This is a final bid document from the Town of Glastonbury, Connecticut for Parker Terrace Wastewater Pumping Station Upgrades. The project involves the demolition of existing infrastructure and installation of new prefabricated concrete controls/electrical building, wastewater pumps, piping, valves, fittings, pump controls, exterior generator, electrical components, and site furnishings at 30 Parker Terrace, Glastonbury, Connecticut. The bid was advertised on July 8, 2026, with a bid due date of August 4, 2026 at 11:00 a.m. Bids are to be submitted online through the Town's e-Procurement portal at https://glastonburyct.bonfirehub.com/. The technical specifications are prepared by Weston & Sampson Engineers, Inc., who will serve as the Engineer and Owner's Project Representative. Bidders should direct technical questions to Jeff LeMay, Director of Wastewater, Refuse, and Recycling, at (860) 652-7774 or Jeff.LeMay@Glastonbury-CT.Gov, and administrative questions to Nicole Melquist, Purchasing Assistant, at (860) 652-7588 or purchasing@glastonbury-ct.gov.
The bid structure includes six line items: Parker Terrace Pumping Station (lump sum), By-Pass Pumping (lump sum), Allowance for Abatement of Contaminated Materials ($20,000), Allowance for Uniformed Officers/Traffic Control ($5,000), Allowance for Utility Company Work ($30,000), and Mobilization, Bonds and Insurance (not to exceed 5% of Items 1-5). Each bidder must submit a bid bond equal to 10% of the total bid amount within 24 hours of the virtual opening. The successful bidder must provide 100% performance and payment bonds in the full contract amount. Connecticut prevailing wage requirements apply, with wage rates and classifications detailed for both building construction and heavy/highway construction classifications, effective July 7, 2026. All workers on-site must comply with OSHA safety and health certification requirements completed within the past five years. The contractor must self-perform a minimum of 50% of the total contract value. Bidders must be qualified, responsible, and responsive, with references from three similar completed projects and disclosure of any past mediation, arbitration, or litigation cases from the previous five years. The project is exempt from federal excise taxes and Connecticut sales, use, and service taxes.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTON & SAMPSON ENGINEERS, INC.
712 Brook Street, Suite 103
Rocky Hill, CT 06067 tel: 860.513.1473 Technical
Specification
March 2026
TOWN OF
Glastonbury, CT
Parker Terrace Wastewater Pumping
Station Upgrades
Bid # GL-2027-09
100% Final Design
Advertised on: July 8, 2026
Bid Due Date: August 4, 2026
THIS PAGE LEFT INTENTIONALLY BLANK
PAGE i
Division
TABLE OF CONTENTS
Procurement and Contracting Requirements
Section
Number
00 Procurement and Contracting Requirements
Advertisement for Bid 00100
Instructions for Bidders 00200
Form for General Bid 00410
Connecticut Wage Rates 00500
Notice of Award 00510
Agreement 00520
Notice to Proceed 00550
Performance Bond 00610
Payment Bond 00615
General Conditions 00700
Supplementary Conditions 00800
Town of Glastonbury General Construction Specifications 00810
Town of Glastonbury Special Conditions 00820
Change Orders 00830
Permits 00890
General Requirements Subgroup
01 General Requirements
Measurement and Payment
Control of Work and Materials
01 02 50
01 11 00
Special Provisions 01 14 00
Dust Control 01 14 19.16
Submittals 01 33 23
Submittals for O&M Manuals 01 33 23.13
Health and Safety Plan 01 35 29
Structural Tests and Inspections 01 45 23
Temporary Facilities 01 52 13
Bypass Pumping 01 53 50
Signage (Traffic Control) 01 55 26.13
Temporary Chain Link Fence and Gate 01 56 26
Environmental Protection 01 57 19
Cleaning Up 01 74 13
Startup and Testing 01 75 00
Equipment Checkout and Testing 01 75 13
Project Closeout 01 78 00
Project As-Built Record Drawings 01 78 39
Operations and Maintenance Manuals 01 92 13
PAGE ii
Facility Construction Subgroup
02 Existing Conditions
Abandonment of Existing Sewers 02 41 13
Demolition 02 41 16
Transportation and Disposal of Contaminated Materials 02 61 00.16
03 Concrete
Cast-In-Place Concrete 03 30 00
05 Metals
Structural Steel 05 12 33
Miscellaneous Metals 05 50 00
07 Thermal and Moisture Protection
Vapor Retarders 07 26 00
09 Finishes
Painting 09 90 00
11 Equipment
General 11 00 00
13 Special Construction
Precast Concrete Structures and Appurtenances 13 20 00
Precast Concrete Utility Building 13 34 23.29
22 Plumbing
Plumbing General Conditions 22 05 00
Plumbing General-Duty Valves for Plumbing Piping 22 05 23
Identification for Plumbing Piping and Equipment 22 05 53
Plumbing Piping 22 10 05
Plumbing Piping Specialties 22 10 06
Natural Gas Piping 22 12 50
PAGE iv
23 Heating, Ventilation, Air Conditioning (HVAC)
Mechanical General Conditions 23 05 00
Sleeves and Sleeve Seals for HVAC Piping 23 05 17
Vibration and Seismic Controls for HVAC 23 05 48
Identification for HVAC Piping and Equipment 23 05 53
Testing, Adjusting, and Balancing for HVAC 23 05 93
HVAC Equipment Insulation 23 07 16
HVAC Piping Insulation 23 07 19
Direct-Digital Control System for HVAC 23 09 23
Sequence of Operations for HVAC Controls 23 09 93
Refrigerant Piping 23 23 00
Small-Capacity Split-System Air Conditioners 23 81 26.13
26 Electrical
Electrical General Conditions 26 05 00
Low-Voltage Electrical Power Conductors and Cables 26 05 19
Grounding and Bonding for Electrical Equipment 26 05 26
Hangers and Supports 26 05 29
Conduit for Electrical Equipment 26 05 33.13
Boxes for Electrical Equipment 26 05 33.16
Identification for Electrical
Equipment
26 05 53
Division
PAGE iii iv
Power System Studies 26 05 73
Wiring Connections 26 05 83
Lighting Control Devices 26 09 23
Low-Voltage Electrical Service Entrance 26 21 00
Low-Voltage Transformers 26 22 00
Switchboards 26 24 13
Panelboards 26 24 16
Wiring Devices 26 27 26
Fuses 26 28 13
Enclosed Switches 26 28 16.16
Variable Frequency Motor Controllers 26 29 23
Gas-Engine Genrator 26 32 13
Transfer Switches 26 36 00
Automatic Transfer Switch 26 36 23
Interior Lighting 26 51 00
Exterior Lighting 26 56 00
Site and Infrastructure Subgroup
31 Earthwork
Earthwork 31 00 00
Controlled Density Fill (CDF) 31 05 13.22
Filter Fabric 31 05 19.13
Clearing and Grubbing 31 11 00
Dewatering 31 23 19
Support of Excavation 31 50 00
32 Exterior Improvements
Paving 32 12 00
Curbing 32 16 00
Chain Link Fence 32 31 13.53
Loaming and Seeding 32 91 19
Plantings 32 93 00
33 Utilities
Tracer Tape 33 05 26.13
Ductile Iron Gravity and Force Main Pipe and Fittings for Sewers 33 31 13.19
Valves and Appurtenances for Wastewater Works 33 31 13.37
Connection to Existing Structures 33 31 13.46
Division
PAGE iii v
Process Equipment Subgroup
40 Process Integration
Process Piping and Fittings 40 05 13.53
Valves and Appurtenances (Wastewater Process) 40 05 23
Pipe and Equipment Support Systems 40 06 21
Field Instruments and Equipment 40 91 00
Instrumentation and Control General 40 93 00
Programmable Logic Controllers 40 94 43
Process Control Strategies 40 95 00
Control Panels 40 95 13
41 Material Processing and Handling Equipment
Monorail System with Electrified Hoist 41 22 23.19
43 Process Gas and Liquid Handling, Purification, and Storage
Equipment
Submersible Wastewater Pumping Equipment 43 21 39.16
Appendices:
END OF SECTION
SECTION 00100
ADVERTISEMENT FOR BIDS
TOWN OF GLASTONBURY
Office of the Purchasing Agent
DATE & TIME REQUIREDITEMBID #
Parker Terrace Wastewater Pumping StatioGL-2027-09 n Upgrades: August 4, 2026 at 11:00 A.M.
The Town of Glastonbury will receive on-line Bids for the Parker Terrace Wastewater Pumping Station
Upgrades project located at 30 Parker Terrace in Glastonbury, Connecticut. The modifications generally consist of the demolition of existing and installation of new prefabricated concrete controls/electrical building, wastewater pumps, piping, valves, fittings, pump controls, exterior generator, electrical, site furnishings and related work as indicated on the Contract documents.
Bidders wishing to submit a bid proposal for this solicitation are directed to respond online through a secure e-Procurement portal. Responses can be submitted at the following link:
https://glastonburyct.bonfirehub.com/, under the bid title “Parker Terrace Wastewater Pumping
Station Upgrades Bid# GL-2027-09”. All bids will be publicly opened and read aloud via an online Zoom platform. No late bids will be accepted.
This Invitation to Bid, Instructions to Bidders, Drawings, Specifications and other Bidding Documents (as defined in the Instruction to Bidders) are available for viewing and downloading on the Town of
Glastonbury website www.glastonburyct.gov at no cost.
Each Bid must be accompanied by a bid security in the form of a Bid Bond, certified in an amount not less than 10% of the base bid except as otherwise expressly provided in the Instruction to Bidders. The successful Bidder will be required to provide performance and labor and material payment bonds in the full amount of the agreed contract price.
Bidders are further advised that this project is subject to the prevailing wage requirements of Connecticut
General Statutes Section 31-53.
The Town of Glastonbury is An Affirmative Action/Equal Opportunity Employer. Minority/Women’s
Business Enterprises are encouraged to bid.
The Town reserves the right to amend or withdraw this Invitation to Bid for any reason, to accept or reject any or all Bids, to waive any informalities or non-material deficiencies in any Bid, and to make such award (or make no award) of a contract in connection with this Invitation to Bid all as determined by the Town, in its discretion, to be in the best interest of the Town. A Bid may be rejected for irregularities of any kind, including without limitation, alteration of form, additions not called for, conditional proposals, and incomplete Bids. A Bid may also be rejected if, in the opinion of the Town, the Bid does not meet the standard of quality established by the Bidding
Documents. Any or all Bids may be rejected if there is any reason to believe that collusion exists among two or more Bidders. The foregoing provisions are for illustrative purposes and shall in no way limit the right of the Town to reject any and all Bids, in whole or in part.
Gina Consiglio
Purchasing Agent
00100-1
00200-1
SECTION 00200
INSTRUCTIONS TO BIDDERS
1. Bidders submitting a response for this solicitation are directed to respond online through a secure e-Procurement portal. Bids can be submitted at the following link:
https://glastonburyct.bonfirehub.com/ under the bid title “Parker Terrace Wastewater
Pumping Station Upgrades Bid# GL-2027-09”. Bidders will be required to create a profile before submitting their bid. Step-by-step instructions on how to register as a vendor are available at this website:
https://customer.eunasolutions.com/public/s/article/vendor-registration
Bidders will be required to upload their bid response in one consolidated pdf document in the following location in the bid portal:
• Bid Response & Related Documents
2. Whenever it is deemed to be in the best interest of the Town, the Town Manager, Purchasing Agent or designated representative shall waive informalities in any and all bids.
The right is reserved to reject any bid when such action is deemed to be in the best interest of the Town of Glastonbury.
3. The award will be on the basis of bid total cost of the lowest qualified, responsible, and responsive Bidder unless otherwise specified. The bid total cost shall be arrived at by the mathematical calculation of the unit price multiplied times the number of units specified for each line item, and the total sum of all line items in the bid. In the event that the Town finds computational errors in a Bidder’s bid proposal, the bid total cost shall be recalculated by the Town based on the unit prices contained in the bid proposal.
4. All bids must be made on the required bid form. All blank spaces for prices must be typewritten, and the bid form must be fully completed and executed when submitted. Only one original of the bid form is required.
Bids must be made on the form furnished by the Town and attached hereto. If any unit price is omitted, the blank may be filled with the highest unit price proposed by any other
Bidder for such omitted item or the entire proposal may be rejected. In the event the unit price multiplied by quantity differs from the total cost specified for any given item, the unit cost shall govern.
5. Bids will be carefully evaluated as to conformance with stated specifications.
6. Specifications must be submitted complete in every detail and, when requested, samples shall be provided. If a bid involves any exception from stated specifications, they must be clearly noted as exceptions, underlined, and attached to the bid.
00200-2 clearly noted as exceptions, underlined, and attached to the bid.
7. The Contract Documents contain the provisions required for the requested item.
Information obtained from an officer, agent, or employee of the Town or any other person shall not affect the risks or obligations assumed by the Bidder or relieve him/her from fulfilling any of the conditions of the bid.
8. Each Bidder is held responsible for the examination and/or to have acquainted themselves with any conditions at the job site which would affect their work before submitting a bid.
Failure to meet this criteria shall not relieve the Bidder of the responsibility of completing the bid without extra cost to the Town of Glastonbury.
9. Any bid may be withdrawn prior to the above-scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No Bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why a bid cannot be awarded within the specified period, the time may be extended by mutual agreement between the Town and the Bidder.
10. Each electronic bid submission must be accompanied by a COPY of the bid bond payable to the Town for ten percent (10%) of the total amount of the bid. Original bid bonds from all Bidders must be mailed to the attention of the Purchasing Department immediately
(within 24 hours) following the virtual bid opening at the following address: Town of
Glastonbury, PO Box 6523, Glastonbury, CT 06033-6523, Attn: Purchasing Department.
The bid bond of the successful Bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned.
11. A 100% Performance and a 100% Payment bond are required of the successful Bidder.
This bond shall cover all aspects of the specification and shall be delivered to the
Purchasing Agent prior to the issuance of a Contract. The Performance and Payment Bond will be returned upon the delivery and acceptance of the bid items.
12. The Bidder agrees and warrants that in the submission of this sealed Bid, they will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religion, national origin, sex, or physical disability including, but not limited to blindness, unless it is shown by such Bidder that such disability prevents performance of that which must be done to successfully fulfill the terms of this sealed Bid or in any manner which is prohibited by the laws of the United States or the State of
Connecticut: and further agrees to provide the Connecticut Human Relations Commission with such information requested by the Commission concerning the employment practices and procedures of the Bidder. An Affirmative Action Statement will be required by the successful Bidder.
13. Bidder agrees to comply with all of the latest Federal and State Safety Standards and
Regulations and certifies that all work required in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the
Town for all damages assessed against the Town as a result of Bidder’s failure to comply
00200-3 with said standards and/or regulations.
14. All correspondence regarding any purchase made by the Town of Glastonbury shall reference the Town’s purchase order number. Each shipping container shall clearly indicate both Town purchase order number and item number.
15. Bidder is required to review the Town of Glastonbury Code of Ethics adopted July 8, 2003 and effective August 1, 2003 and revised October 29, 2013 and effective November 28, 2013. Bidder shall acknowledge that they have reviewed the document in the area provided on the bid/proposal response page (BP-1). The selected Bidder will also be required to complete and sign an Acknowledgement Form prior to award. The Code of Ethics and the
Acknowledgement Form can be accessed at the Town of Glastonbury website at www.glastonburyct.gov. Upon entering the website scroll down to click on Bids &
Proposals Icon which will bring you to the links for the Code of Ethics and the
Acknowledgement Form.
16. Non-Resident Contractors: (if applicable)
Upon award the Town is required to report names of nonresident (out of state) Contractors to the State of Connecticut, Department of Revenue Services (DRS) to ensure that
Employment Taxes and other applicable taxes are being paid by Contractors. A single surety bond for 5% of the entire contract price is required to be filed with DRS by any unverified nonresident prime or general contractor (if awarded) where the contract price for the project is $250,000 or more. The contractor will be required to promptly furnish to the Town a copy of the Form AU-968 - Certificate of Compliance issued by the State of Connecticut, DRS. See State of Connecticut Notice SN 2012 (2).
17. Bidder shall include on a sheet(s) attached to its proposal a complete disclosure of all past and pending mediation, arbitration and litigation cases that the Bidder or its principals
(regardless of their place of employment) have been involved in for the most recent five years. Please include a statement of the issues in dispute and their resolution. Acceptability of Bidder based upon this disclosure shall lie solely with the Town.
18. Bidder or its principals, regardless of their place of employment, shall not have been convicted of, nor entered any plea of guilty, or nolo contendere, or otherwise have been found civilly liable or criminally responsible for any criminal offense or civil action.
Bidder shall not be in violation of any State or local ethics standards or other offenses arising out of the submission of bids or proposals, or performance of work on public works projects or contracts.
19. State Prevailing Wage Rates:
Bidders shall comply with State Statutes concerning Employment and Labor Practices, if applicable, and Section 31-53 of the Connecticut General Statutes, as amended (Prevailing
Wages). Wage Rate Determination for this project from the State of Connecticut is included in the Bid Documents. Certified payrolls for site labor shall be submitted weekly to the Town’s Representative or his designee on the correct State of Connecticut form (see
RFP). The Town reserves the right to, without prior notice, audit payroll checks given to
00200-4 workers on site in order to ascertain that wages and fringe benefits are being paid as required by the State of Connecticut. Please make special note of the State requirement to adjust wage and fringe benefit rates on each July 1st following the original published rates.
NOTE that Bidder is to include in its proposal all costs required by such annual increases in the PREVAILING RATES. NO escalation clauses are to be included in the Bidder’s proposal and NO escalation clauses will be in the Contract Agreement. Bidder is to anticipate any future increases and include these costs in the proposal response.
Contractor’s invoices will not be paid if certified payrolls are incomplete, incorrect or not received in a timely manner.
All Apprentices must be registered with the State of Connecticut and their number shall not exceed the number allowed by law. Otherwise, all workers must be paid at least the
Journeyman rate listed including benefits.
OSHA SAFETY AND HEALTH CERTIFICATION
Effective July 1, 2009: Any Mechanic, Laborer, or Worker, who performs work in a classification listed on the prevailing wage rate schedule on any public works project covered under C.G.S. Section 31-53, both on site and on or in the public building, must have completed a federal OSHA Safety and Health course within the last 5 years.
20. Each bid shall also include a description of three similar (3) projects completed by the
Bidder with references to demonstrate successful experience with similar projects. Please provide project name, contact information and contract value in Qualifications for Bidders section of Bid Form.
21. Compliance with Town Ordinance Prohibiting Natural Gas Waste & Oil Waste From
Natural Gas Extraction Activities or Oil Extraction Activities: If this bid is for the construction, repair or maintenance of Town owned and/or maintained roads or real property within the Town related to either (a) the purchase or acquisition of materials by the Town to be used to construct, repair or maintain any Town owned and/or maintained road or real property within the Town or (b) the performance of services for the Town to construct, repair or maintain any Town owned and/or maintained road or real property within the Town, the Bidder shall provide the following signed statement to the Town in its bid response, which shall be a certification under penalty of perjury by the Bidder:
“The undersigned Bidder, ____________________________, hereby submits a bid for materials, equipment and/or services for the Town of Glastonbury. The bid is for bid documents titled “Parker Terrace Wastewater Pumping Station Upgrades Bid# GL-2027-
09”.
The undersigned Bidder hereby certifies under penalty of perjury that in connection with the bid and, if it is awarded the purchase order or contract by the Town, in connection with any purchase order or contract: (1) no materials containing natural gas waste or oil waste from natural gas extraction activities or oil extraction activities shall be provided to the
00200-5
Town or shall be used in providing any services to the Town by the undersigned Bidder or any contractor, sub-contractor or agent of the undersigned Bidder; (b) nor will the undersigned Bidder or any contractor, subcontractor or agent of the undersigned Bidder apply any natural gas waste or oil waste from natural gas extraction activities or oil extraction activities to any publicly owned and/or maintained road or real property within the Town of Glastonbury in performing its obligations under the purchase order or contract.
The undersigned Bidder hereby agrees and acknowledges that this requirement shall be a term of the purchase order or contract, if it awarded the purchase order or contract by the
Town, and any breach of this provision shall be a breach of the purchase order or contract.”
22. All Bidders are hereby made aware that the selected contractor shall self-perform a minimum of 50% of the total contract value with its own organization.
23. Engineer
The Engineer for this project is Weston and Sampson Engineers, Inc., 712 Brook Street, Suite 103, Rocky Hill CT 06067. All correspondence and submittals will be directed to the Engineer, who will act as the Owner’s Project Representative for this project, and shall be referenced in these contract documents by the words “ENGINEER”.
NOTE: Any technical questions regarding this bid shall be made in writing (email acceptable) and directed to Jeff Lemay Town of Glastonbury Director of
Wastewater, Refuse, and Recycling 2149 Main Street PO Box 6523
Glastonbury CT 06033-6523, Telephone: (860) 652-7774, e-mail
Jeff.LeMay@Glastonbury-CT.Gov between the hours of 8:00 a.m. – 4:30 p.m.
For administrative questions concerning this bid/proposal, please contact Nicole
Melquist, Purchasing Assistant, at (860) 652-7588 or email the Purchasing
Department at purchasing@glastonbury-ct.gov. All questions, answers, and/or addenda, as applicable, will be posted on the Town’s website at www.glastonbury-ct.gov (Upon entering the website scroll down to click on Bids & Proposals Icon, then scroll down page to see the active bid table. You must click the Bid Title to view all bid details and document links). The request must be received at least five
(5) business days prior to the advertised response deadline identified within the
Invitation to Bid. It is the Bidder’s responsibility to check the website for addenda prior to submission of any bid/proposal.
IMPORTANT:
• Failure to comply with general rules may result in disqualification of the Bidder.
• Municipal projects are exempt from Federal Excise Taxes, as well as, State of Connecticut
Sales, Use and Service Taxes and should not be include in the Bidder’s proposal.
00200-6
END OF SECTION
00410- 1
SECTION 00410
FORM OF GENERAL BID
TOWN OF GLASTONBURY
BID / PROPOSAL GL-2027-09
STATE PROJECT NO.
DATE ADVERTISED 7/8/2026 DATE / TIME DUE 8/4/2026 at
11:00 A.M.
NAME OF PROJECT Parker Terrace Wastewater Pumping Station Upgrades
It is the responsibility of the Bidder to clearly mark the outside of the bid envelope with the Bid
Number, Date and Time of Bid Opening, and it also THE RESPONSIBILITY OF THE BIDDER
TO CHECK THE TOWN’S WEBSITE BEFORE SUBMITTING BID FOR ADDENDA
POSTED PRIOR TO BID OPENING.
The Bidder acknowledges receipt of the following Addenda:
Addendum #1 ________________ (Initial & Date)
Addendum #2 ________________ (Initial & Date)
Addendum #3 ________________ (Initial & Date)
OTHER ITEMS REQUIRED WITH SUBMISSION OF BID PROPOSAL:
The following bid checklist describes items required for inclusion with the above-referenced bid proposal package. It is provided for the convenience of the Bidders and, therefore, should not be assumed to be a complete list.
_____ 1. Included a copy of the Bid Bond as per Section 10 of the Information for Bidders. Original
Bond to be mailed as specified herein.
_____ 2. Included Disclosure of Past and Pending Mediation, Arbitration, and Litigation cases against the Bidder or its Principals as per Section 17 of the Information for Bidders.
_____ 3. Included Qualifications Statement as per Section 20 of the Information for Bidders.
_____ 4. Included Certificate of Compliance with CGS 31-57B as per Section 22of the Information for Bidders.
_____ 5. Provided certification for Compliance with Town Ordinance Prohibiting Natural Gas
Waste & Oil Waste From Natural Gas Extraction Activities or Oil Extraction Activities as per Section 23 of the Information for Bidders
_____ 6. Checked Town web site for Addenda and acknowledged Addenda on page BP-1.
_____ 7. Acknowledged Code of Ethics on page 00410-4.
_____ 8. Prepared ONE consolidated pdf file for on-line bid submission.
BIDDER NAME:
00410- 2
Item
No.
Brief Description, Unit or Lump Sum Price
(In Both Words and Figures)
Parker Terrace Wastewater Pumping Station
Upgrades
Est.
Quantity(1) Unit Total in Figures
Parker Terrace Pumping Station-Complete
1 LS
Unit Price, Dollars and Cents (words)
Unit Price in Figures
By-Pass Pumping - Complete
Allowance for Abatement of Contaminated
Materials
Twenty Thousand 1 Allow.
$20,000.00
Unit Price in Figures
Allowance for Uniformed Officers / Traffic
Control
Ten Thousand 1 Allow.
$5,000.00
Unit Price in Figures
Allowance for Utility Company Work
Thirty Thousand 1 Allow.
Unit Price, Dollars and Cents (words)
$30,000.00
00410- 3
Item
No.
Brief Description, Unit or Lump Sum Price
(In Both Words and Figures)
Parker Terrace Wastewater Pumping
Station Upgrades
Est.
Quantity(1) Unit Total in Figures
Mobilization, Bonds and Insurance (not more than 5% of the total of Items 1 through 5), Lump
Sum
Total Bid in Figures
Contract price for the Project Bid (Items 1 through 6) is:
Total Bid, Dollars and Cents (words)
TOTAL BID AMOUNT: $
(Numeric)
WRITTEN TOTAL BID AMOUNT:
00410-4
CODE OF ETHICS:
I/We have reviewed a copy of the Town of Glastonbury’s Code of Ethics and agree to submit a Consultant Acknowledgement Form if I/We are selected. Yes No *
*Bidder is advised that effective August 1, 2003, the Town of Glastonbury cannot consider any bid or proposal where the Bidder has not agreed to the above statement.
NON-COLLUSION AFFIDAVIT:
By submission of this bid, the Bidder certifies, and in the case of a joint bid each party thereto certifies as to their own organization that this bid has been arrived at independently without consultation, communication, or agreement as to any matter relating to this bid with any other Bidder or with any competitor.
Respectfully submitted:
Type or Print Name of Individual Doing Business as (Trade Name)
Signature of Individual Street Address
Title City, State, Zip Code
Date Telephone Number/Fax Number
E-Mail Address SS# or TIN#
(Seal – If bid is by a Corporation)
Attest
00500 - 1
SECTION 00500
STATE OF CONNECTICUT WAGE RATES
CLASSIFICATION Hourly Rate Benefits
Parker Terrace Wastewater Pumping Station UpgradesProject:
Minimum Rates and Classifications for Building Construction
ID#:
By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established. Any contractor or subcontractor not obligated by agreement to pay to the welfare and pension fund shall pay this amount to each employee as part of his/her hourly wages.
Project Number:
State#:
Project:
FAP#:
Project Town:
Parker Terrace Wastewater Pumping Station Upgrades
Glastonbury
Connecticut Department of Labor Wage and Workplace Standards Division
26-6425
1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal and encapsulation (except its removal from mechanical systems which are not to be scrapped), toxic waste removers, blasters.**See Laborers Group 7**
1c) Asbestos Worker/Heat and Frost Insulator 50.16 35.30
2) Boilermaker 50.21 30.01
3a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), Stone Masons
45.76 38.45 + a
3b) Tile Setter 43.0 34.75
3c) Tile and Stone Finishers 36.0 29.43
3d) Marble & Terrazzo Finishers 35.7 29.73
3e) Plasterer 44.52 29.63
As of: July 7, 2026
3f) Terrazzo Mechanics & Marble Setters 40.6 39.93
------LABORERS------
4) Group 1: General laborers, carpenter tenders, concrete specialists, wrecking laborers and fire watchers.
37.0 30.47
4) Group 1a: Acetylene Burners (Hours worked with a torch) 38.0 30.47
4a) Group 2: Mortar mixers, plaster tender, power buggy operators, powdermen, fireproofer/mixer/nozzleman (Person running mixer and spraying fireproof only).
37.25 30.47
4b) Group 3: Jackhammer operators/pavement breaker, mason tender (brick), mason tender (cement/concrete), forklift operators and forklift operators (masonry).
37.5 30.47
4c) **Group 4: Pipelayers: Licensed P6 -P7 (one or two employees of the total crew who primary task is to perform mating of pipe sections).
38.0 30.47
4d) Group 5: Air track operator, sand blaster and hydraulic drills. 37.75 30.47
4e) Group 6: Blasters, nuclear and toxic waste removal. 40.0 30.47
4f) Group 7: Asbestos/lead removal and encapsulation (except it's removal from mechanical systems which are not to be scrapped).
40.0 30.47
4g) Group 8: Bottom men on open air caisson, cylindrical work and boring crew.
37.5 30.47
4h) Group 9: Top men on open air caisson, cylindrical work and boring crew. 37.0 30.47
4i) Group 10: Traffic Control Signalman 22.2 30.47
4j) Group 11: Toxic Waste Removers A or B With PPE 40.0 30.47
5) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation, Form Work and Scaffold Building, Drywall Hanging, Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient Floor Layers.
44.48 29.74
5a) Millwrights 45.14 30.24
5b) Carpenter - Welder 44.98 29.74
5c) Carpenter: Working with creosote lumber or acid 45.48 29.74
6) Electrical Worker (including low voltage wiring) (Trade License required:
E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)
50.25 37.47+3% of gross wage
7a) Elevator Mechanic (Trade License required: R-1,2,5,6) 69.55 38.985+a+b
-----OUTSIDE LINE CONSTRUCTION----
Groundman 32.1 13.95
Linemen/Cable Splicer 58.37 33.94
8) Glazier (Trade License required: FG-1,2) 44.73 27.65+ a
9) Ironworker, Ornamental, Reinforcing, Structural, and Precast Concrete Erection
45.25 46.62 + a
----OPERATORS----
Group 1: Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer (2 drums or over), Deep Shaft over 14". (Trade License Required)
60.66 30.95 + a
Group 1a: Front End Loader (7 cubic yards or over); Work Boat 26 ft. and Over
55.6 30.95 + a
Group 2: Cranes (100 ton rate capacity and over). (Trade License Required) 60.24 30.95 + a
Group 2a: Cranes (under 100 ton rated capacity), Magni Type-360 Rotating Forklift.
59.2 30.95 + a
Group 2b: Excavator over 2 cubic yards; Pile Driver ($3.00 premium when operator controls hammer), HF-1 Forklift, Drills with self contained power units, Micropile up to 14 inches helical pile.
55.17 30.95 + a
Group 3: Excavator; Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator; Bulldozer Finegrade. (slopes, shaping, laser or GPS, etc.). (Trade License Required)
54.13 30.95 + a
Group 4: Trenching Machines; Lighter Derrick; CMI Machine or Similar;
Koehring Loader (Skooper); Goldhofer.
53.61 30.95 + a
Group 5: Specialty Railroad Equipment; Asphalt Spreader, Asphalt Reclaiming Machine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder;
Well Digger; Milling Machine (over 24 mandrel).
52.78 30.95 + a
Group 5 continued: Side Boom; Combination Hoe and Loader; Directional Driller, Geothermal Drill.
52.78 30.95 + a
Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade dozer).
52.35 30.95 + a
Group 7: Asphalt Roller; Concrete Saws and Cutters (ride on types);
Vermeer Concrete Cutter; Stump Grinder; Scraper; Snooper; Skidder; Milling Machine (24" and under mandrel).
51.89 30.95 + a
Group 8: Mechanic; Grease Truck Operator; Hydroblaster; Barrier Mover;
Power Stone Spreader; Welding; Work Boat Under 26 ft.; Transfer Machine;
Rigger Foreman.
51.34 30.95 + a
Group 9: Front End Loader (under 3 cubic yards); Skid Steer Loader regardless of attachments; (Bobcat or Similar); Forklift, Power Chipper;
Landscape Equipment (including Hydroseeder); Vacuum Excavation Truck and Hydrovac Excavation Truck (27 HG pressure or greater).
50.74 30.95 + a
Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc. 47.91 30.95 + a
Group 11: Conveyor, earth roller, power pavement breaker (whiphammer), robot demolition equipment.
47.91 30.95 + a
Group 12: Wellpoint Operator. 47.82 30.95 + a
Group 13: Compressor Battery Operator. 47.04 30.95 + a
Group 14: Elevator Operator; Tow Motor Operator (solid tire no rough terrain). 45.45 30.95 + a
Group 15: Generator Operator; Compressor Operator; Pump Operator;
Welding Machine Operator; Heater Operator.
44.89 30.95 + a
Group 16: Maintenance Engineer and Articulating End Dump. 43.99 30.95 + a
Group 17: Portable Asphalt Plant Operator; Portable Crusher Plant Operator;
Portable Concrete Plant Operator; Portable Grout Plant Operator; Portable Water Filtration Plant Operator.
49.95 30.95 + a
Group 18: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper;
(Minimum for any job requiring a CDL license); Rigger; Signalman.
46.6 30.95 + a
Surveyor: Chief of Party 50.21 30.95 + a
Surveyor: Assistant Chief of Party 46.3 30.95 + a
Surveyor: Instrument Man 44.55 30.95 + a
Surveyor: Rodman or Chainman 38.34 30.95 + a
------PAINTERS (Including Drywall Finishing)------
10a) Brush and Roller 41.17 27.65
10b) Taping Only/Drywall Finishing 41.92 27.65
10c) Paperhanger and Red Label 41.67 27.65
10d) Spray 44.17 27.65
10e) Spray Helper 42.17 27.65
10f) Blast 46.17 27.65
10g) Blast Helper 42.17 27.65
11) Plumber (excluding HVAC pipe installation) (Trade License required: P-
1,2,6,7,8,9 J-1,2,3,4 SP-1,2)
52.08 36.80
12) Well Digger, Pile Testing Machine 37.26 24.05 + a
13) Roofer (composition) 45.85 23.99
14) Roofer (slate & tile) 46.35 23.99
15) Sheetmetal Worker (Trade License required for HVAC and Ductwork:
SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)
46.53 45.08
16) Pipefitter (Including HVAC work) (Trade License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G- 9)
52.08 36.80
------TRUCK DRIVERS------
17) Block Truck 39.98 33.00 + a
17a) 2 Axle 38.66 33.00 + a
17ab) Helpers 36.16 33.00 + a
17b) 3 Axle, 2 Axle Mixer 38.77 33.00 + a
17c) 3 Axle Mixer 38.83 33.00 + a
17d) 4 Axle 38.89 33.00 + a
17e) 4 Axle Mixer 40.69 33.00 + a
17ef) 5 Axle 38.89 33.00 + a
17eg) 5 Axle Mixer 40.69 33.00 + a
17f) Heavy Duty Trailer (40 Tons and Over) 41.16 33.00 + a
17g) Euclids and Semi-Trailer 38.94 33.00 + a
17h) Heavy Duty Trailer up to 40 tons 39.89 33.00 + a
17i) Snorkle Truck 39.04 33.00 + a
17j) Swivel Dump and Tack Truck 38.89 33.00 + a
18) Sprinkler Fitter (Trade License required: F-1,2,3,4) 56.78 35.24 + a
19) Theatrical Stage Journeyman 25.76 7.34
Welders: Rate for craft to which welding is incidental.
Surveyors: Hazardous material removal: $3.00 per hour premium.
*Note: Hazardous waste removal work receives additional $1.25 per hour for truck drivers.
**Note: Hazardous waste premium $3.00 per hour over classified rate.
Truck Drivers: Trainers Premium: $3.00 over wage rate.
Truck Drivers: Night Premium - Mixer Drivers: $2.00 over wage rate.
Crane with 150 ft. boom (including jib) - $1.50 extra
Crane with 200 ft. boom (including jib) - $2.50 extra
Crane with 250 ft. boom (including jib) - $5.00 extra
Crane with 300 ft. boom (including jib) - $7.00 extra
Crane with 400 ft. boom (including jib) - $10.00 extra
All classifications that indicate a percentage of the fringe benefits must be calculated at the percentage rate times the "base hourly rate".
Apprentices duly registered under the Commissioner of Labor's regulations on "Work Training Standards for Apprenticeship and Training Programs" Section 31-51-d-1 to 12, are allowed to be paid the appropriate percentage of the prevailing journeymen hourly base and the full fringe benefit rate, providing the work site ratio shall not be less than one full-time journeyperson instructing and supervising the work of each apprentice in a specific trade.
The Prevailing wage rates applicable to this project are subject to annual adjustments each July 1st for the duration of the project.
Each contractor shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor.
It is the contractor's responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor's website.
The annual adjustments will be posted on the Department of Labor's Web page:
www.ct.gov/dol. For those without internet access, please contact the division listed below.
The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project.
All subsequent annual adjustments will be posted on our Web Site for contractor access.
Contracting Agencies are under no obligation pursuant to State labor law to pay any increase due to the annual adjustment provision.
Effective October 1, 2005 - Public Act 05-50: any person performing the work of any mechanic, laborer, or worker shall be paid prevailing wage
All Person who perform work ON SITE must be paid prevailing wage for the appropriate mechanic, laborer, or worker classification.
All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership i.e.: (Owners, Corporate Officers, LLC Members, Independent Contractors, et.
al)
Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person.
~~Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clause (29 CFR 5.5 (a) (1) (ii)).
Please direct any questions which you may have pertaining to classification of work and payment of prevailing wages to the Wage and Workplace Standards Division, telephone (860)263-6790.
CLASSIFICATION Hourly Rate Benefits
Parker Terrace Wastewater Pumping Station UpgradesProject:
Minimum Rates and Classifications for Heavy/Highway Construction
ID#:
By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established. Any contractor or subcontractor not obligated by agreement to pay to the welfare and pension fund shall pay this amount to each employee as part of his/her hourly wages.
Project Number:
State#:
Project:
FAP#:
Project Town:
Parker Terrace Wastewater Pumping Station Upgrades
Glastonbury
Connecticut Department of Labor Wage and Workplace Standards Division
26-6425
1) Boilermaker 50.21 30.01
1a) Bricklayer, Cement Masons, Cement Finishers, Plasterers, Stone Masons 46.09 36.29
2) Carpenters, Piledrivermen 44.48 29.74
2a) Diver Tenders 44.48 29.74
2b) Divers Effluent 67.52 29.74
3) Divers 52.94 29.74
03a) Millwrights 45.14 30.24
03b) Carpenter-Welder 44.98 29.74
03c) Carpenter: Working with creosote lumber or acid 45.48 29.74
4) Painters: (Bridge Construction) Brush, Roller, Blasting (Sand, Water, etc.), Spray
61.85 27.65
4a) Painters: Brush and Roller 41.17 27.65
4b) Painters: Spray 44.17 27.65
4bc) Painters: Spray Helper 42.17 27.65
4c) Painters: Steel Only 43.17 27.65
4d) Painters: Blast 46.17 27.65
4de) Painter: Blast Helper 42.17 27.65
4e) Painters: Tanks, Tower and Swingstage etc. 43.17 27.65
4f) Elevated Tanks (60 feet and above) 50.17 27.65
5) Electrician (Trade License required: E-1,2 L-5,6 C-5,6 T-1,2 L-1,2 V- 1,2,7,8,9)
50.25 37.47+3% of gross wage
6) Ironworkers: Ornamental, Reinforcing, Structural, and Precast Concrete Erection
45.25 46.62 + a
7) Plumbers (Trade License required: (P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2) and Pipefitters (Including HVAC Work) (Trade License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4 G-1, G-2, G-8, G-9)
52.08 36.80
----LABORERS---- -
8) Group 1: General Laborers and concrete specialist 37.0 30.47
8) Group 1a: Acetylene Burners (Hours worked with a torch) 38.0 30.47
9) Group 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators, powdermen
37.25 30.47
10) Group 3: Pipelayers 37.5 30.47
11) Group 4: Jackhammer/Pavement breaker (handheld); mason tenders (cement/concrete), catch basin builders, asphalt rakers, air track operators, block paver, curb setter and forklift operators
37.5 30.47
12) Group 5: Toxic waste removal (non-mechanical systems) 39.0 30.47
13) Group 6: Blasters 38.75 30.47
Group 7: Asbestos/lead removal, non-mechanical systems (does not include leaded joint pipe)
40.0 30.47
Group 8: Traffic control signalmen 22.2 30.47
Group 9: Hydraulic Drills 37.75 30.47
Group 10: Toxic Waste Removers A or B With PPE 40.0 30.47
----LABORERS (TUNNEL CONSTRUCTION, FREE AIR). Shield Drive and Liner Plate Tunnels in Free Air.----
13a) Miners, Motormen, Mucking Machine Operators, Nozzle Men, Grout Men, Shaft & Tunnel Steel & Rodmen, Shield & Erector, Arm Operator, Cable Tenders
39.23 30.47 + a
13b) Brakemen, Trackmen, Miners' Helpers and all other men 38.26 30.47 + a
----CLEANING, CONCRETE AND CAULKING TUNNEL----
14) Concrete Workers, Form Movers, and Strippers 38.26 30.47 + a
15) Form Erectors 38.59 30.47 + a
----ROCK SHAFT LINING, CONCRETE, LINING OF SAME AND TUNNEL IN
FREE AIR:----
16) Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers, Miners Helpers 38.26 30.47 + a
17) Laborers Topside, Cage Tenders, Bellman 38.15 30.47 + a
18) Miners 39.23 30.47 + a
----TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: ---
18a) Blaster 45.72 30.47 + a
19) Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders
45.52 30.47 + a
20) Change House Attendants, Powder Watchmen, Top on Iron Bolts 43.54 30.47 + a
21) Mucking Machine Operator, Grout Boss, Track Boss 46.31 30.47 + a
----TRUCK DRIVERS----(*see note below)
Block Truck 39.98 33.00 + a
2 Axle 38.66 33.00 + a
Helpers 36.16 33.00 + a
Three Axle Trucks; Two Axle Mixer 38.77 33.00 + a
Three Axle Mixer 38.83 33.00 + a
Four Axle 38.89 33.00 + a
Four Axle Mixer 40.69 33.00 + a
5 Axle 38.89 33.00 + a
5 Axle Mixer 40.69 33.00 + a
Heavy Duty Trailer (40 tons and over) 41.16 33.00 + a
Heavy Duty Trailer (up to 40 tons) 39.89 33.00 + a
Snorkle Truck 39.04 33.00 + a
Swivel Dump and Tack Truck 38.89 33.00 + a
Euclids and Semi Trailer 38.94 33.00 + a
----POWER EQUIPMENT OPERATORS----
Group 1: Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer (2 drums or over), Caisson Drilled Shaft over 14". (Trade License Required)
60.66 30.95 + a
Group 1a: Front End Loader (7 cubic yards or over); Work Boat 26 ft. and over.
55.6 30.95 + a
Group 2: Cranes (100 ton rate capacity and over). (Trade License Required) 60.24 30.95 + a
Group 2a: Cranes (under 100 ton rated capacity), Magni Type-360 Rotating Forklift.
59.2 30.95 + a
Group 2b: Excavator over 2 cubic yards; Pile Driver ($3.00 premium when operator controls hammer), HF-1 Forklift, Drills with self contained power units, Micropile up to 14 inches helical pile.
55.17 30.95 + a
Group 3: Excavator; Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade (slopes, shaping, laser or GPS, etc.). (Trade License Required)
54.13 30.95 + a
Group 4: Trenching Machines; Lighter Derrick; CMI Machine or Similar;
Koehring Loader (Skooper), Goldhofer.
53.61 30.95 + a
Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt Spreader;
Asphalt Reclaiming Machine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder;
Well Digger; Milling Machine (over 24" mandrel)
52.78 30.95 + a
Group 5 continued: Side Boom; Combination Hoe and Loader; Directional Driller, Geothermal Drill.
52.78 30.95 + a
Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade dozer).
52.35 30.95 + a
Group 7: Asphalt Roller; Concrete Saws and Cutters (ride on types);
Vermeer Concrete Cutter; Stump Grinder; Scraper; Snooper; Skidder; Milling Machine (24" and under Mandrel)
51.89 30.95 + a
Group 8: Mechanic, Grease Truck Operator, Hydroblaster, Barrier Mover, Power Stone Spreader; Welder; Work Boat under 26 ft.; Transfer Machine, Rigger Foreman.
51.34 30.95 + a
Group 9: Front End Loader (under 3 cubic yards), Skid Steer Loader regardless of attachments (Bobcat or Similar); Fork Lift, Power Chipper;
Landscape Equipment (including hydroseeder), Vacuum Excavation Truck and Hydrovac Excavation Truck (27 HG pressure or greater).
50.74 30.95 + a
Group 10: Vibratory Hammer, Ice Machine, Diesel and Air Hammer, etc. 47.91 30.95 + a
Group 11: Conveyor, Earth Roller; Power Pavement Breaker (whiphammer), Robot Demolition Equipment.
47.91 30.95 + a
Group 12: Wellpoint Operator. 47.82 30.95 + a
Group 13: Compressor Battery Operator. 47.04 30.95 + a
Group 14: Elevator Operator; Tow Motor Operator (Solid Tire No Rough Terrain).
45.45 30.95 + a
Group 15: Generator Operator; Compressor Operator; Pump Operator;
Welding Machine Operator; Heater Operator.
44.89 30.95 + a
Group 16: Maintenance Engineer and Articulating End Dump. 43.99 30.95 + a
Group 17: Portable Asphalt Plant Operator; Portable Crusher Plant Operator;
Portable Concrete Plant Operator., Portable Grout Plant Operator, Portable Water Filtration Plant Operator.
49.95 30.95 + a
Group 18: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper;
(minimum for any job requiring CDL license), Rigger, Signalman.
46.6 30.95 + a
Surveyor: Chief of Party 50.21 30.95 + a
Surveyor: Assistant Chief of Party 46.3 30.95 + a
Surveyor: Instrument Man 44.55 30.95 + a
Surveyor: Rodman or Chairman 38.34 30.95 + a
**NOTE: SEE BELOW
----LINE CONSTRUCTION----(Railroad Construction and Maintenance)----
20) Lineman, Cable Splicer, Technician 59.91 34.00
21) Heavy Equipment Operator 53.92 31.88
22) Equipment Operator, Tractor Trailer Driver, Material Men 50.92 30.84
23) Driver Groundmen 44.93 28.47
23a) Groundman Experienced 32.95 13.99
----OUTSIDE LINE CONSTRUCTION----
24) Driver Groundmen 43.78 28.42
25) Groundmen 32.1 13.95
26) Heavy Equipment Operators 52.53 31.83
27) Linemen, Cable Splicers, Dynamite Men 58.37 33.94
28) Material Men, Tractor Trailer Drivers, Equipment Operators 49.61 30.79
29) Technician 56.12 32.85
----COMMUNICATION----
Sales & Service Technician: To include but not limited to: Installation, Repair, Splicing and Maintenance
52.07 20.62
----DREDGING----
Class A1: Mechanical Dredge Operator 48.48 17.32+a+b
Class B1: Maintenance Engineer 41.93 16.87+a+b
Class C1: Mate/Welder 38.38 16.62+a+b
Class D: Deckhand 30.86 16.09+a+b
Welders: Rate for craft to which welding is incidental.
Surveyors: Hazardous material removal: $3.00 per hour premium.
*Note: Hazardous waste removal work receives additional $1.25 per hour for truck drivers.
**Note: Hazardous waste premium $3.00 per hour over classified rate.
Truck Drivers: Trainers Premium: $3.00 over wage rate.
Truck Drivers: Night Premium - Mixer Drivers: $2.00 over wage rate.
Crane with 150 ft. boom (including jib) - $1.50 extra
Crane with 200 ft. boom (including jib) - $2.50 extra
Crane with 250 ft. boom (including jib) - $5.00 extra
Crane with 300 ft. boom (including jib) - $7.00 extra
Crane with 400 ft. boom (including jib) - $10.00 extra
All classifications that indicate a percentage of the fringe benefits must be calculated at the percentage rate times the "base hourly rate".
Apprentices duly registered under the Commissioner of Labor's regulations on "Work Training Standards for Apprenticeship and Training Programs" Section 31-51-d-1 to 12, are allowed to be paid the appropriate percentage of the prevailing journeymen hourly base and the full fringe benefit rate, providing the work site ratio shall not be less than one full-time journeyperson instructing and supervising the work of each apprentice in a specific trade.
~~Connecticut General Statute Section 31-55a: Annual Adjustments to wage rates by contractors doing state work
The Prevailing wage rates applicable to this project are subject to annual adjustments each July 1st for the duration of the project.
Each contractor shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor.
It is the contractor's responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor's website.
The annual adjustments will be posted on the Department of Labor's Web page:
www.ct.gov/dol. For those without internet access, please contact the division listed below.
The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project.
All subsequent annual adjustments will be posted on our Web Site for contractor access.
Contracting Agencies are under no obligation pursuant to State labor law to pay any increase due to the annual adjustment provision.
Effective October 1, 2005 - Public Act 05-50: any person performing the work of any mechanic, laborer, or worker shall be paid prevailing wage
All Person who perform work ON SITE must be paid prevailing wage for the appropriate mechanic, laborer, or worker classification.
All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership i.e.: (Owners, Corporate Officers, LLC Members, Independent Contractors, et.
al)
Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person.
~~Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clause (29 CFR 5.5 (a) (1) (ii)).
Please direct any questions which you may have pertaining to classification of work and payment of prevailing wages to the Wage and Workplace Standards Division, telephone (860)263-6790.
0024-075-01
CONNECTICUT DEPARTMENT OF LABOR
WAGE AND WORKPLACE STANDARDS DIVISION
Sec. 31-60-1.