| Project: STABILIZATION OF EXISTING CONDITIONS | | |
| Park: Fort Donelson National Battlefield | | |
| PMIS: FODO 199916 | | |
| Date: ___________________ | | |
| Item No. | Description | COST |
| Note: Items included within the cost of each Item No. appear below the line item where applicable. | | |
| A1000 | Mark-Ups |
| Federal Wage Rate |
| Standard General Conditions |
| Bonds |
| Contractor Overhead |
| Contractor Profit |
| A1010 | Foundations |
| Underpin Existing Foundations at Addition. |
| Clean and Coat Existing Rebar. |
| Install Sump Pump in existing Elevator Sump Pit and Core Drill through Pit |
| Provide Temporary Shoring at Elevator Addition Walls |
| A1030 | Slabs on Grade |
| Install Concrete Slab at Addition, including Sump Pit, Pump and Underslab Piping |
| B2010 | Exterior Walls |
| Infill Existing Wall Opening in Mechanical Room |
| Enclose opening at Basement and Addition. Provide Temp Door. |
| Enclose two openings at Main Level. |
| B3010 | Roof Coverings |
| Welding new Overlapping Sheets of TPO in some areas of Roof. |
| Continuous Termination Bar and Sealant at Roof Coping. |
| C3020 | Floor Finishes |
| Resilient tile |
| D3040 | HVAC Distribution |
| Dehumidifier and Fan and Tubing. |
| D5010 | Electrical Service & Distribution |
| Provide Receptacles and Rework Existing Panel for Dehumidifiers and Fans. |
| F2010 | Building Elements Demolition |
| Remove Carpet in Exhibit, Except under Exhibits |
| F2020 | Hazardous Components Abatement |
| Remove Asbestos Tile and Mastic under Rolling Shelves in Basement. Provide VCT and Reinstall Rolling Shelves. |
| Remove Asbestos Tile and Mastic at Stage in Theater. Remove Plywood as well. |
| Remove Carpet and Asbestos Mastic under Carpet in Theater. |
| G2040 | Site Development |
| Install Foundation Drain, Piping, Outlet, Gravel and Backfill at Addition |
| Z10 | General Conditions |
| Operations |
| Project Manager |
| Environmental Manager |
| Professional Engineer |
| Waste Management Coordinator, full time per div 01 specs |
| Historic Preservation Treatment Specialist |
| Site Safety and Health Officer |
| Contractor Quality Control Manager |
| Preconstruction Services |
| Supervision: Field |
| Superintendent, full time |
| Laborer #1 |
| Equipment: Superintendent's |
| Pick-up trucks |
| Small tools, gang boxes, etc. |
| Trailers: Temporary |
| Trailer, field office, GC, 1 each, monthly rental |
| Trailer, field office, CO, 1 each, monthly rental |
| Trailer, storage, 1 each, monthly rental |
| Equipment deliver, set, return |
| Misc preparations: Construct steps, etc |
| Toilets: Temporary |
| Toilet, temporary, 2 each, monthly rental |
| Equipment deliver, set, return |
Equipment, Temporary
| General |
| Small tool & misc ltd rentals ** |
| ** Charged to specific dir cost fields |
| Safety & Protections |
| Traffic controls |
| Hot weather masonry conditions, allowance |
| Cold weather masonry conditions, allowance |
| First aid kit, misc safety items |
| Fencing, limit of disturbance, rental |
| Temporary storm water management |
| Staging, Vehicular Access & Parking |
| Temporary roads/staging maintenance |
| Site Signage: Temporary |
| Sign, project, install & remove, custom |
| Sign, GC, install & remove, pro-rated across multiple uses |
| Bulletin board, GC, install & remove, pro-rata |
| Communications Services |
| Landlines, hook-up charge |
| Landline, usage, office |
| Fax, scanner, copier 3-in-1 purchase for & clerk of wks |
| Landline, usage, fax for & clerk of works |
| Cell phones incl radio per phone per month |
| Wi-Fi access |
| Digital camera purchase |
| Electrical Power Services |
| Electrical service, connection, trailers |
| Electrical service to the trailers |
| Potable Water Services |
| Water hook-up |
| Water usage |
| Bottled water, cups, for personnel only |
Fuel: Permanent HVAC Equipment
| Inspections & Testing |
| Inspections & testing |
| Mockups |
| Project Scheduling |
| As-planned schedule, independently prepared |
| Schedule updates |
| Monthly plotting, shipping expenses, etc. |
| Clean-Up & Punchlist |
| Final punch list and clean-up [L] |
| Final punch list and clean-up [M] |
| Final clean-up: Cleaning subcontractor |
| Clean streets, manually, over life of project |
| Disposal |
| Dumpster, 30 CY general use, charged by the pull |
| Regulatory Permits |
| Office Supplies & Reprographics |
| Field office supplies |
| FEDEX & courier fees |
| Specifications |
| Drawing reprographics |
TOTAL BASE BID $0.00