FY20 Solar Arrays JA Brand Name Under SAT.pdf
PDF 750 KB Posted
- Attached to
- M67004-20-Q-0515; SOLAR ARRAYS
- Solicitation number
- M67004-20-Q-0515
- Issued by
-
United States Marine Corps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Amendment 0002 Solar Arrays.pdf | ||
| RFQ Amendment 0001 Solar Arrays.pdf | ||
| RFQ Solar Panels.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT
V 1.2 (22 March 2018)
MEMORANDUM TO THE FILE
Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION
FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED
ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
Nishati Expedition 450 Portable Solar Array
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
3. ___ OTHER REASONS
B. _X_ BRAND NAME
• The Marine Corps has paid to modify the firmware to meet the MCPIC 2.0’s information assurance (IA) requirements and allow for the power system’s remote monitoring over the Marine Corps Enterprise Network (MCEN). The firmware was modified to allow the system administrator to enter a static internet protocol (IP) address (as opposed to a dynamic IP address).
• The Marine Corps has made a significant investment in the Nishati Expedition™ 450 Portable Solar Array (PN: 217651) in order to support Maritime Prepositioning Force (MPF) exercises and contingencies. These solar panel arrays provide input power and charge to the portable power systems (LiFePO4 batteries) used by the Technical Advisory and Assistance Team (TAAT) for the prepositioning ship’s arrival and assembly. Unique cable interface and power specifications between the solar panel battery’s input power ports were designed and procured. Consequently using this common cable interface ensures the system’s interoperability with the other units and ensures cost effective logistics support (i.e., common parts, training, safety, etc.).
C. ___URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
4. If appropriate, include any additional pertinent information.
IV. CERTIFICATIONS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
9/15/2020
X Barbara Olson Barbara M. Olson Acquisition Support Analyst, G6 / EMD / ITAB Signed by: OLSON.BARBARA.M.1229983080
B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
| 2020-09-18T11:57:26-0400 | |
| ALEXANDER.JASON.CARL.1275814802 |
File details come from the government source that posted it. Updated .