GLASS EDGE_STDF-2025-40_MSTD.pdf

PDF 751 KB Posted

Attached to
CN NE|45628
Contract number
45628
Issued by
Nebraska

About this file

This document is a Unit Price Quotation from the University of Nebraska for the Osborne Complex Overhead Door Stops project, located on the Lincoln Campus in the Southeast region. The project number is STDF-2025-40, and the contractor is Glass Edge, located at 8240 Cody Drive in Lincoln, Nebraska 68512. The quotation is dated 6/20/2025 and is associated with RFP No. 3900-24-7200.

The scope of work involves providing overhead door stops for existing doors to prevent damage when caught in the wind. The total quotation is $4,272.00, which includes $2,000.00 in direct labor costs (primarily administrative and supervisory), $2,272.00 in equipment and material costs, and no subcontractor costs. The project is estimated to start on 8/20/2025, with an anticipated completion date of 10/14/2025 and a 56-day completion timeline. The quotation includes an owner's protective bond option, though no additional cost is specified for the bond.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .