This is a specification and bidding document issued by the City of Glendale Public Works Department for the Glendale Fire Station Roll-up Door Replacement Project. The project encompasses the provision and installation of 42 new high-speed spiral roll-up door systems across 7 fire stations and 10 new industrial roll-up door systems across 2 fire stations, along with associated maintenance programs. Contractor must also provide a 5-year preventative maintenance program and a 5-year maintenance and service agreement. A mandatory pre-bid job walk is scheduled for Monday, August 24, 2026, at 9:00 a.m. at Glendale Fire Station 28, with attendance required by RSVP prior to 4:00 p.m. on August 21st. Sealed bids are due before 2:00 p.m. on Wednesday, September 23, 2026, submitted to the City Clerk's office at 613 E. Broadway, Room 110, Glendale, California 91206, with bid opening scheduled for the same date and time at City Council Chambers. The contract time for substantial completion is 270 calendar days from the Notice to Proceed, with an additional 30 calendar days permitted for final completion. The project is subject to prevailing wage requirements under California Labor Code Section 1720 and the Davis-Bacon Act.

Bidders must submit bid security equal to 10 percent of the total maximum bid amount and must demonstrate satisfactory completion of at least three prevailing wage public contracts in California within five years prior to bid deadline, each with a comparable scope and scale and dollar value exceeding the submitted bid. The successful bidder must possess a current and active California General "B" contractor license and "C-61/D-28" Limited Specialty license. Liquidated damages are assessed at $5,200 per calendar day for failure to achieve substantial completion within the contract time. The City reserves the right to reject any and all bids, award all or any individual part or item, and determine the lowest responsible bidder. Contractor must obtain and maintain comprehensive insurance coverage including workers' compensation, commercial general liability of $1,000,000 per occurrence with $2,000,000 general aggregate, and business automobile liability of $1,000,000 per occurrence, with the City named as an additional insured. All work is subject to compliance with California Department of Industrial Relations Public Works Contractor Registration requirements and electronic certified payroll record submissions to the Labor Commissioner.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Glendale Fire Station Roll-up Door Replacement Project

SPECIFICATION NO. 4053

CITY OF GLENDALE, CALIFORNIA

ISSUED TO BID

August 5, 2026

Contact: Celina Minas, Project Manager Address: 633 E. Broadway, Room 205, Glendale, CA 91206 Phone: 818-937-8305 E-mail: cminas@glendaleca.gov i

TABLE OF CONTENTS

Project Directory ..............................................................................................................................................D-1

Notice Inviting Bids.............................................................................................................................................NB-1

Instructions to Bidders........................................................................................................................................IB-1

Bid Forms:

Bidder’s Proposal .................................................................................................................................F-1

Schedule of Bid Prices .........................................................................................................................F-6

Incumbency Certificate ........................................................................................................................F-11

Bid Bond ..............................................................................................................................................F-12

Bidder’s Statement of Qualifications ....................................................................................................F-15

Experience Form .................................................................................................................................F-26

Contractor Safety Questionnaire ..........................................................................................................F-27

Designation of Subcontractors .............................................................................................................F-32

Contractor’s Declaration of Noncollusion .............................................................................................F-36

Insurance Requirements Affidavit ........................................................................................................F-37

Standard Form of Contract .................................................................................................................................FA-1

Exhibits to Contract:

Index of Drawings, Specifications, and Reference Documents……………………………... .................Exhibit 1

Insurance Requirements ......................................................................................................................Exhibit 2

Baseline Project Schedule ...................................................................................................................Exhibit 3

Preliminary Schedule of Values ...........................................................................................................Exhibit 4

Contractor’s Certification under Labor Code § 1861 of Labor Code § 3700 Compliance .................................Exhibit 5

Payment Items .....................................................................................................................................Exhibit 6

General Conditions

Article 1 - Preliminary Provisions ....................................................................................................GC-1

Article 2 - Performance of the Work ...............................................................................................GC-13

Article 3 - Time of Commencement and Completion ......................................................................GC-28

Article 4 - Construction Schedules .................................................................................................GC-32

Article 5 - Suspension or Termination of Contract ..........................................................................GC-35

Article 6 - Changes .........................................................................................................................GC-41

Article 7 - Contract Payments and Claims ......................................................................................GC-50

Article 8 - Materials and Equipment ................................................................................................GC-63

Article 9 - Submittals.......................................................................................................................GC-66 ii

Article 10 - Safety .............................................................................................................................GC-71

Article 11 - Indemnity ........................................................................................................................GC-76

Article 12 - Insurance........................................................................................................................GC-78

Article 13 - Bonds .............................................................................................................................GC-79

Article 14 - Labor Provisions .............................................................................................................GC-81

Article 15 - Dispute Resolution .........................................................................................................GC-86

Article 16 - Accounting Records .......................................................................................................GC-91

Article 17 - Miscellaneous Provisions ...............................................................................................GC-92

Special Conditions

Section 1 - Scope and Control of Work ............................................................................................SC-2

Section 2 - Responsibility of Contractor ...........................................................................................SC-4

Section 3 - Phasing ..........................................................................................................................SC-5

Section 4 - Execution........................................................................................................................SC-6

Appendices

Performance Bond ............................................................................................................................. Appendix 1

Payment Bond ................................................................................................................................... Appendix 2

Notice to Proceed .............................................................................................................................. Appendix 3

Change Order .................................................................................................................................... Appendix 4

Substitution Form ............................................................................................................................... Appendix 5

Statutory Forms of Waiver and Release Upon Payment ................................................................... Appendix 6

DAS Form 140 ................................................................................................................................... Appendix 7

DAS Form 142 ................................................................................................................................... Appendix 8

DLSE Form PW26 ............................................................................................................................. Appendix 9

PROJECT DIRECTORY

D-1

PROJECT DIRECTORY

OWNER: City of Glendale Public Works Department - Engineering Division

633 E. Broadway, Room 205 Glendale, CA 91206

Contact: Celina Minas, Project Manager Tel: 818-937-8305

Cell: 818-792-6349

CONSULTANTS

Architect:

Name of Firm: IDS Group Inc.

Address: 1 Peters Canyon Road, Suite 130

Irvine, CA 92606 Attention: Amit Bhargava

Phone: (949) 387-8500 E-Mail: amit.bhargava@idsgi.com

NOTICE INVITING BIDS

NB-1

NOTICE INVITING BIDS

NOTICE is hereby given that the City of Glendale (“City”) will receive sealed Bids, before the Bid Deadline established below for the following work of improvement:

Bid Deadline: Submit before 2:00 p.m. on Wednesday, September 23, 2026 (“the Bid Deadline”)

Original plus two (2) copies of Bid to be submitted to:

Office of City Clerk 613 E. Broadway, Room 110

Bid Opening: 2:00 p.m. on Wednesday September 23, 2026 City Council Chambers 613 E. Broadway, 2nd Floor

NO LATE BIDS WILL BE ACCEPTED.

Bidding Documents Available: August 5, 2026 on City of Glendale Website:

https://www.glendaleca.gov/government/departments/finance/purchasing/rfp-rfq-bid-page

Mandatory Pre-Bid Job Walk: Date: Monday, August 24, 2026

Time: 9:00 am Location: Glendale Fire Station 28 4410 New York Ave, Glendale, Glendale, CA 91214

Note:

• All Contractors planning to attend the mandatory pre-bid job walk on August 24th shall RSVP prior to 4 pm on August 21st by email to cminas@glendaleca.gov or by calling (818) 937-8305.

City of Glendale Contact Person: Celina Minas, Project Manager Phone: 818-937-8305

NOTICE INVITING BIDS

NB-2

Mandatory Qualifications for Bidder and Designated Subcontractors:

A Bid may be rejected as non-responsive if the Bid fails to document that Bidder meets the essential requirements for qualification. As part of the Bidder’s Statement of Qualifications, each Bid must provide satisfactory evidence that:

Bidder: satisfactorily completed at least Three ( 3 ) prevailing wage public contracts in California; each comparable in scope and scale to this Project, within Five ( 5 ) years prior to the Bid Deadline and with a dollar value in excess of the Bid submitted for this Project.

General Scope of Work: Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work in the Bid is defined in the Project Specifications and will generally include, but not limited to:

• Provide and install (42) new high-speed spiral roll-up door systems. (At 7 fire stations)

• Provide and install (10) new industrial roll-up door systems. (At 2 fire stations)

• Provide a 5-year preventative maintenance program

• Provide a 5-year maintenance and service agreement

Other Bidding Information:

1. Bidding Documents: Bids must be made on the Bidder’s Proposal form contained herein. Bidding Documents may be obtained by visiting City of Glendale’s website.

2. Completion: This Work must be completed within 270 calendar days from the Date of Commencement as established by the City’s written Notice to Proceed.

3. Acceptance or Rejection of Bids. The City reserves the right to reject any and all Bids, to award all or any individual part/item of the Bid, and to waive any informalities, irregularities or technical defects in such Bids and determine the lowest responsible Bidder, whichever may be in the best interests of the City. No late Bids will be accepted, nor will any oral, facsimile or electronic Bids be accepted by the City.

4. Mandatory Pre-Bid Job Walk. A mandatory pre-bid job walk will be held at the project site at 9 a.m. on Monday, August 24th at Fire Station 28 at 4410 New York Ave., Glendale, CA 91214.

5. Contractors License. At the time of the Bid Deadline and at all times during performance of the Work, including full completion of all corrective work during the Correction Period, the Contractor must possess a California contractor license or licenses, current and active, of the classification required for the Work, in accordance with the provisions of Chapter 9, Division 3, Section 7000 et seq. of the Business and Professions Code. In compliance with Public Contract Code Section 3300, the City has determined that the Bidder must possess the following license(s): General “B” and “C-61/D-28” Limited Specialty license. The successful Bidder will not receive a Contract award if the successful Bidder is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active. If the City discovers after the Contract’s award that the Contractor is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active, the City may cancel the award, reject the Bid, declare the Bid Bond as forfeited, keep the Bid Bond’s proceeds, and exercise any one or more of the remedies in the Contract Documents.

6. Subcontractors’ Licenses and Listing. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor must possess a current and active California contractor license or licenses appropriate for the portion of the Work listed for such Subcontractor and shall hold all specialty

NOTICE INVITING BIDS

NB-3

certifications required for such Work. When the Bidder submits its Bid to the City, the Bidder must list each Subcontractor whom the Bidder must disclose under Public Contract Code Section 4104 (Subcontractor Listing Law), and the Bidder must provide all of the Subcontractor information that Section 4104 requires (name, the location (address) of the Subcontractor’s place of business, California Contractor license number, California Department of Industrial Relations contractor registration number, and portion of the Work). In addition, the City requires that the Bidder list the dollar value of each Subcontractor’s labor or services. The City’s disqualification of a Subcontractor does not disqualify a Bidder. However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an adjustment of the Bid Amount.

7. Permits, Inspections, Plan Checks, Governmental Approvals, Utility Fees and Similar Authorizations:

The City has applied and paid for the following Governmental Approvals and Utility Fees:

City of Glendale Building Permits and Inspections

8. All other Governmental Approvals and Utility Fees shall be obtained and paid for by Contractor and will be reimbursed based on Contractor’s actual direct cost without markup. See Instructions to Bidders Paragraph 14, and General Conditions Paragraph 1.01 for definitions and Paragraph 1.03 for Contractor responsibilities.

9. Bid Forms and Bid Security: Each Bid must be made on the Bid Forms obtainable at the Public Works Facilities Management Division. Each Bid shall be accompanied by a cashier’s check or certified check drawn on a solvent bank, payable to “City of Glendale,” for an amount equal to ten percent (10%) of the total maximum amount of the Bid. Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%) of the total maximum amount of the Bid may accompany the Bid.

Said security shall serve as a guarantee that the successful Bidder, within fourteen (14) calendar days after the City’s Notice of Award of the Contract, will enter into a valid contract with the City for said Work in accordance with the Contract Documents.

10. Bid Irrevocability. Bids shall remain open and valid for ninety (90) calendar days after the Bid Deadline.

11. Substitution of Securities. Pursuant to California Public Contract Code Section 22300, substitution of securities for withheld funds is permitted in accordance therewith.

12. Prevailing Wages. This Project is subject to the provisions of California Labor Code Section 1720.

Contractor awarded this Contract and all Subcontractors of any tier shall not pay less than the minimum prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Work. The Director of Industrial Relations of the State of California, pursuant to the California Labor Code, and the United States Secretary of Labor, pursuant to the Davis-Bacon Act, have determined the general prevailing rates of wages in the locality in which the Work is to be performed. The rates determined by the California Director of Industrial Relations are available online at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Davis-Bacon wage rates are included in these Specifications and are also available online at https://sam.gov/wage-determinations. To the extent that there are any differences between the applicable federal and state prevailing wage rates for similar labor classifications, the Contractor and its Subcontractors shall pay the higher wage rate. California Department of Industrial Relations ― Public Works Contractor Registration.

Beginning July 1, 2014, under the Public Works Contractor Registration Law, California Senate Bill No. 854 and Labor Code Section 1725.5, contractors and subcontractors must be registered with the California Department of Industrial Relations and meet all applicable registration requirements before bidding on or performing public works contracts in California. Contractors and subcontractors may register or renew their registration through the DIR Public Works Website Services portal at https://services.dir.ca.gov/pw. Additional registration information is available at https://www.dir.ca.gov/Public-Works/Contractor-Registration.html. The

NOTICE INVITING BIDS

NB-4

application also provides agencies that administer public works programs with a searchable database of qualified contractors. Contractors and subcontractors may register or renew for one, two, or three fiscal years for a fee of $400, $800, or $1,200, respectively. A fiscal-year registration runs from July 1 through June 30.

Additional information regarding the Public Works Contractor Registration Law and California public works requirements is available at:

https://www.dir.ca.gov/Public-Works/PublicWorksSB854.html https://www.dir.ca.gov/Public-Works/PublicWorks.html

Beginning April 1, 2015, the City must award public works projects only to contractors and subcontractors who comply with the Public Works Contractor Registration Law.

Notice to Bidders and Subcontractors:

• No contractor or subcontractor may be listed on a Bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

• No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

• This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

• The prime contractor must post job site notices prescribed by regulation. (See 8 Calif. Code Reg. Section 16451(d) for the notice that previously was required for projects monitored by the DIR Compliance Monitoring Unit.)

Furnishing of Electronic Certified Payroll Records to Labor Commissioner. For all new projects awarded on or after April 1, 2015, contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement).

Dated this _______ day of ________________, 2026, City of Glendale, California.

Dr. Suzie Abajian, City Clerk of the City of Glendale

INSTRUCTIONS TO BIDDERS

IB-1

1. CONTRACTOR LICENSE

The Bidder must possess the valid State of California Contractor License(s) in the classification(s) specified in the Notice Inviting Bids at the time of the Bid Deadline and at all times during the performance of the Work, except as otherwise provided in California Business and Professions Code Section 7028.15.

2. INTERPRETATION OF BIDDING DOCUMENTS, SPECIFICATIONS AND ADDENDA

A. If any Bidder contemplating submitting a Bid is in doubt as to the true meaning of any part of the

Bidding Documents, or who finds discrepancies, errors or omissions therein or who finds variances in any of the Bidding Documents with applicable law, such Bidder shall at once submit a written request for an interpretation or correction thereof to the City’s representative identified in the Notice Inviting Bids, or other designated individual. All Bidders shall submit such written requests to City, preferably on the Bidder’s Question Form provided at the end of these Instructions to Bidders, not less than five (5) working days prior to the Bid Deadline. The person or entity submitting the request shall be responsible for its prompt delivery to City’s Contact Person identified in the Notice Inviting Bids. Any interpretation or correction will be made only by Addendum issued by the City and a copy of such Addendum will be delivered to all Interested Bidders of record, as defined in Paragraph 3 below. Any Addenda so issued must be acknowledged in the Bid and the cost of performing Work described in the Addenda shall be included in the Bid. Bidder’s failure to acknowledge receipt of all Addenda may result in rejection of the Bid as nonresponsive. No person is authorized to render an oral interpretation or correction of any Bidding Documents and no Bidder may rely on any such oral interpretation or correction issued by the City. The City shall not be responsible for any other explanation or interpretation of the Drawings or Specifications, or for any oral instructions. City reserves the right to extend the Bid Deadline by issuing an Addendum to Interested Bidders no later than 72 hours prior to the Bid Deadline. Bidders shall use complete sets of Bidding Documents in preparing Bids; City shall not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

B. Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose. Each Bidder shall ascertain prior to submitting a Bid that the Bidder has received all Addenda issued and the Bidder shall acknowledge their receipt in the Bid.

3. OBTAINING DRAWINGS AND DOCUMENTS

Bidder may secure Bidding Documents ONLY from the location specified in the Notice Inviting Bids. City will maintain a list of persons who obtained a copy of these Specifications and who attend and sign in at the Mandatory Pre-Bid Conference and Job Walk (“Interested Bidders”). Only Interested Bidders will receive Addenda, if so issued.

4. BID FORMS – SUBMITTAL

A. The Bids shall be made on the forms provided herein with all blank spaces properly filled in. All forms required to be submitted with the Bid are listed in the Bid Proposal at page F-1.

B. The phraseology shall not be changed, and no additions shall be made to the items mentioned herein. Unauthorized conditions, exemptions, limitations, or provisions attached to a Bid will render it informal and may cause its rejection. All forms requiring specific information shall be completed

IB-2

with all applicable information for a Bid to be considered responsive. Special attention should be given to completing:

1. Bidder’s Statement of Qualifications;

2. Designation of Subcontractors

C. Include all Bid Forms, properly executed, and intact on forms provided. Enclose the Bid Forms in a sealed envelope; type or print on the envelope “BIDS for” followed by the title and Specification Number and the date and time of the Bid Deadline as they appear on the cover of this Specification book, and the Bidder’s name and address. The envelope may be mailed, hand delivered, or delivered by courier or package delivery service.

D. Bids hand delivered, delivered by courier or package delivery service shall be presented to:

City Clerk City of Glendale 613 E. Broadway, Room 110

E. Bids received after the Bid Deadline or at any place other than the Office of the City Clerk will not be considered.

5. BID FORMS – AUTHORIZED SIGNATURES

The Bidder shall sign the Bid Forms. If the Bid Forms are submitted by:

A. A Sole Proprietorship, the signature must be the full name of the individual, whose address must be given.

B. Partnership, it must be signed by each partner or accompanied by proof that the person(s) signing is/are authorized to bind the partnership. The name and address of the partnership and the address of person signing must be provided.

C. Corporation, it must be signed by an officer. The corporate name must be attested by the corporate seal. A signature other than a corporate officer’s will be accepted only if signature authority is conferred in the Incumbency Certificate submitted with the Bid.

D. A Limited Liability Company, it must be signed by the managing member(s), and the name and address of the limited liability company and the address of each person signing must be provided.

E. Joint Venture, it must be signed in accordance with A-D above, based on the applicable situation, and the names and address of the joint venture and the address of each person signing must be provided.

6. BID FORMS – SCHEDULE OF BID PRICES

A. The Bidder shall include in his/her Bid price(s) any and all expense or costs that may be necessary to complete the project in accordance with the requirements of the Contract.

B. The Bidder shall state for each item on the Schedule of Bid Prices form, in clearly legible figures, IB-3 the Base Bid, the alternates, and the unit price and item total or lump sum, as the case may be, for which he/she proposes to supply labor, materials, and equipment and to perform the Work. Bids must not contain any erasures, interlineations, strike-throughs or other corrections unless the same are suitably authenticated by affixing in the margin immediately opposite such erasure or correction the initials of the person(s) signing the Bid. If any Bid, or portions thereof, is determined by the City to be illegible, ambiguous, or inconsistent, City may reject such a Bid as being non-responsive.

C. In the case of a unit price item, the amount set forth, as the item total shall be the product of the estimated quantity times the unit price Bid. In the event of a discrepancy between the unit price Bid and the item total, the unit price shall prevail; however, if the unit price is ambiguous, unintelligible, or uncertain for any cause, or is omitted, or is the same amount as the entry for the item total, then the item total shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Where so indicated by the makeup of the Bid Form, sums shall be expressed in both words and figures, and in case of discrepancy between the two, the amount written in words shall govern.

D. Post Bid Interviews. The apparent low, second low, and third low Bidders may be asked to attend a Post Bid Interview to review the completeness and accuracy of their Bids and qualifications to perform the Work. Upon City’s request, such Bidders will be required to submit a detailed phasing plan, a Preliminary Schedule of Values for Payment equal to the Bid price, schedule of submittals, and confirmation of key personnel who will be dedicated to the Project for the duration of the Work.

The detailed phasing plan will be reviewed, and the qualifications of listed specialty contractors will be discussed. The Schedule of Values for Payment shall include separate line items for direct jobsite general conditions costs, field office overhead, and home office overhead and such other information as the City may require.

7. BID SECURITY

A. Each Bid shall be accompanied by cash or a cashier’s check or a certified check, drawn on a responsible bank doing business in the United States payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as a principal and a California admitted surety company (as defined by California Code of Civil Procedure Sections 995.120 and 995.311) as surety (“Bid Security”).

B. A Bid Bond must be issued by a California admitted surety insurer with the minimum A.M Best

Company Financial strength rating of “A:VII” or better. A Bid Bond issued by a California admitted surety not listed on Treasury Circular 570 will be deemed accepted unless specifically rejected by the City. A Bid Bond issued from an admitted surety insurer not listed in Treasury Circular 570 must be accompanied by all documents enumerated in California Code of Civil Procedure Section 995.660.

C. Bid Security shall be in an amount not less than 10% of the Base Bid. Any Bid submitted without

Bid Security will be rejected as non-responsive. The Bid Security shall be given as a guarantee that the successful Bidder shall execute the Construction Contract and shall provide the insurance, bonds and other required forms within fourteen (14) calendar days after the City’s Notice of Award of the Contract. Bidders will be entitled to return of Bid Security provided, however, that a successful Bidder will forfeit Bid Security in the event that the successful Bidder withdraws its Bid prior to the expiration of ninety (90) calendar days after the Bid Deadline; or attempts to withdraw its Bid when the requirements of Public Contract Code Section 5101 et seq. are not met; or refuses or fails to execute said Contract and provide the required bonds, insurance or certificates within fourteen (14) calendar days after the City’s Notice of Award of the Contract. In such event, if City awards the

IB-4

Contract for the Work to the next lowest responsible Bidder, the amount of the lowest responsible Bidder’s Bid Security shall be applied to the Contract Price differential between the lowest Bid and the second lowest Bid and the surplus, if any, will be returned to the lowest Bidder. If the City rejects all other Bids presented and re-advertises, the lowest Bidder’s Bid Security may be used to offset the City’s cost of re-advertising and receiving new Bids and the surplus, if any, will be returned to the lowest Bidder.

D. The Bid Security shall be held for ninety (90) calendar days after Bid Deadline or until posting by the successful Bidder of the payment and performance bonds, proof of insurance, return of executed copies of the Contract and necessary certification(s), whichever first occurs, at which time the Bid Security will be returned to all Bidders.

E. If a Bid Bond will be submitted, Bidder shall use the form entitled “Bid Bond” contained in the

Bidding Documents at page F-12, which Bid Bond must be properly executed and acknowledged by the Bidder and by a corporate surety authorized to transact such business in the State of California.

F. The Bid Bond must be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the Bid Bond is executed outside the State of California, all copies of the bond must be countersigned by a California representative of the surety. The signature of the person executing the bond on behalf of Surety must be acknowledged by a Notary Public as the signature of the person designated in the power of attorney.

G. Any alteration of the form of Bid Bond, or imperfection in the execution thereof, as herein required, will render it informal and may, at the option of the City, result in the rejection of the Bid under which the Bid Bond is submitted.

8. BIDDER’S AND SPECIALTY CONTRACTOR’S STATEMENT OF QUALIFICATIONS

A. Each Bidder shall be required to complete, execute and submit with its Bid, the form entitled

“Bidder’s Statement of Qualifications.” Notwithstanding the provisions of Paragraph 22 herein, the Bidder’s Statement of Qualifications and financial shall not be public records. All information required by a Bidder’s Statement of Qualifications shall be completely and fully provided. If no information is to be filled in a blank space, then write “none.” Any Bid not accompanied by a Bidder’s Statement of Qualifications form completed with all information required may render the Bid non-responsive. If the City determines that any information provided by a Bidder in the Bidder’s Statement of Qualifications is false or misleading or is incomplete so as to be false or misleading, the City may reject the Bid submitted by such Bidder as being non-responsive.

B. A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity, and experience to satisfactorily perform fully the requirements of the contract documents. In selecting the lowest responsible Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the work covered by the Bid including, but not limited to, the experience of the Bidder in construction of public buildings for public agencies. By submitting a Bid, each Bidder agrees that the City, in determining the successful Bidder and its eligibility for the award, may consider the Bidder’s experience with similar types of construction projects and facilities, conduct and performance under other contracts, financial condition, reputation in the industry, and other factors which could affect the Bidder’s performance of the work.

IB-5

C. In addition, if the Bidder intends to self-perform the electrical, HVAC, or structural/and seismic retrofit improvements Work, Bidder must satisfy the mandatory qualifications described in the Specialty Contractor’s Statement of Qualifications forms (starting at page F-30) applicable to such Work, and Bidder must submit the completed forms no later than 3:00 p.m. on the third Working Day following the Bid Deadline.

D. Subcontractors listed for the electrical, HVAC or structural/and seismic retrofit improvements Work must satisfy the mandatory qualifications described in the Specialty Contractor’s Statement of Qualifications forms applicable to the Work to be performed by each Subcontractor, and Bidder must submit the completed forms no later than 3:00 p.m. on the third Working Day following the Bid Deadline. Notwithstanding the provisions of Paragraph 22 of the Instructions to Bidders, the Bidder’s Statement of Qualifications and financial statements and the Specialty Contractor’s Statement of Qualifications shall not be public records. All information required by a Bidder’s Statement of Qualifications or Specialty Contractor’s Statement of Qualifications shall be completely and fully provided. If no information is to be filled in a blank space, then write “none.”

Any Bid not accompanied by a Bidder’s Statement of Qualifications and not followed by submission of Specialty Contractor’s Statement of Qualifications no later than 3:00 p.m. on the third Working Day following the Bid Deadline completed with all information required may render the Bid non-responsive. If the City determines that any information provided by a Bidder in the Bidder’s or Specialty Contractor’s Statement of Qualifications is false or misleading, or is incomplete so as to be false or misleading, the City may reject the Bid submitted by such Bidder as being non-responsive.

E. Glendale Ordinance No. 5544 adds Chapter 4.14 to the Glendale Municipal Code, 1995, establishing standards of responsibility and grounds for debarment for contractors who bid on public works contracts. Chapter 4.14 applies to all contracts awarded by, executed by or entered into by the City. Each Bidder is advised that the standards of Chapter 4.14 will be strictly enforced by the City.

9. DESIGNATION OF SUBCONTRACTORS

A. Subcontractor Listing. On the Designation of Subcontractors form (page F-32), the Bidder shall list each Subcontractor whom the Bidder must disclose under the Subletting and Subcontracting Fair Practice Act, Public Contract Code Section 4104. The Bidder shall provide each Subcontractor’s name, identify the trade and type of work that the Subcontractor will perform, state the location (address) of the Subcontractor’s place of business, and list the Subcontractor’s California Contractor license number, and list the Subcontractor’s Department of Industrial Relations contractor registration number. In addition, on the form the Bidder shall list the dollar value of each Subcontractor’s labor or services. If additive Alternate Bid Items are included in the Bidding Documents, the Bidder shall identify each Subcontractor performing additive Alternate Bid Items, when such Work — or the combination of base Contract Work and Alternate Work — exceeds one-half of one percent of the total Bid Amount.

B. Subcontractors’ Licenses. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor must possess a current and active California Contractor license appropriate for the portion of the Work listed for such Subcontractor and shall hold all specialty certifications required for such Work. An inadvertent error in listing the California contractor license number of a listed Subcontractor shall not be grounds for filing a bid protest or grounds for considering the Bid nonresponsive if the corrected contractor license number is submitted to the City by the Bidder within 24 hours after bid opening and provided the corrected

IB-6

contractor license number corresponds to the submitted name and location for that listed Subcontractor.

C. Disqualification of a Subcontractor. The City has the right to review the suitability and qualifications of any Subcontractor proposed by the Bidder. As part of this review, the City may request a Bidder to submit additional information about one or more of the listed Subcontractors—including, but not limited to—an experience statement with pertinent information as to similar projects and other evidence of qualification for the Subcontractor. If requested, the Bidder shall provide the information to the City within the time specified in the City’s written request. After due investigation, if the City has reasonable objection to any proposed Subcontractor, the City may, before giving the notice of award, require the apparent successful Bidder to submit an acceptable substitute. The City’s disqualification of a Subcontractor does not disqualify a Bidder.

However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an adjustment of the Bid Price.

D. Work of Subcontractors. The organization or arrangement of the Specifications and Drawings do not limit the extent of the Work for the Contract Documents. Accordingly, all Bidders are encouraged to disseminate all of the Specifications, Drawings and other Contract Documents to all persons or entities submitting sub-bids to the Bidder. The omission of any portion or item of Work from the Bid or from sub-bids, which is reasonably inferable from the Contract Documents, will not be a basis for adjustment of the Contract Price or the Contract Time.

E. Ineligible Subcontractors. The successful Bidder is prohibited from performing Work on the Project with any Subcontractor who is ineligible to perform work on a public works project pursuant to California Labor Code Sections 1777.1 or 1777.7. In submitting its Bid, the Bidder certifies that it has investigated the eligibility of each and every listed Subcontractor and has determined that none is ineligible to perform work pursuant to the above code provisions.

10. CONTRACTOR’S NONCOLLUSION DECLARATION

Using the form provided by the City, the Bidder shall sign, under penalty of perjury, the Contractor’s Declaration of Noncollusion, certifying that the Bid is not the result of and has not been influenced by collusion. Bidder shall submit this form with its Bid. Any Bid made without such declaration or believed to be made in violation of the requirements set forth in the declaration form, may be rejected.

11. INSURANCE REQUIREMENTS AFFIDAVIT

The Bidder shall submit to its insurance company or insurance agent the Insurance Requirements in this Specification and the Contract Documents. The insurance company’s underwriter or agent must complete the Insurance Requirements Affidavit which states that the insurer’s underwriter or agent will furnish the City with the required insurance documents within five (5) calendar days after the City’s Notice of Award of the Contract. The Bidder shall submit this form with its Bid. Any Bid made without this affidavit, or made with an incomplete affidavit form, may be rejected.

12. EXAMINATION OF DRAWINGS, SPECIFICATIONS, AND SITE OF WORK

A. The Bidder shall carefully examine the site of the Work contemplated and the Drawings and

Specifications. The submission of a Bid will be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, IB-7 and quantities of Work to be performed and materials to be furnished, the difficulties to be encountered, and to the requirements of the Drawings, Specifications, and other Contract Documents. The Bidder shall ascertain the locations of the existing utility services, and other underground facilities, and to provide for carrying out his/her operations so as to cause the minimum possible inconvenience to the occupants of property along any streets affected. All Work and costs involved in the safeguarding of the property of others shall be at the expense of the Bidder to whom the Contract may be awarded.

B. The Bidder hereby certifies that he has examined the local conditions, has read each and every clause of the Contract Documents, and that he/she has included all costs necessary to complete the specified Work in his/her Bid prices, and the Bidder agrees that if he/she is awarded the Contract he/she will make no claim against the City based upon ignorance of local conditions or misunderstanding of any of the provisions of the Contract. Should the conditions turn out otherwise than anticipated by him/her, the Bidder agrees to assume all risks incident thereto.

13. PRICES AND PAYMENTS

Approximate quantities listed in the Notice to Contractors and quantities if listed for unit price items on the Bid Forms, are estimates given for comparing Bids, will be used to determine the lowest bid and for pricing changes to the Work. No claim shall be made against the City for excess or deficiency therein, actual or relative. Payment at the prices agreed upon will be in full for the completed Work and will cover materials, supplies, labor, tools, equipment, and all other expenditures incident to a satisfactory compliance with the Contract, unless otherwise specifically provided.

14. PERMIT FEES

Contractor shall be reimbursed for the actual direct cost of all Permit Fees, as defined in Paragraph 1.01 and addressed in 1.03 of the General Conditions. Bidder shall exclude the cost of Permit Fees from Bidder’s Base Bid sum and from Bid Alternate prices. The Base Bid sum and Bid Alternate prices shall include the cost of administration and coordination for all Governmental Approvals and Utility Fees.

15. SUBSTITUTIONS

No requests for substitution of any material, device, product, equipment, fixture, form, or type of construction shall be considered by City prior to award of the Contract. Bidders shall submit all requests for substitution and substantiating data, on “Substitution Form” (Appendix 5), within Three (3) calendar days from the date of the Notice to Proceed. Bidder shall refer to the appropriate provisions of the General Conditions for additional information regarding substitutions. Authorization of a substitution is solely within the discretion of the City.

16. RETURN OF IMPROPER BIDS

Bids submitted after the Bid Deadline are non-responsive and shall be returned to the Bidder unopened.

Oral, telephonic, telegraphic, facsimile or electronically transmitted Bids shall not be considered unless the Notice Inviting Bids expressly permits such means of transmittal.

17. WITHDRAWAL OF BIDS

Bidder may withdraw its Bid either personally or by written request any time prior to the scheduled Bid Deadline by notice to the City’s Contact Person designated in the Notice Inviting Bids. If such notice is

IB-8

written, it shall be signed by the Bidder and shall be date-stamped and time-stamped by the City upon receipt. Withdrawn Bids may be resubmitted before the Bid Deadline provided that they are in full conformance with these Instructions to Bidders. Once submitted, all Bids are irrevocable, except as otherwise provided by law. Requests for withdrawal of Bids after the Bid Deadline shall be made only in accordance with California Public Contract Code Sections 5100, et seq. Bidder agrees by submitting a Bid that such Bid shall remain open, is irrevocable, and may not be modified, withdrawn, or cancelled for a period of ninety (90) days after Bid Deadline.

18. OPENING AND EVALUATION OF BIDS

A. Bid Opening and Tabulation. The Bids shall be opened and read in public after the Bid Deadline has expired at the time and location listed in the Notice Inviting Bids. A tabulation of all Bids received will be available for public inspection at 633 E. Broadway, Room 205, Glendale, CA in the Public Works Engineering Department during regular business hours for a period of not less than thirty (30) calendar days following the Bid Deadline. The City reserves the right to accept or reject any or all Bids and be the sole judge regarding the suitability of the products, services or supplies offered; and/or to waive any irregularities or informalities in any Bids or in the bidding process. The City further reserves the right to purchase all or fewer than all items or quantities of each item listed in the Bidding Documents. The award of the Contract, if made by the City, shall be to the lowest responsive and responsible Bidder. If Bid Alternate Items are called for, the lowest Bid shall be determined according to Paragraph 20 below.

B. Evaluation of Bids

1. Mandatory Qualifications A Bid may be rejected as non-responsive if the Bidder fails to document in the Bid that Bidder meets the essential requirements for qualification described in the Notice Inviting Bids. As part of the Bidder’s Statement of Qualifications (in Section 3 EXPERIENCE, item 3.2), each Bidder must establish that Bidder has the required experience as set forth in the Mandatory Qualifications paragraph of the Notice Inviting Bids for this Project. The City’s disqualification of a Subcontractor listed for the Work does not disqualify a Bidder. However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor — without an adjustment of the Bid Price.

2. Responsive Bid. A responsive Bid is a Bid which conforms, in all material respects, to the

Bidding Documents.

3. Responsible Bidder. A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily perform fully the requirements of the Contract Documents.

4. Competency of Bidders. In selecting the lowest responsible Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the Work covered by the Bid including, but not limited to, the experience of the Bidder in construction of public works for public agencies. By submitting a Bid, each Bidder agrees that the City, in determining the successful Bidder and its eligibility for the award, may consider the Bidder’s experience with similar types of construction projects and facilities, conduct and performance under other contracts, financial condition, reputation in the industry, safety record and protocols and other factors which could affect the Bidder’s performance of the Work.

IB-9

19. AWARD OF CONTRACT

The City reserves the right to reject any or all Bids and to waive any or all information or technical defects, as the interest of the City may require. Award of Contract or rejection of Bids will be made by the City within ninety (90) calendar days following the Bid Deadline. City Council meetings are regularly scheduled on Tuesday evenings.

20. BASIS OF AWARD

A. A Contract will be awarded to the lowest responsive and responsible Bidder meeting all requirements set forth in these Bidding Documents.

City will determine the lowest Bid price based on the total of lowest Base Bid price and all Bid Alternate prices.

After the lowest responsive and responsible Bidder is determined, City reserves the right in its sole discretion to select any, all, or none of the Bid Alternates at the time of award of the Contract, regardless of whether such Bid Alternates were used in the analysis to determine the lowest Bid price.

B. In making the determination as to lowest responsive and responsible Bidder, the following criteria will apply:

1. Qualifications of Bidder: The Bidder shall be a qualified Bidder as required in this

Paragraph 18(B) and as otherwise required in the Contract Documents.

2. Responsive Bid: The Bidder’s Bid shall be responsive to the requirements of the Contract Documents. As stated elsewhere, the City reserves the right to waive any informalities or technical defects of the Bid as the best interests of the City may require.

21. EXECUTION OF CONTRACT

Within five (5) calendar days after the City’s Notice of Award of the Contract, Contractor shall deliver to the City the following documents:

A. Three (3) copies of the Contract in the form included herein, properly executed by Contractor and, if the Contractor is a corporation, evidence of its corporate existence and that the persons signing the Contract are authorized to do so. All signatures must be notarized.

B. Properly executed copies of the (a) Performance Bond and (b) Labor and Material (Payment) Bond in accordance with the requirements set forth in Article 13 of the General Conditions and in the form shown on Appendix 1 and 2 attached thereto. All signatures must be notarized.

C. Properly executed policies of (a) the Commercial General Liability Insurance, (b) the Automotive

Liability Insurance, (c) the Excess or Liability Insurance, (d) the Waiver of Subrogation Clause, (e) Professional Liability, if required, and (f) the corresponding endorsements for each policy in accordance with the requirements set forth in Article 12 of…