contract Documents and is also available at the procurement website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate prices for each item or alternate shown in the Bid Form.
11.02 The unit price governs if a conflict exists between the extended amount derived by multiplying the unit price by the stated quantity of units and the extended amount shown in the Bid Form.
11.03 Execute the Bid Form as indicated in the document and include evidence of authority to sign.
11.04 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum.
Provide a signature as indicated to verify that the Addenda were received. A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive.
11.05 Provide the name, address, and telephone number of the individual to be contacted for any communications regarding the Bid in the Bid Form.
Instructions to Offerors 00 21 13 - 4
11.06 Provide evidence of the Offeror�s authority and qualification to do business in Texas or agree to obtain such qualification prior to award of the Contract. Failure to obtain this qualification will render the Bid non-responsive and Offeror will forfeit its Bid Security.
11.07 Refer to Article 23 for information on minority or women business enterprises and required participation program.
ARTICLE 12 � CONFIDENTIALITY OF BID INFORMATION
12.01 The Owner is a governmental body subject to the limitation of Tex. Gov�t Code Chapter 552 and has limited obligations with regard to protecting confidential information submitted by Offerors.
Bids will be opened in a manner that avoids disclosure of trade secrets and confidential information to competing Offerors and keeps the Bids from the public until a contract is awarded. The Owner will protect trade secrets and confidential information to the extent allowed by Laws and Regulations.
12.02 Clearly indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word �confidential� prominently on each page or sheet or on the cover of bound documents. Place �confidential� stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Submit all confidential information in a different binder so this confidential material is separate from the rest of the Bid.
12.03 The Owner, upon receiving an application or other request for the disclosure of confidential information, will promptly notify Offeror of the request as required by Section 552.305 and request a ruling by the Texas Attorney General as to whether any such information may be released.
12.04 Offeror acknowledges and agrees that it will be solely responsible for submitting any arguments, authorities, or other information to the Attorney General of Texas regarding release of the information marked as confidential as provided by Section 552.305(b) and that if disclosure is required, the Owner has no liability for releasing this information and Offeror will not be entitled to exercise any remedy for a disclosure made pursuant to the Chapter 552.
12.05 The obligations of the Owner as recipient with respect to confidential information under the terms of this Agreement are subject to the following exceptions:
A. If confidential information becomes a part of the public domain through publication or otherwise but through no fault of the Owner;
B. Owner can demonstrate through suitable documentation that the confidential information was already in the Owner�s possession or otherwise publicly available prior to the date of disclosure hereunder;
C. The confidential information is subsequently disclosed to the Owner by a third party who has a lawful right to disclose such information; or
D. The Owner is required to disclose the confidential information by court order or by applicable law.
12.06 If the Owner is requested or becomes legally compelled (by oral questions, interrogatories, requests for information or documents, subpoena, civil or criminal investigative demand, public information requests, including requests under Chapter 552, or similar process) or is required by
Instructions to Offerors 00 21 13 - 5 a regulatory body to make any disclosure that is prohibited or otherwise constrained by this
Agreement, the Owner will provide Offeror with prompt notice of this request so that it may seek an appropriate protective order or other appropriate remedy.
ARTICLE 13 � DELIVERY OF BIDS
13.01 Complete and deliver the Bid Form along with all required documents identified in the Bid Form.
13.02 Submit the Bid no later than the date and time prescribed and at the place indicated in
Section 00 11 16 �Invitation to Bid.� Enclose the Bid in an opaque sealed envelope plainly marked with the Project name and the name and address of the Offeror, along with the Bid
Security and other required documents. Enclose the sealed envelope containing the Bid in a separate envelope plainly marked on the outside with the notation �BID ENCLOSED� if the Bid is sent by mail or other delivery system. Address the outer envelope to the mailing address shown in Section 00 11 16 �Invitation to Bid.� Offeror assumes full responsibility for ensuring that the
Bid arrives at the prescribed location before the prescribed time.
ARTICLE 14 � MODIFICATION OR WITHDRAWAL OF BIDS
14.01 Modify or withdraw a Bid using a document executed in the same manner that a Bid must be executed. Deliver the document to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
14.02 An Offeror may withdraw its Bid within 24 hours after Bids are opened if the Offeror files a signed written notice with the Owner and promptly thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid. The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. An Offeror that requests to withdraw its Bid under these conditions may be disqualified from responding to a reissued Invitation to Bid for the Work to be furnished under these Contract Documents.
ARTICLE 15 � OPENING OF BIDS
15.01 Bids will be opened at the time and place indicated in Section 00 11 16 �Invitation to Bid.� The
Owner will publicly acknowledge receipt of Bids received in time to be considered and then open and read aloud the names of the Offerors and the amount bid as required by applicable
Laws and Regulations.
ARTICLE 16 � BIDS TO REMAIN SUBJECT TO ACCEPTANCE
16.01 All Bids will remain subject to acceptance for the number of days specified in Section 00 11 16
�Invitation to Bid.� The Owner may, at its sole discretion, release any Bid and return the Bid
Security prior to the end of this period.
ARTICLE 17 � EVALUATION OF BIDS
17.01 The Owner will consider the proposed Contract Price and Contract Times and the qualifications of the Offerors to determine the lowest responsible Offeror.
Instructions to Offerors 00 21 13 - 6
17.02 Owner will consider earlier completion dates in selecting the Contractor for the Project. The value of this early completion will be determined by calculating the number of days between the
Offeror�s proposed completion dates and the Owner�s completion dates indicated in
Section 00 11 16 �Invitation to Bid.� This number of days will be multiplied by the Liquidated
Damages amounts indicated in the Agreement to determine the value of early completion. This value for early completion will be used to adjust the Contract Price when evaluating the proposed Contract Price. The calculation is solely for the evaluation of Bids and does not alter the Contract Price from the amounts included in the Bid.
17.03 Owner may conduct such investigations as it deems necessary to establish the responsibility, qualifications, and financial ability of consultants, individuals, or entities proposed to furnish parts of the Work in accordance with the Contract Documents.
17.04 Each Offeror agrees to waive any claim it has or may have against the members of the OPT and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any Bid.
17.05 Notwithstanding any other provision of the Contract Documents, it is stipulated and agreed that by accepting a Bid, the Owner has not and does not waive its sovereign immunity from suit and/or liability.
ARTICLE 18 � AWARD OF CONTRACT
18.01 Owner reserves the right to reject any and all Bids, including non-conforming, non-responsive, or conditional Bids. The Owner may also reject the Bid of any Offeror if the Owner believes that it would not be in the best interest of the Owner to make an award to that Offeror. The Owner reserves the right to waive all formalities.
18.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered, except as additional Bids in accordance with Article 7. Reasonable grounds for believing that any Offeror has an interest in more than one Bid for the Work will be cause for disqualification of that Offeror and the rejection of all Bids in which that Offeror has an interest.
18.03 The Contract will be awarded to the lowest responsible Offeror if a contract is to be awarded.
18.04 Owner may consider the following in evaluating the Bids and awarding the Contract:
A. Offeror's qualifications and ability to demonstrate current capability to complete the
Project in conformance with the requirements of the Contract Documents.
B. Compliance of the Bids with requirements of the Contract Documents.
C. Alternates and unit prices if requested in the bid forms.
D. The amount bid.
E. Proposed date of completion and the ability to meet intermediate Milestones that may have been established for the Project.
Instructions to Offerors 00 21 13 - 7
ARTICLE 19 � BONDS AND INSURANCE
19.01 The General Conditions set forth the Owner�s requirements as to bonds and insurance. When the Successful Offeror delivers the executed Agreement to the Owner, it must be accompanied by the performance and payment bonds and required evidence of insurance.
19.02 Provide performance and payment bonds for this Project that fully comply with the provisions of
Tex. Gov�t Code Chapter 2253. Administration of these bonds will conform to Chapter 2253 and the provisions of the Contract Documents.
ARTICLE 20 � SIGNING OF THE AGREEMENT
20.01 The Notice of Award to the Successful Offeror will be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents that are identified in the Agreement. The Successful Offeror must sign and deliver the required number of counterparts of the Agreement and attached documents to the Owner within 15 days. The
Owner will deliver two fully signed counterparts to the Successful Offeror within 10 days after receiving the signed documents from the Successful Offeror.
20.02 The Successful Offeror must also complete and submit a Certificate of Interested Parties (Form
1295) to the Owner as required by Tex. Gov�t Code Chapter 2252 with the signed Agreement.
ARTICLE 21 � SALES AND USE TAXES
21.01 The Owner generally qualifies as a tax-exempt agency as defined by the statutes of the State of
Texas and is usually not subject to any local or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Offerors assume responsibility for including any applicable sales taxes in their Bids and for complying with all applicable statutes and rulings of the State of Texas Comptroller.
21.02 It is the Owner�s intent to have this Contract qualifies as a �separated contract.� In order for this
Contract to qualify:
A. Obtain a sales tax permit from the State of Texas Comptroller if awarded this Contract.
B. Identify the dollar value of materials exempt from the sales tax. This information must be reported in Section 00 45 04 �State Sales Tax Requirements.� Bids that do not include the information requested in this Section may be considered non-responsive.
ARTICLE 22 � WAGE RATES
22.01 This Contract is subject to Tex. Gov�t Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in Section 00 73 43
�Wage Rate Requirements.� A schedule listing the minimum wage rates for various classifications of laborers which have been established by the Owner for this Project are included in Section 00 73 46 �Wage Determination Schedule.� Offerors will be required to pay at least the minimum wages shown on this list and comply with all applicable federal, state, and local Laws and Regulations related to the payment of prevailing wage rates.
Instructions to Offerors 00 21 13 - 8
ARTICLE 23 � FUNDING AGENCY PROVISIONS
23.01 This contract is contingent upon release of funds from the Texas Water Development Board. Any contract(s) awarded under this invitation for bids is/are expected to be funded in part by financial assistance from the Texas Water Development Board (TWDB). Neither the
Environmental Protection Agency (EPA) or the State of Texas, nor any of their departments, agencies, or employers, are or will be a party to this Invitation for Bids or any resulting contracts.
23.02 The following federal laws and bid requirements will be required as apart of any ensuing contract(s):
A. American Iron and Steel (AIS) Act
B. Build America, Buy America (BABA) Act
C. Bid Bond/Guarantee, equivalent to five percent of the bid price
D. David Bacon Wage Act
E. State Revolving Fund procurement guidance
F. Equal Employment Oppurtunity (EEO)
G. Debarment and Suspension Certification
23.03 The Funding Agency requires specific conditions and reporting as a condition for providing this funding. The conditions and reporting forms of the Funding Agency are included in the Contract
Documents in Section 00 74 00 �Special Conditions for TWDB Funded Projects.�
23.04 Complete and provide the following documents with the Bid:
Specification
Section Title
Funding Agency
Document No.
00 74 00.01 Certification of Compliance with U.S. Iron and Steel
Requirements
TWDB-1105A
00 74 00.02 Contractor�s Act of Assurance TWDB ED-103
00 74 00.03 Contractor�s Act of Assurance Resolution TWDB ED-104
23.05 The Funding Agency requirements govern in the event of any conflict between the Funding
Agency requirements and any other provision of the Contract Documents.
Bid Form 00 41 13 - 1
00 41 13 BID FORM
ARTICLE 1 � BID RECIPIENT
1.01 Offeror submits this Bid to:
Greenbelt Municipal and Industrial Water Authority
P.O. Box 665
Clarendon, TX 79226
Attention: North Well Field Final Drilling Package
ARTICLE 2 � OFFEROR�S ACKNOWLEDGMENTS
2.01 Offeror proposes and agrees, if this Bid is accepted, to enter into an Agreement with the Owner on the form included in the Contract Documents and to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid or as modified by Contract
Amendment. Offeror agrees to complete the Work within the Contract Times established in the
Agreement or as modified by Contract Amendment and comply with all terms and conditions of the Contract Documents.
2.02 Offeror accepts all terms and conditions of Section 00 11 16 �Invitation to Bid� and
Section 00 21 13 �Instructions to Offerors.�
2.03 Offeror accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement.
2.04 Offeror acknowledges receipt of the following Addenda:
Addendum No. Addendum Date Signature Acknowledging Receipt
ARTICLE 3 � OFFEROR�S REPRESENTATIONS
3.01 Offeror has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
3.02 Offeror has visited the Site and become familiar with and is satisfied as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
3.03 Offeror is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work.
3.04 Offeror has carefully studied the following Site-related reports and drawings as identified in the
Supplementary Conditions:
A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site;
B. Drawings of physical conditions relating to existing surface or subsurface structures at the
Site;
C. Underground Facilities referenced in reports and drawings;
Bid Form 00 41 13 - 2
D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and
E. Technical Data related to each of these reports and drawings.
3.05 Offeror has considered the:
A. Information known to the Offeror;
B. Information commonly known to contractors doing business in the locality of the Site;
C. Information and observations obtained from visits to the Site; and
D. The Contract Documents.
3.06 Offeror has considered the items identified in this Article with respect to the effect of such information, observations, and documents on:
A. The cost, progress, and performance of the Work;
B. The means, methods, techniques, sequences, and procedures of construction to be employed by Offeror; and
C. Offeror�s safety precautions and programs.
3.07 Offeror agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents based on the information and observations referred to in the preceding paragraphs.
3.08 Offeror is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
3.09 Offeror has correlated the information known to the Offeror, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the
Contract Documents.
3.10 Offeror has given the Construction Manager written notice of all conflicts, errors, ambiguities, or discrepancies that the Offeror has discovered in the Contract Documents, and the written resolution provided by the Construction Manager is acceptable to the Offeror.
3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
3.12 Offeror�s submittal of a Bid constitutes an incontrovertible representation that, without exception, all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents.
ARTICLE 4 � BASIS OF OFFER
4.01 Offeror will complete the Work in accordance with the Contract Documents at the unit prices shown in the attached in Section 00 41 16 �Bid Form Exhibit A�:
A. Extended amounts have been computed in accordance with the General Conditions.
Bid Form 00 41 13 - 3
B. Offeror acknowledges that the estimated quantities are not guaranteed, and final payment for all unit price items will be based on actual quantities provided, measured as provided in the Contract Documents.
C. Unit prices will be used to compute the actual Bid price.
ARTICLE 5 � TIME OF COMPLETION
5.01 Offeror agrees that the Work will be Substantially Complete and will be completed and ready for final payment in accordance with the General Conditions within the number of calendar days indicated in Section 00 41 16 �Bid Form Exhibit A.�
ARTICLE 6 � ATTACHMENTS TO THIS BID
6.01 The following documents are attached to and made a condition of this Bid:
A. Section 00 41 16 �Bid Form Exhibit A.�
B. Section 00 43 13 �Bid Bond.�
C. Section 00 45 01 �Vendor Compliance with Reciprocity on Non-Resident Bidders (TWDB-
0459).�
D. Section 00 45 02 �Non-Collusion Certification.�
E. Section 00 45 03 �Conflict of Interest Questionnaire.�
F. Section 00 45 04 �State Sales Tax Requirements.�
G. Documentation required by Section 00 74 00 �Requirements for TWDB Funded Programs.�
H. Documentation/TWDB forms shown in Appendix A.
ARTICLE 7 � VENUE
7.01 Offeror agrees that venue will lie exclusively in Donley County, Texas for any legal action.
Bid Form 00 41 13 - 4
ARTICLE 8 � BID DELIVERY
8.01 This Bid is submitted by:
Offeror:
(typed or printed name of organization)
Signature:
(individual�s signature)
Name:
(typed or printed)
Title:
(typed or printed
Address for giving notices:
Phone: Email:
(Attach evidence of authority to sign if Offeror is a corporation, partnership, or a joint venture.)
Project: Project No.:
Owner: GMA23670
Design Professional: TWDB Proj. No. 62935
Offeror:
Item No. Item Description Unit Estimated
Quantity Unit Price Extended Amount
A-01 Mobilization LS 1
A-02 Site preparation, restoration, and cleanup EA 4
A-03 Install 24-inch low carbon steel surface casing to 20 feet bgs LF 84
A-04 Drill 7-7/8-inch pilot borehole LF 2,570
A-05 Geophysical logging, per specification EA 4
A-06 Ream to 20-inch diameter borehole LF 2,530
A-07 Supply and install 12-inch HSLA casing LF 1,470
A-08 Supply and install 12-inch stainless-steel, wire-wrapped well screen LF 315
A-09 Supply and install 12-inch stainless-steel casing (casing between sections of screen, sump, and bullnose cap) LF
A-10 Supply and install 14-inch HSLA casing LF 575
A-11 Supply and install 14-inch stainless-steel, wire-wrapped well screen LF 130
A-12 Supply and install 14-inch stainless-steel casing (sump and bullnose cap) LF
A-13 Supply and install 2.375” OD sounding line LF 2,085
A-14 Supply and Install 4.5” OD chemical feed line LF 40
A-15 Supply and install silica sand gravel pack for 12-inch wells, 8/16 gradation, in place LF
A-16 Supply and install silica sand gravel pack for 14-inch wells, 8/12 gradation, in place LF
A-17 Supply and install silica sand filter pack, 20/40 gradation, in place LF 40
A-18 Supply and install bentonite seal, in place LF 40
A-19 Cement-bentonite grouting of annulus, in place LF 1,905
A-20 Well development – bailing/swabbing HR 48
A-21 Well development – airlifting HR 160
A-22 Complete well disinfection EA 4
A-23 Furnish, install, and remove test pump EA 4
A-24 Well development – pumping HR 48
A-25 10-hour step rate pumping test HR 40
A-26 36-hour constant rate pumping test HR 144
A-27 Water quality analysis (including VOCs) EA 4
A-28 Video and alignment surveys EA 4
A-29 Standby HR 0
A-30 Install supply well concrete pad EA 4
A-31 Relocation of drilling equipment to next well location
EA
A-32 Demobilization LS 1
C -$
D
E -$
I Offeror agrees to reach Final Completion in days
Offeror:
Signature:
Printed Name:
Title:
Date:
Comments:
BID SUBMITTED BY:
Total Base Bid Items Amount (Sum of Extended Amounts for each Base Bid Line Item)
Add (+) or Deduct (-) (See Note 1)
Total Adjusted Base Bid Amount (C plus D)
Provision is made for Offeror to include an addition or deduction in the Bid to reflect any last minute adjustments in price. The addition or deduction, if made, will be applied proportionately.
Notes
Contract Time
00 41 16 Bid Form Exhibit A
Items in Part 1 - Aquifer Testing Base Bid (excluding Allowances) per Section 01 29 01 "Measurement and Basis for Payment"
Base Bid
Greenbelt North Well Field Final Well Drilling Package
Greenbelt Municipal and Industrial Water Authority
Freese and Nichols, Inc.
Bid Form Exhibit A
GMA23670 - Final Well Drilling Package
00 41 16-1
Bid Bond 00 43 13 - 1
00 43 13 BID BOND
Offeror as Principal Surety
Name: Name:
Mailing address (principal place of business): Mailing address (principal place of business):
Owner Physical address (principal place of business):
Name:
Greenbelt Municipal and Industrial
Water Authority
Mailing address (principal place of business):
Telephone (Main):
4610 State Highway 70
Clarendon, TX 79226
Telephone (Claims):
Contract Surety�s state of incorporation:
Project name and number: GMA23670
North Well Field Final Drilling Package
By submitting this bond, Surety affirms it is authorized to do business and licensed to execute bonds in the state where the Project is located.
Local Agent for Surety
Bid/Proposal Due Date: Name:
Bond Company:
Contract Price Offered: Mailing address (principal place of business):
Penal Sum of Bond:
5% of Contract Price offered
Date of Bond: Telephone (Main):
Bid Bond 00 43 13 - 2
Surety and Offeror, intending to be legally bound by this bond, do each cause this bond to be duly executed on its behalf by its authorized officer, agent, or representative. Surety and Offeror bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if Owner accepts the Offeror�s Bid or
Proposal and Offeror delivers the executed Agreement and the required bonds and evidence of insurance within the time stipulated in the Bidding or Proposal Documents this obligation is null and void. Payment under this bond will be due and payable upon default by Offeror and within 30 days after receipt by Offeror and Surety of written notice of default from Owner. This Agreement shall be administered and interpreted under the laws of the state where the Project is located.
Venue lies exclusively in Donley County, Texas for any legal action.
Offeror as Principal Surety
Signature: Signature:
Name: Name:
Title: Title:
Email: Email:
(Attach Power of Attorney)
Vendor Compliance with Reciprocity on Non-Resident Bidders (TWDB-0459) 00 45 01 - 1
00 45 01 VENDOR COMPLIANCE WITH RECIPROCITY ON NON-RESIDENT BIDDERS
(TWDB-0459)
Texas Government Code Section 2252.002 provides that in order for nonresident bidders to be awarded a governmental contract, the bidder must bid projects for construction, improvements, supplies, or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a
Texas resident bidder would be required to underbid the nonresident bidder in order to obtain a comparable contract in the nonresident bidder�s state. A nonresident bidder is a person, including a contractor, whose principal place of business or corporate office is outside of the state of Texas. This requirement does not apply to a contract involving Federal funds. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of a nonresident bidder to do so will automatically disqualify that bidder. Resident bidders must check the blank in Section B.
A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law.
A copy of the statute is attached.
Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders.
B. Our principal place of business or corporate office is in the state of Texas: ☐
BIDDER
Company
City State Zip
By (print name)
Signature
Title (print)
THIS FORM MUST BE RETURNED WITH THE BID
Conflict of Interest Questionnaire 00 45 03 - 1
00 45 03 CONFLICT OF INTEREST QUESTIONNAIRE
SA
M
PL
E
Conflict of Interest Questionnaire 00 45 03 - 2
END OF SECTION
SA
M
PL
E
State Sales Tax Requirements 00 45 04 - 1
00 45 04 STATE SALES TAX REQUIREMENTS
Comply with all applicable sales, excise, and use tax requirements of the Texas Tax Code. The Offeror hereby certifies that the Contract Price is divided as follows:
Tax exempt products, materials, and services (See Notes 1 and 2) $
Taxable products, materials, and services (See Note 3) $
Total (See Note 4) $
Offeror:
(typed or printed name of organization)
Signature:
(individual�s signature)
Name:
(typed or printed)
Title:
(typed or printed
Business Address:
Phone: Email:
(Attach evidence of authority to sign if Offeror is a corporation, partnership, or a joint venture.)
Notes:
1. Exempt products and materials are those items purchased for the Project which are physically incorporated into the facilities constructed for the Owner or are necessary and essential for the performance of the Work and are completely consumed at the Site. For purposes of this definition, products and materials are completely consumed if after being used once for its intended purpose it is used up or destroyed. Products and materials rented or leased for use in the performance of the Work cannot be completely consumed for the purposes of this definition.
2. Exempt services are those services performed at the Site where the Contract expressly requires the specific service to be provided or purchased by the person performing the Work or the service is integral to the performance of the Work.
3. Products, materials, and services are not tax exempt if they are used by the Contractor but are not physically incorporated into the Owner's facilities or are not consumed by construction as defined above. Machinery or equipment and its accessories and repair and replacement parts used in the performance of the Work are not exempt.
4. The total sum of the amount for tax exempt and taxable products, materials, and services must equal the Contract Price.
Agreement 00 52 13 - 1
00 52 13 AGREEMENT
This Agreement is between the Greenbelt Municipal and Industrial Water Authority(Owner) and
_______________________________________________________(Contractor).
Owner and Contractor agree as follows:
ARTICLE 1 � WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The
Work is designated as follows:
North Well Field Final Drilling Package
GMA23670
ARTICLE 2 � DESIGN PROFESSIONAL
2.01 The Design Professional for this Project is:
Freese and Nichols Inc.
801 Cherry St
STE 2800
Fort Worth, TX 76102
ARTICLE 3 � CONSTRUCTION MANAGER
3.01 The Construction Manager for this Project is:
Freese and Nichols Inc.
801 Cherry St
STE 2800
Fort Worth, TX 76102
ARTICLE 4 � CONTRACT TIMES
4.01 Contract Times
A. The Work is required to be substantially complete within _______________ days after the date when the Contract Times commence to run as provided in the General Conditions and complete and ready for final payment in accordance with the General Conditions within
_______________ days after the date of Substantial Completion.
B. Milestones, the dates for completion of each, and associated liquidated damages are as defined in Section 01 35 00 �Special Procedures.�
C. Critical Operations, maximum time out of service, and associated liquidated damages are as defined in Section 01 35 00 �Special Procedures.�
4.02 Liquidated Damages
A. Owner and Contractor recognize that the Contract Times specified for Substantial
Completion and Final Completion are of the essence in the Contract. Owner and Contractor
Agreement 00 52 13 - 2 recognize that the Owner will suffer financial loss if the Work is not completed within the
Contract Times specified in this Agreement as may be adjusted in accordance with the
General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed within the Contract Times. Accordingly, instead of requiring proof of the amount of these damages, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Contractor agrees to pay Owner $500 for each day that expires after the time specified in this Agreement for Substantial Completion until the Work is substantially complete.
2. Contractor agrees to pay Owner $500 for each day that expires after the time specified in this Agreement for Final Completion until the Work is completed and ready for final payment in accordance with the General Conditions.
B. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently.
C. OPT will determine whether the Work has been completed within the Contract Times.
Assessment of liquidated damages by the Owner does not waive the Owner�s right to assess or collect additional damages which the Owner may sustain by the failure of the
Contractor to perform in accordance with the terms of the Contract.
ARTICLE 5 � CONTRACT PRICE
5.01 Owner will pay Contractor for completion of the Work in accordance with the Contract
Documents at the prices shown in this Agreement. The Contract Price has been computed in accordance with the General Conditions. Contractor acknowledges that for unit price items, estimated quantities are not guaranteed and are solely for the purpose of comparing Bids, and that final payment will be based on actual quantities determined in accordance with the
Contract Documents.
ARTICLE 6 � PAYMENT PROCEDURES