GLASS EDGE_STDF-2025-41_MSTD.pdf
PDF 764 KB Posted
- Attached to
- CN NE|45629
- Contract number
- 45629
- Issued by
- Nebraska
About this file
This document is a Unit Price Quotation from the University of Nebraska for a front door replacement project at the Lincoln Campus. The project is located in the Southeast region, with Glass Edge, a contractor based in Lincoln, NE, as the primary vendor. The quotation is identified by project number STDF-2025-41 and reference RFP No. 3900-24-7200, dated 5/20/2025.
The scope of work involves replacing existing aluminum door and hinge sets that have wind and weld compromises. The total quotation is $4,072.00, which includes $1,800.00 in direct labor costs, $2,272.00 in equipment and material costs, and no subcontractor costs. The project is scheduled to start on 8/20/2025 with an anticipated completion date of 10/14/2025, and is estimated to take 56 calendar days from the notice to proceed. The quotation covers labor, materials, and associated work for door and hardware replacement, with all existing glazing hardware to be re-used.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .