AMD05_FN1462-19.pdf
PDF 45 KB Posted
- Attached to
- Wire Decking
- Solicitation number
- FN1462-19
- Issued by
-
Department of Justice Bureau of Prisons
About this file
AMD05 FN1462-19
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AMD05 12/11/18
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
FEDERAL PRISON INDUSTRIES, UNICOR
400 FIRST STREET, N.W.
WASHINGTON, DC 20534
ATTN: Kimberly Schwinn, Contract Specialist
SEE BLOCK 6.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
FN1462-19 ⊠
9B. DATED (SEE ITEM 11)
10/02/18
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers _ is extended, XXX__ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
D. OTHER (Specify type of modification and authority)
E. IMPORTANT : Contractor __ is not, ⊠ is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The solicitation identified in block 10 A is hereby modified as followed:
Questions & Answers.
The drawings do not reference a full part number as that is asterisked out. They also do not include the depth or width of the wire deck requested. The drawings are master drawings for each type of deck – (For Standard beams: Inside waterfall, outside waterfall, flush mount) (For 2” Beams: Inside waterfall, outside waterfall, flush mount). The depth and width are specific to the individual CLIN #.
The drawings show a .90 distance between the edge wire on each side to the next wire. Is this required? It limits the machines we can run it on and would require custom templets to be made for each size that require them to be made this way. All wire is 2”x4” spacing. The drawings show the 2” TYP and 4” TYP, but on the ends it does show .90” or 1.90” . This end spacing is going to vary based on the actual width of the required dimension of the deck. In most cases, it will be necessary to adjust the spacing in from the typical 2” on the left and right side.
On all (4) option sheets attached to the solicitation the very first item is not listed. Item 1 PRKDK2FM1834 is missing? That is correct this item has been removed form the RFP.
Have 90 plus part numbers been eliminated? Many items have been deleted from the RFP. Proposals should only include items from Revised Section B Spreadsheet 1, Spreadsheet 2, Spreadsheet 3 & Spreadsheet 4.
Should I prepare my pricing to match ONLY the part numbers on the “Revised Section B spreadsheets or should I provide pricing on all line items (items 0001 – 00149) on the solicitation? ONLY prepare pricing to match the part numbers on the “Revised Section B spreadsheets.
As provided, all other terms and conditions remain unchanged.
A signed copy of this solicitation must be included with your proposal.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Kimberly Schwinn, Contract Specialist
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
___________________________________________ BY _________________________________________ 12/11/2018 (Signature of the person authorized to sign) (Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR(48 CFR) 53.243
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
File details come from the government source that posted it.