FW-WHRI 13(1) Hydraulics Memo.pdf
PDF 552 KB Posted
- Attached to
- White River National Wildlife Refuge
- Solicitation number
- 693C73-20-B-000022
About this file
This document summarizes a federal solicitation for rehabilitation work at the White River National Wildlife Refuge in Arkansas. The solicitation seeks sealed bids from certified Small Business Concerns only for Project FW-WHRI 13(1), number 693C73-20-B-000022, to rehabilitate approximately 4.39 miles of Jack's Bay Landing Road. The work includes aggregate resurfacing, drainage improvements, improved signage, and miscellaneous tasks. The project cost is estimated between $1 million to $5 million. Construction cannot begin before June 2021 and must be completed by October 2021, with bid documents to be issued around June 30, 2020. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - FW-WHRI 13(1).pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| FP14_Eng.pdf | ||
| IFB Solicitation - FW-WHRI 13(1).pdf | ||
| VETS-4212 Form.pdf | ||
| Plans - FW-WHRI 13(1).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FHWA: W.Hiciano (6218) :zc 3/7/2018 M:\PROJECTS\_FWS\WHRI\13(1)\Techserv\Hydra\Reports\WHRI 13(1) Hydraulics Recommendations Memo.docx CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Form FHWA-201 U.S. DEPARTMENT OF TRANSPORTATION (Rev. 11-87) FEDERAL HIGHWAY ADMINISTRATION
MINUTE - MEMO
Use this form in lieu of transmittal slips within Dept. of Trans. when message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence.
SUBJECT: FWS-WHRI 13(1): Updated Hydraulics Memo
TO MESSAGE/COMMENT FROM/DATE
Ramesh Kotadia Project Manager
Shoukat Nawaz Highway Design Manager
We have updated our hydraulic analysis for this project per the Fish and Wildlife Services (FWS) request at the Plans-In-Hands (PIH) meeting. The FWS had requested to increase the size of the culvert for easier maintenance access to the culvert, due to the presence of beavers in this area. Beavers are a serious problem for culvert pipes as they create dams that impound water against the roadbeds, which may flood or wash out roads. Increasing the rise of culvert would facilitate better maintenance access.
We have completed the analysis for the existing 36-inch double barrel culvert located within the Dale Bumper White River National Wildlife Refuge in the Arkansas County, Arkansas. The culvert crossing, located at Station 60+26.04, had been identified by the FWS as a point with frequent overtopping. The culvert crossing is located on a two-way aggregate road that provides access to a camping area and a boat landing at the end of Jack’s Bay Landing Road. There are wetlands on both sides of the road. The area has been designated as high risk area with high incident of floods by the Federal Emergency Management Agency (FEMA) in their Flood Insurance Rate Map (FIRM). Due to the frequent flooding (usually from 8-10 feet of inundation at times) the Refuge requested increasing the size of the culverts to mitigate overtopping at this location. Please refer to Attachment 1 for a FIRM designation zone map.
Hydrologic and Hydraulic analysis were performed to determine the adequate size for the proposed culvert. A drainage area was delineated using Bentley Microstation with geo-referenced USGS quad maps into the software for the project site. The calculated drainage area for the site was
3.48 square miles and was verified with the United States Geological Survey (USGS) StreamStats application Version 3. Hydrology was performed using USGS StreamStats application Version 3, due to the size of the drainage area.
For a summary of flowrates please refer to Table 1.
Table 1: Flow Rates
Site 2 yr (cfs)
10 yr (cfs)
25 yr (cfs)
50 yr (cfs)
100 yr (cfs)
Sta.
60+26.04
336 723 942 1110 1280
Wendy Hiciano Hydraulics Engineer
THROUGH
Abhishek Kapoor Acting Hydraulics Team Leader
March 7, 2018
FHWA: W.Hiciano (6218) :zc 3/7/2018 M:\PROJECTS\_FWS\WHRI\13(1)\Techserv\Hydra\Reports\WHRI 13(1) Hydraulics Recommendations Memo.docx CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Hydraulic design was based on the 25-year storm in accordance the PDDM Chapter 7 for low standard roads, given that the posted speed is less than 50 mph. The hydraulic analysis for the existing structures were performed using HY-8, version 7.3
Sta. 60+24: 36 inch Double Barrel Culvert
Background and Observations:
The existing structure is a double 36 inches CMP culvert. The culvert is in an area with wetlands located on both sides of the road and several miles of drainage drains directly through the structure causing overtopping during periods of rain. The culvert receives flow from the upstream wetland, roadway ditches, and the flow from McPete Branch.
Given that this is a low speed and low volume road, replacing the culvert to completely prevent overtopping would require excessively increasing the size of the culvert. Increasing the size of the culvert would require increasing the road grade elevations, would impact the adjacent wetlands and additionally it would increase final project costs.
Recommendations:
Our recommendation will require a design exception due to minimum design standards not being met per PDDM. Recommendations provided on this memo are still based on the 25-year storm;
taking into account that overtopping will still occur. It is recommended to install a warning sign and water depth indicator to indicate possible flooding of the road and the water depth.
Riprap is not necessary for this site because current sites conditions do not show any signs of stream instability and/or any potential scour. We recommend replacing the existing structure with a 10 feet span by 5 feet rise Reinforced Concrete Pipe (RCP), and replacing the existing square edge headwall with 45 degrees skew wingwalls. See Table 2 for a summary of the proposed culvert data.
Table 2: Proposed Culvert Summary
Station Size (ft-in) Material Inlet El.
(ft)
Outlet El.
(ft)
Length (ft)
60+26.04 10’ span x 5’ rise RCP 148.190 147.87 25
The proposed recommendations will accommodate a 2-year storm event, with a headwater elevation of 153.41 feet, without any overtopping. Please refer to the Table 3 for a summary of the allowable headwater elevations.
Table 3: Allowable Headwater Elevations Event (Yr) Flow (cfs) AHW el. (ft) HW el. (ft)
2 336 153.55 153.33 25 942 153.55 155.84
Please let us know if you should have any questions or concerns.
wendy.hiciano Oval
| WHRI 13(1) Hydraulics Recommendations Memo_Ammendment |
| WHRI 13(1)_FIRM |
| 2018-03-07T15:42:16-0500 | |
| ABHISHEK KAPOOR |
| 2018-03-08T07:27:42-0500 | |
| WENDY HICIANO |
File details come from the government source that posted it. Updated .