Form260_FA_REPORT.pdf

PDF 165 KB Posted

Attached to
Avionics Control Unit (ACU) Federal contract opportunity
Solicitation number
SPRWA1-21-R-0023
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to Avionics Control Unit (ACU), newest first.
File Type Posted
CDRLs_A001_A014.pdf PDF
Engineering_Data_List.pdf PDF
Form1653_TRNSPDATA_REPORT.pdf PDF
SPRWA1-21-R-0023.pdf PDF
1280-01-514-5459AY.zip ZIP file
Form158_PKGRQMT_REPORT.pdf PDF
Form807_QAIRQMT_REPORT.pdf PDF
Statement_of_Work_ACU.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

08 APR 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

82918 / 754-11100-1

4. NSN

1280015145459AY

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM ITEM

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Contractor's Design Engineering Specifications

B. The detailed technical requirements for First Article approval tests are contained in

Section 4 of the B-52H Avionics Control Unit Source Control Drawing, 754-11100

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 10 days.

D. Contractor's notification to ACO and

407th SCMS/GUEA

(Requesting Activity) of test time and location due 60 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

Geoffrey D Bond

407 SCMS/GUEAE

235 BYRON ST STE 19A

ROBINS AFB, GA 31098-1670

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

calendar days from date contract.

calendar days prior to shipment.

F. FIRST ARTICLE DELIVERY

(1) Due within 300

(2) Notify 30

(3) Delivered to government at Geoffrey Bond

407 SCMS/GUEAE

235 BYRON ST STE 19A

ROBINS AFB, GA 31098-1670

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 270 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$597,661.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 22 Feb 2021

FIRST ARTICLE REQUIREMENTS 1. DATE

08 APR 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Bond, Geoffrey D

407 SCMS / GU E A

478-327-4660

497-4660

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 22 Feb 2021